PROJECT:- EFESON (ATAYE) -MEHAL MEDA ROAD PROJECT

CONSULTANT:- CORE Consulting Engineers Pvt. Ltd. Co.


CONTRACTOR:- YENCOMAD Construction Pvt. Ltd. Co.
Quantity of LD-type E (Concrete)
Precast Ditch Cover
Station (km) Precast Concrete U-shape Ditch (0.7x0.8m) (0.8x0.3x0.15m)

Class-A Class-A
Length Concrete Reinforcement No. of Ditch Concrete Reinforcement
From To Side Shape (m) Area (m2) Volume (m3) (ton) cover Volume (m3) of cover (ton) Remarks
0+000 2+480 BHS Type E 4960 0.20 992 32 16,534 543.15 63.60
Concrete Volume = 0.06045 m3
per one precast cover
55+920 56+750 BHS Type E 1660 0.20 332 11 5,534 181.80 21.29

56+750 58+020 RHS Type E 1270 0.20 254 8 4,234 139.10 16.29 Reinforcement= 3.8465 Kg per
one precast cover & =6.37 Kg per
56+750 58+020 LHS Type E 1270 0.20 254 8 4,234 139.10 16.29 linear meter of precast ditch

Total Sum = 9,160.00 1,832.00 58.35 30,537 1,003.15 117.46

Walk way Quantity


Station (km) 100mm
Pre-cast compacted 150mm
Length( Concrete Tile
Side red Granular sub-
From To m) (m2) ash/cinder base (m3)
(m3)
0+000 2+500 BHS 5000 8500.00 850.00 1275.00
55+920 56+750 BHS 1660 2822.00 282.20 423.30
56+750 58+020 RHS 1270 2159.00 215.90 323.85
56+750 58+020 LHS 1270 2159.00 215.90 323.85
Total Sum = 9,200 15,640.00 1,564.00 2,346.00

Item Description Unit Quantity Rate(ETB) Amount (ETB) Remark

High tensile steel reinforcement


32.10(b) for Road side ton 58.35 49,025.00 2,860,569.53
ditches

Cast in Concrete Lining Class 'A'


33.08(a) ( Road Side m3 1,832.00 4,854.00 8,892,528.00
ditch)
33.08(b) Cast in Concrete Lining Class 'C' m3 - 3,854.00 -
( Road Side ditch)

34.04 Concret Pitching


Pre-cast concrete blocks for Side m2 15,640.00 745.00 11,651,800.00
walk pavement
m3 1,564.00 265.00 414,460.00
54.01(a) Gravel Wearing course
Gravel subbase layer, 97%MDD, m3 2,346.00 265.00 621,690.00
51.01(a)ii AASHTO T-180 24,441,048 Total cost exempting ditch cover
34.08 Concret Drain cover
Here,the unit is in No. the total
cost can't be compared, but
No. 30,537 2,635.00 80,465,873.33 total quantity is as shown above
Pre-cast concrete drain covers for both cases
(0.8mx0.3mx0.15m)
PROJECT:- EFESON (ATAYE) -MEHAL MEDA ROAD PROJECT
CONSULTANT:- CORE Consulting Engineers Pvt. Ltd. Co.
CONTRACTOR:- YENCOMAD Construction Pvt. Ltd. Co.
Quantity of LD-type E (Masonry)
Class-C Concrete Precast Ditch Cover (1.6x0.3x0.15)
Station (Invert lining) Class-A Masonry
Length Volume No. of Concrete Reinforcement Area
From To Side Shape (m) Area (m2) (m3) Ditch cover Volume (m3) of cover (ton) (m2) Volume (m3) Remarks
0+000 2+480 BHS Type E 4960 0.08 397 16,534 999.50 127.20 0.56 2777.60 Concrete Volume =
0.06045 m3 per
55+920 56+750 BHS Type E 1660 0.08 133 5,534 334.55 42.58 0.56 929.60 one precast cover

56+750 58+020 RHS Type E 1270 0.08 102 4,234 255.97 32.57 0.56 711.20 Reinforcement
= 7.693kg per
56+750 58+020 LHS Type E 1270 0.08 102 4,234 255.97 32.57 0.56 711.20 one precast cover

Total Sum = 9,160.00 732.80 30,537 1,845.98 234.92 5,129.60

Walk way Quantity


Station (km) 100mm 150mm
Pre-cast compacted
Length( Concrete Tile Granular
Side red
m) (m2) ash/cinder
sub-base
From To (m3)
(m3)

0+000 2+500 BHS 5000 2900.00 290.00 435.00


55+920 56+750 BHS 1660 962.80 96.28 144.42
56+750 58+020 RHS 1270 736.60 73.66 110.49
56+750 58+020 LHS 1270 736.60 73.66 110.49
Total Sum = 9,200 5,336.00 533.60 800.40

Item Description Unit Quantity Rate (ETB) Amount (ETB)

Cement-mortared stone walls m3 5,129.60 1,820.00 9,335,872


34.03(b) ( for U gutter )
High tensile steel reinforcement
for Road side ton - 49,025.00 -
32.10(b) ditches
Cast in Concrete Lining Class
'A' ( Road m3 - 4,854.00 -
33.08(a) Side ditch)
Cast in Concrete Lining Class 'C' ( m3 732.80 3,854.00 2,824,211.20
33.08(b) Road Side ditch)

34.04 Concret Pitching


Pre-cast concrete blocks for Side m2 5,336.00 745.00 3,975,320.00
walk pavement
m3 533.60 265.00 141,404.00
54.01(a) Gravel Wearing course (7,952,134)
Gravel subbase layer, 97%MDD, m3 800.40 265.00 212,106.00
51.01(a)ii AASHTO T-180 16,488,913 Total cost exempting ditch cover

34.08 Concret Drain cover


Pre-cast concrete drain covers No. 30,537 2,635.00 80,465,873.33 Here, the unit is in No. the total cost can't be compared, but
(1.6mx0.3mx0.15m) total quantity is as shown above (Almost Double)
PROJECT:- EFESON (Ataye) -MEHAL MEDA ROAD PROJECT
CONSULTANT:- CORE Consulting Engineers Pvt. Ltd. Co.
CONTRACTOR:- YENCOMAD Construction Pvt. Ltd. Co.
Pedestrian Crossings (1m Length)
Chainage Type of No. of Precast Concrete
No. Side
From / At Crossing Cover Required Volume (m3)
1 0+060 BHS Pedestrian 4 0.304
2 0+080 RHS Pedestrian 2 0.152
3 0+210 LHS Pedestrian 2 0.152
4 0+310 LHS Pedestrian 2 0.152
5 0+380 LHS Pedestrian 2 0.152
6 0+700 RHS Pedestrian 2 0.152
7 1+020 BHS Pedestrian 4 0.304
8 1+065 RHS Pedestrian 2 0.152
9 1+090 RHS Pedestrian 2 0.152
10 1+130 RHS Pedestrian 2 0.152
11 1+150 BHS Pedestrian 4 0.304
12 1+215 BHS Pedestrian 4 0.304
13 1+570 RHS Pedestrian 2 0.152
14 1+720 BHS Pedestrian 4 0.304
15 1+835 BHS Pedestrian 4 0.304
16 1+970 LHS Pedestrian 2 0.152
17 2+305 BHS Pedestrian 4 0.304
18 24+150 BHS Pedestrian 4 0.304
19 24+320 BHS Pedestrian 4 0.304
20 24+530 BHS Pedestrian 4 0.304
21 24+610 RHS Pedestrian 2 0.152
22 30+470 BHS Pedestrian 4 0.304
23 30+620 BHS Pedestrian 4 0.304
24 30+750 BHS Pedestrian 4 0.304
25 56+040 LHS Pedestrian 2 0.152
26 56+840 BHS Pedestrian 4 0.304
27 57+220 BHS Pedestrian 4 0.304
28 57+650 RHS Pedestrian 2 0.152
29 57+860 BHS Pedestrian 4 0.304
Total Sum = 90 6.840
Vehicles Crossings (3m Length)
1 0+075 RHS Vehicle 10 0.6
2 0+180 RHS Vehicle 10 0.6
3 0+200 RHS Vehicle 10 0.6
4 0+300 RHS Vehicle 10 0.6
5 0+350 RHS Vehicle 10 0.6
6 0+400 RHS Vehicle 10 0.6
7 1+420 RHS Vehicle 10 0.6
8 2+255 LHS Vehicle 10 0.6
9 56+085 LHS Vehicle 10 0.6
10 56+990 LHS Vehicle 10 0.6
11 57+150 LHS Vehicle 10 0.6
12 57+200 LHS Vehicle 10 0.6
13 57+300 LHS Vehicle 10 0.6
14 57+400 LHS Vehicle 10 0.6
15 57+480 LHS Vehicle 10 0.6
16 57+685 LHS Vehicle 10 0.6
Total Sum = 160 9.600
Grand Total = 16.440
gth)
Reinforcement
Remarks
(ton)
0.003 1.6X0.3X0.15 0.072
0.002
0.002 Concrete Volume =
0.072 m3 per one
0.002 precast cover
0.002
0.002
0.003
0.002 Reinforcement
= 7.693kg per one
0.002 precast cover
0.002
0.003
0.003
0.002
0.003
0.003
0.002
0.003
0.003
0.003
0.003
0.002
0.003
0.003
0.003
0.002
0.003
0.003
0.002
0.003
0.069
h)
0.020 1.6X0.5X0.15 0.12
0.020
0.020 Concrete Volume =
0.120m3 per one
0.020 precast cover
0.020
0.020
0.020
0.020 Reinforcement
= 19.889kg per
one precast cover
Reinforcement
= 19.889kg per
0.020 one precast cover
0.020
0.020
0.020
0.020
0.020
0.020
0.020
0.318