You are on page 1of 4
LABUAN UNITED CONSTRUCTION SDN. BHD. (Co. No. 682947-X) Ref: LUCGROWBALLILT/18/041/GBD We Acknowledge Receipt Date: 13" August, 2018 GROWBALL DEVELOPMENT SDN BHD. Ate Lot B 017, 1* Floor, Podium Level, Financial Park Complex, 87000 W.P.Labuan. 1378/201@ Times (I-00 P.O. Box $0696 , 87016 W.P.Labuan Name: Nua ATOR @. mao rAKAY Tel : 087-422666 Fax: 087-423623 teWo : qlouo¥—Is —SDI0 Email : growballdev@gmail.com Attention :- Mr. Carlos G. Cheng Dear sir, PERMOHONAN PELAN BANGUNAN BAGI TUJUAN CADANGAN PEMBANGUNAN BERCAMPUR BERIKUT :- Fasa1 1) PEMBINAAN 4 UNIT RUMAH KEDAI 2 TINGKAT ( BLOCK TITLE AKAN DIPOHON) 2) PEMBINAAN 4 UNIT RUMAH KEDAL3 TINGKAT ( BLOCK TITLE AKAN DIPOHON) 3) PEMBINAAN 80 UNIT APARTMENT 5 TINGKAT (STRATA TITLE AKAN DIPOHON ) Future Development : 1) PEMBINAAN 180 UNIT APRATMENT 5 TINGKAT DAN 16 UNIT APARTMENT (BLOCK C-F) (STRATA TITLE AKAN DIPOHON ) DI ATAS TANAH SELUAS 4.071 HA(+-10.06AC),PN 2258, LOT 205224657 & PN 2259 LOT. 205224648, JALAN OKK DAUD, KG. GANGGARAK, W.P.LABUAN Subject ;- __ EXTERNAL ACCESS ROAD AND DRAINAGE (OFF $ TE) We wish to point out the following ~ 1) The construction of the extemal access road ( to join Jalan OKK Daud) and the external drainage (in front of project site ) is currently under our scope , on a PROVISIONAL basis. 2) The existing Culvert invert level, nearest to the project site is 8.29m approximately ,and it had been ponded with water at all times. 3) We have reason to believe that JKR has not issue approval for the design of the this part of drainage ( please refer chronology of events attached ) 4) Drawings for this portion of work has not been issued to us officially, although we have some preliminary copy. Based on the available information, 1) The 1.0m wide trapezoidal earth drain is about 110m long and the invert level is from 9.480m AMSL to 9.23m AMSL. 2) The 3 manhloes near the access road is having invert levels of 9.23m , 9.19m and 9,23m respectively, while the invert level of the existing road crossing culvert is 8.29m approximately. 3) The distance of the earth drain from the boundary line is not known at the present moment, A sketch is attached herewith for your reference. We would be most grateful, if you can kindly confirm to us, the exact location of the earth drain , as well as the connecting manholes with invert levels , in writing, for us to proceed with the work, as soon as possible, as we are trying to meet your dateline of November ,2018 ( as per the meeting dated 01.06.2018 ) IR 10/14 LUSU Warehouse, Jalan Patau-Patau, PO, Box 81329, 87023 WP, Labuan, Walaysia Tel: 087-412637, 413255, 411993 Fax: 418637 LABUAN UNITED CONSTRUCTION SDN. BHD. (Co. No. 682947-X) Ref : Date: 13” August, 2018 LUC/GROWBALLILT/18/041/GBD ( Continued) ‘Your early confirmation is crucial to ensure the completion as soon as possible. ‘Thank you in advance. ‘Yours faithfully, For Labuan United Construction Sdn Bhd (Ho Chiew Kiang| Project Manager cc:- Perunding TAC Attention : ‘Arkitek Allan Wong Attentio CYES Konsult Attention : IR. Tan Ah Chai Mr. Lawrence Chong IR. Foo Ming Chiu TR 10/14 LUSU Warehouse, Jalan Patau-Patau, P.O. Box 81329, 87023 WP. Labuan, Malaysia Tel: 087-812697, 413255, 411993 Fax: 418637 The following in the chronology of the external drainage and external road connection [Date EVENT [REFERENCE 22.03.2018 09.04.2018 04.05.2018 01.06.2018 05.06.2018, 06.06.2018 13.06.2018 20.07.2018 Perbadanan Labuan Approved the phasing plan for the project Perunding TAC wrote to JKR on this matter LKR replied to Perunding TAC on the following :- (2) Submitted Plan is different from the plan in TIA approval (2) Developer to upgrade road side drain (3) Photos showing the road crossing culvert and road side |drain need to be monitored. (4)Developer is requested to submit topographic survey for the road reserve from the project site to the Monsoon drain near Kole} Matrikulasi Labuan. Developer and LUC to meet JKR on the road junction matter for JKR Requirement, and "culvert for the drainage across the project site should be lowered or re-align” |during the discussion between JKR and Developer, JKR informed] {that the road junction shall be concurrent with the approved phased development plan. IPerunding TAC submitted external road design revision to JKR LJKR replied to acknowledged their knowledge of the phased development for this project Perunding TAC to submit revised plan for access road and drainage for phase 4 , as the earlier submission was based on the project overall [Developer is requested to submit topographic survey for the road reserve from the project site to the Monsoon drain near Kole} Matrikulasi Labuan, Licensed Surveyor provide External Reserve Topographic survey land GrowBall Emailed to Perunding TAC |TAC/2015-11/IKR/02 (08}4Im sKR.WPI.060.010/004 (i )sld.2 (7) Minutes of Meeting 01.06.2018 HTAC/2015-11/IKR/02 (26}dIm.4kR.WPL.060.010/004{ti \id.2 |18YF12{ Topo along JIn IMerinding ( caros ).dwg 205345062 20123883 107-G-6 9s ese i YN TBM iydrant 11.774 (AMSL) _ Nail on Fire H Py With R.L: 205345080 56-OC-52

You might also like