Project Change Order#2- Brunswick Square Parking System
Change order was verbally approved by Matthew Zed during a site meeting with
Tax Summary 750.00
Adam Crossman (Crossman Controls-WPS subcontractor) on March 19, 2019. HST 112.50
Covered by
The contractor performing the garage surface restoration work requested that all 0.00
0.00
parking equipment be removed from the Union Street garage parking control
Contract
0.00
islands in order to eliminate the possibility of the parking equipment getting 112.50
0.00
damaged.
0.00 0.00
Less Payment
862.50