Sharjah National Oil Company (SNOC) jetty was damaged due to vessel collision. Project site is located on Hamriyah Port Marine Terminal, Sharjah.
BLP scope is to propose and design a new
support system for the walkway.
Design
After reviewing different options and with
feasibility perspective, a vertical two pile system is proposed as the new walkway support system.
Various loads acting on the walkway are
studied and evaluated. Vertical capacity of the pile is estimated using Nordlund method and Oasys Alp software is used for lateral analysis. Analyses were made for the support system in both limit and service state conditions with load combinations as per Eurocode 7.