You are on page 1of 1

S.M.Engineers & Consultants Project : M/s. CONCORDE TEXTILE Date: 13.12.

12

Power Cable Schedule - UPS Installation Rev : 0

Size in Sq.mm

Actual Length
Current in (A)

Type of Cable

Voltage Drop
Total Length

Termination
No. of Runs

No.of Cores
Rating (A)

Length in
Cable No.

Full Load

Remarks
Breaker

Voltage

in Mtrs.
Circuit

No. of

(In %)
From

in (V)

Mtrs.
To

(*)
XLPE Al.
1 200KVA Stabilizer By pass Transfer Switch 400 - 1.1 1 3.5 240 25 25 2
Ar.
Cu.
2 By pass Transfer Switch 200KVA UPS 400 - 1.1 4 1 150 10 40 8
Flexible
Cu.
3 200KVA UPS By pass Transfer Switch 400 - 1.1 4 1 150 10 40 8
Flexible
XLPE Al.
4 By pass Transfer Switch UPS Panel (Existing) 400 - 1.1 1 3.5 240 15 15 2
Ar.
XLPE Al.
5 150KVA Stabilizer Panel By pass Transfer Switch 250 - 1.1 1 3.5 185 125 125 2
Ar.
Cu.
6 By pass Transfer Switch 60KVA UPS 125 - 1.1 4 1 35 10 40 8
Flexible
Cu.
7 60KVA UPS By pass Transfer Switch 125 - 1.1 4 1 35 10 40 8
Flexible
XLPE Al.
8 By pass Transfer Switch Sizing Machine 250 - 1.1 1 3.5 185 100 100 2
Ar.
XLPE Al.
9 125KVA Stabilizer DB - 1K 125 - 1.1
Ar.
1 3.5 70 100 100 2 **
PVC Al.
10 DB - 2B 63A, TPN, Isolator 63 - 1.1
Ar.
1 4 25 100 100 2 **
PVC Al.
11 15KVA UPS UPS DB 63 - 1.1 1 4 25 15 15 2
Ar.

Note: * Actual Length to be filled by the Contractor based on site conditions and to be submitted to Consultant for Approval.

** Existing cable length to be checked at site, for rerouting.