SIP BOQ ABSTRACT OF QUANTITIES

Sewer Line MH IC
Sl.No. Item Unit Rising Main Total Qty Calculated Remarks
Jhalawar Patan Total Jhalawar Patan Total Jhalawar Patan Total

1.00 Road Cutting


1.01 BT Cum 768.98 351.89 1120.87 288.63 82.59 371.22 685.59 343.44 1029.04 103.86 2625.00
1.02 WBM Cum 6912.33 2164.99 9077.32 1472.42 418.87 1891.30 3382.64 1677.97 5060.62 669.48 16699.00
1.03 CC Cum 9348.81 2952.59 12301.40 1644.74 524.41 2169.16 5085.42 2691.32 7776.75 731.26 22979.00
1.04 Interlocking Tiles Sqm 1971.91 357.37 2329.28 485.72 59.43 545.15 880.95 272.06 1153.01 0.00 4028.00
Reusing 80% 3223.00
Supply & Using 30% 806.00
2.00 Excavation in Soil
2.01 0m to 1.5m Cum 46754.43 9575.81 56330.24 7032.46 1612.76 8645.21 17608.96 6245.84 23854.80 0.00 88831.00
2.02 1.5m to 3.0m Cum 8294.81 955.04 9249.85 1763.94 236.48 2000.42 0.00 0.00 0.00 0.00 11251.00
2.03 3.0m to 4.5m Cum 1207.15 68.07 1275.22 246.88 12.27 259.15 0.00 0.00 0.00 0.00 1535.00
2.04 4.5m to 6.0m Cum 153.48 0.00 153.48 28.86 1.41 30.27 0.00 0.00 0.00 0.00 184.00
2.05 6.0m to 7.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.06 7.5m to 9.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.07 9.0m to 10.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.08 10.5m to 12.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.09 12.0m to 13.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.10 13.5m to 15.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.00 Excavation in Ordinary Rock


3.01 0m to 1.5m Cum 25568.21 9486.16 35054.37 4219.60 1561.78 5781.39 12789.27 8225.49 21014.77 0.00 61851.00
3.02 1.5m to 3.0m Cum 8711.97 3595.83 12307.80 1825.77 624.93 2450.70 0.00 0.00 0.00 0.00 14759.00
3.03 3.0m to 4.5m Cum 865.60 396.85 1262.45 218.32 61.89 280.21 0.00 0.00 0.00 0.00 1543.00
3.04 4.5m to 6.0m Cum 8.57 51.94 60.50 18.65 12.71 31.36 0.00 0.00 0.00 0.00 92.00
3.05 6.0m to 7.5m Cum 0.00 0.00 0.00 4.81 6.85 11.66 0.00 0.00 0.00 0.00 12.00
3.06 7.5m to 9.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.07 9.0m to 10.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.08 10.5m to 12.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.09 12.0m to 13.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.10 13.5m to 15.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4.00 Excavation in Hard Rock


4.01 0m to 1.5m Cum 1712.85 2653.58 4366.43 201.95 403.79 605.74 113.92 865.15 979.08 0.00 5952.00
4.02 1.5m to 3.0m Cum 5442.90 3231.71 8674.61 1082.84 676.14 1758.97 0.00 0.00 0.00 0.00 10434.00
4.03 3.0m to 4.5m Cum 1689.38 1535.76 3225.14 452.29 364.10 816.39 0.00 0.00 0.00 0.00 4042.00
4.04 4.5m to 6.0m Cum 198.96 553.80 752.77 48.00 148.69 196.69 0.00 0.00 0.00 0.00 950.00
4.05 6.0m to 7.5m Cum 24.45 147.53 171.98 2.26 54.20 56.46 0.00 0.00 0.00 0.00 229.00
4.06 7.5m to 9.0m Cum 0.00 9.90 9.90 4.96 10.84 15.80 0.00 0.00 0.00 0.00 26.00
4.07 9.0m to 10.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.08 10.5m to 12.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.09 12.0m to 13.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.10 13.5m to 15.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.00 Extra for Excavation in Saturated Soil


5.01 0 to 1.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 666.47 667.00
5.02 1.5m to 3.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.03 3.0m to 4.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.04 4.5m to 6.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.05 6.0m to 7.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.06 7.5m to 9.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.07 9.0m to 10.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.08 10.5m to 12.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.09 12.0m to 13.5m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.10 13.5m to 15.0m Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.00 Carriage of Material (Lead 0km to 1.0km)


5.01 Gravel Cum 212.55 94.59 307.14 25.39 17.15 42.54 61.88 91.65 153.53 14.79 518.00
5.02 Earth Cum 3450.01 114.98 3565.00 985.63 503.64 1489.27 0.00 0.00 0.00 60.38 5115.00
5.03 Rock Cum 4250.91 1891.89 6142.79 507.79 343.00 850.79 1237.59 1832.95 3070.54 295.77 10360.00

6.00 Carriage of Material (Lead 1km to 2.0km)


6.01 Gravel Cum 198.17 102.60 300.78 44.66 12.77 57.44 116.71 79.72 196.43 4.26 559.00
6.02 Earth Cum 15370.44 9635.57 25006.00 2651.38 1123.17 3774.55 1579.28 0.00 1579.28 0.00 30360.00
6.03 Rock Cum 3963.45 2052.05 6015.50 893.28 255.46 1148.75 2334.23 1594.41 3928.64 85.21 11179.00

7.00 Carriage of Material (Lead 2km to 3.0km)


SIP BOQ ABSTRACT OF QUANTITIES

Sewer Line MH IC
Sl.No. Item Unit Rising Main Total Qty Calculated Remarks
Jhalawar Patan Total Jhalawar Patan Total Jhalawar Patan Total
7.01 Gravel Cum 273.69 0.00 273.69 50.53 19.22 69.75 150.74 0.00 150.74 52.94 548.00
7.02 Earth Cum 15984.86 686.19 16671.05 3040.13 1084.09 4124.22 0.00 0.00 0.00 789.42 21585.00
7.03 Rock Cum 5473.83 0.00 5473.83 1010.63 384.41 1395.04 3014.74 0.00 3014.74 1058.81 10943.00

8.00 Carriage of Material (Lead 3km to 4.0km)


8.01 Gravel Cum 0.00 0.00 0.00 0.96 0.00 0.96 0.00 0.00 0.00 0.00 1.00
8.02 Earth Cum 700.18 4257.78 4957.97 0.00 410.93 410.93 0.00 0.00 0.00 0.00 5369.00
8.03 Rock Cum 0.00 0.00 0.00 19.25 0.00 19.25 0.00 0.00 0.00 0.00 20.00

9.00 Carriage of Material (Lead 4km to 5.0km)


9.01 Gravel Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.02 Earth Cum 2497.79 4732.60 7230.39 175.53 443.10 618.63 0.00 0.00 0.00 0.00 7850.00
9.03 Rock Cum 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10.00 Carriage of Material (Lead 5km to 6.0km)


10.01 Gravel Cum 6.08 0.00 6.08 0.91 0.00 0.91 5.70 0.00 5.70 0.00 13.00
10.02 Earth Cum 479.82 587.55 1067.37 49.14 68.10 117.24 0.00 0.00 0.00 0.00 1185.00
10.03 Rock Cum 121.57 0.00 121.57 18.24 0.00 18.24 114.09 0.00 114.09 0.00 254.00

11.00 Barricading
11.01 PVC Tape Rmt 40649.03 11042.28 51691.30 924.32 743.86 1668.18 0.00 0.00 0.00 0.00 53360.00
11.02 GI Sheet Sqm 2476.94 2977.42 5454.37 7765.54 2199.60 9965.14 0.00 0.00 0.00 2866.32 18286.00
11.03 MS Pipe Rmt 49678.42 15242.93 64921.35 44818.22 12492.08 57310.30 0.00 0.00 0.00 7485.50 129718.00

12.00 DWC Pipe


12.01 200mm Dia Rmt 80103.50 22912.39 103015.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 103016.00
12.02 250mm Dia Rmt 1905.18 1142.13 3047.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3048.00
12.03 300mm Dia Rmt 206.44 0.00 206.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 207.00

13.00 RCC Pipe


13.01 200mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.02 250mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.03 350mm Dia Rmt 467.12 557.42 1024.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1025.00
13.04 400mm Dia Rmt 27.18 0.00 27.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00
13.05 450mm Dia Rmt 539.90 0.00 539.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 540.00
13.06 500mm Dia Rmt 213.92 0.00 213.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 214.00
13.07 550mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.08 600mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

14.00 HDPE Pipe for all Depth- In Soil


14.01 200mm Dia Rmt 66.00 191.00 257.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 257.00
14.02 250mm Dia Rmt 0.00 148.00 148.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 148.00
14.03 300mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.04 350mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.05 400mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.06 450mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.07 500mm Dia Rmt 180.00 0.00 180.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 180.00
14.08 550mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14.09 600mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

15.00 HDPE Pipe for all Depth - In Soft Rock


15.01 200mm Dia Rmt 928.30 273.00 1201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1202.00
15.02 250mm Dia Rmt 1874.00 779.00 2653.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2653.00
15.03 300mm Dia Rmt 0.00 30.00 30.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00
15.04 350mm Dia Rmt 118.00 0.00 118.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 118.00
15.05 400mm Dia Rmt 369.00 0.00 369.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 369.00
15.06 450mm Dia Rmt 56.00 0.00 56.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.00
15.07 500mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.08 550mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15.09 600mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

16.00 HDPE Pipe for all Depth - In Hard Rock


16.01 200mm Dia Rmt 3041.00 1030.00 4071.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4071.00
16.02 250mm Dia Rmt 1962.00 571.00 2533.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2533.00
16.03 300mm Dia Rmt 2063.00 0.00 2063.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2063.00
16.04 350mm Dia Rmt 781.00 116.00 897.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 897.00
16.05 400mm Dia Rmt 974.00 0.00 974.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 974.00
16.06 450mm Dia Rmt 1271.00 0.00 1271.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1271.00
SIP BOQ ABSTRACT OF QUANTITIES

Sewer Line MH IC
Sl.No. Item Unit Rising Main Total Qty Calculated Remarks
Jhalawar Patan Total Jhalawar Patan Total Jhalawar Patan Total
16.07 500mm Dia Rmt 106.00 0.00 106.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 106.00
16.08 550mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.09 600mm Dia Rmt 30.00 0.00 30.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00

17.00 Driven Pit


17.01 In all type of Soil Rmt 0.00 0.00 0.00 84.72 0.40 85.12 0.00 0.00 0.00 0.00 86.00
17.02 In Rock Rmt 0.00 0.00 0.00 1194.05 293.99 1488.04 0.00 0.00 0.00 0.00 1489.00

18.00 Bedding
18.01 GRB-110mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 70719.59 32465.40 103184.99 0.00 103185.00
18.02 GRB-200mm dia Rmt 79002.41 22598.29 101600.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 101601.00
18.03 GRB-250mm dia Rmt 1877.88 1126.53 3004.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3005.00
18.04 GRB-300mm dia Rmt 204.04 0.00 204.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 205.00
18.05 GRB-350mm dia Rmt 461.42 550.22 1011.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1012.00
18.06 GRB-400mm dia Rmt 26.58 0.00 26.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.00
18.07 GRB-450mm dia Rmt 533.90 0.00 533.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 534.00
18.08 GRB-500mm dia Rmt 211.22 0.00 211.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 212.00
18.09 GRB-550mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.10 GRB-600mm dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

19.00 Precast Manholes


19.01 Type A - 0 to 1.65m Nos 0.00 0.00 0.00 2548.00 729.00 3277.00 0.00 0.00 0.00 0.00 3277.00
19.02 Type B - 1.65 to 2.5m Nos 0.00 0.00 0.00 790.00 196.00 986.00 0.00 0.00 0.00 0.00 986.00
19.03 Type C - >2.65m Nos 0.00 0.00 0.00 1034.00 287.00 1321.00 0.00 0.00 0.00 0.00 1321.00

20.00 RR Manholes
20.01 Type A - 0.9m Dia- 0 to 1.65m Depth Nos 0.00 0.00 0.00 101.00 87.00 188.00 0.00 0.00 0.00 0.00 188.00
20.02 Type B - 1.2m Dia- 1.65 to 2.5m Nos 0.00 0.00 0.00 16.00 17.00 33.00 0.00 0.00 0.00 0.00 33.00
20.03 Type C - >2.65m Nos 0.00 0.00 0.00 9.00 0.00 9.00 0.00 0.00 0.00 0.00 9.00

21.00 IC for Manholes


21.01 B/W-RR 450mm diaX900mm ht. Nos 0.00 0.00 0.00 63.00 17.00 80.00 0.00 0.00 0.00 0.00 80.00

22.00 Extra for Rings

22.10 PC Rings
a Type A - 0 to 1.65m M 0.00 0.00 0.00 120.28 28.29 148.58 0.00 0.00 0.00 0.00 149.00
b Type B - 1.65 to 2.5m M 0.00 0.00 0.00 378.31 107.81 486.12 0.00 0.00 0.00 0.00 487.00
c Type C - >2.65m M 0.00 0.00 0.00 2610.15 740.91 3351.07 0.00 0.00 0.00 0.00 3352.00

22.20 RR Rings
a Type A - 0 to 1.65m M 0.00 0.00 0.00 38.46 26.63 65.09 0.00 0.00 0.00 0.00 66.00
b Type B - 1.65 to 2.5m M 0.00 0.00 0.00 18.26 7.64 25.90 0.00 0.00 0.00 0.00 26.00
c Type C - >2.65m M 0.00 0.00 0.00 13.55 0.00 13.55 0.00 0.00 0.00 0.00 14.00

23.00 Drop Manhole


23.01 200mm Dia Nos 0.00 0.00 0.00 337.00 86.00 423.00 0.00 0.00 0.00 0.00 423.00
23.02 250mm Dia Nos 0.00 0.00 0.00 38.00 19.00 57.00 0.00 0.00 0.00 0.00 57.00
23.03 300mm Dia Nos 0.00 0.00 0.00 14.00 1.00 15.00 0.00 0.00 0.00 0.00 15.00
23.04 350mm Dia Nos 0.00 0.00 0.00 5.00 9.00 14.00 0.00 0.00 0.00 0.00 14.00
23.05 400mm Dia Nos 0.00 0.00 0.00 5.00 0.00 5.00 0.00 0.00 0.00 0.00 5.00
23.06 450mm Dia Nos 0.00 0.00 0.00 13.00 0.00 13.00 0.00 0.00 0.00 0.00 13.00
23.07 500mm Dia Nos 0.00 0.00 0.00 3.00 0.00 3.00 0.00 0.00 0.00 0.00 3.00
23.08 550mm Dia Nos 0.00 0.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00 0.00 1.00
23.09 600mm Dia Nos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24.00 Extra for Additional Drop beyond 1m


24.01 200mm Dia Rmt 0.00 0.00 0.00 173.61 71.74 245.35 0.00 0.00 0.00 0.00 246.00
24.02 250mm Dia Rmt 0.00 0.00 0.00 88.67 37.25 125.92 0.00 0.00 0.00 0.00 126.00
24.03 300mm Dia Rmt 0.00 0.00 0.00 50.02 3.08 53.10 0.00 0.00 0.00 0.00 54.00
24.04 350mm Dia Rmt 0.00 0.00 0.00 13.59 0.78 14.37 0.00 0.00 0.00 0.00 15.00
24.05 400mm Dia Rmt 0.00 0.00 0.00 4.28 0.00 4.28 0.00 0.00 0.00 0.00 5.00
24.06 450mm Dia Rmt 0.00 0.00 0.00 6.28 0.00 6.28 0.00 0.00 0.00 0.00 7.00
24.07 500mm Dia Rmt 0.00 0.00 0.00 0.41 0.00 0.41 0.00 0.00 0.00 0.00 1.00
24.08 550mm Dia Rmt 0.00 0.00 0.00 0.07 0.00 0.07 0.00 0.00 0.00 0.00 1.00
24.09 600mm Dia Rmt 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SIP BOQ ABSTRACT OF QUANTITIES

Sewer Line MH IC
Sl.No. Item Unit Rising Main Total Qty Calculated Remarks
Jhalawar Patan Total Jhalawar Patan Total Jhalawar Patan Total
25.00 Road Restoration
25.01 GSB Cum 1088.76 268.00 1356.75 396.73 66.55 463.28 836.99 1286.11 2123.10 103.84 4047.00
25.02 WMM Cum 904.82 382.64 1287.45 462.50 96.50 559.00 826.89 1890.79 2717.68 103.84 4668.00
25.03 Tack Coat Sqm 65095.73 24335.17 89430.89 5057.04 1008.52 6065.56 5579.93 8574.05 14153.98 1038.44 110689.00
25.04 Primer Coat Sqm 5212.47 1786.64 6999.11 3382.23 669.11 4051.34 4360.82 8574.05 12934.86 1038.44 25024.00
25.05 SDBC Cum 432.29 522.06 954.34 51.59 10.20 61.79 83.50 192.96 276.46 41.54 1335.00
25.06 Bituminous Macadam Cum 145.35 66.48 211.83 90.64 17.40 108.04 152.26 325.45 477.71 83.08 881.00
25.07 Scarifying existing bituminous road surface Sqm 17253.59 5039.46 22293.06 0.00 0.00 0.00 0.00 0.00 0.00 1038.44 23332.00
25.08 Premix Carpet Sqm 15288.92 3290.06 18578.98 484.68 121.84 606.51 5579.93 2065.06 7644.99 1038.44 27869.00
25.09 PCC base for CC Road Cum 3884.45 1220.86 5105.31 741.54 215.67 957.22 2477.97 4935.83 7413.81 334.58 13811.00
25.10 CC Top for CC Road Cum 6180.86 5752.69 11933.55 632.98 243.74 876.73 2036.30 5298.61 7334.91 411.30 20557.00
25.11 Base for I/L Tiles Cum 221.11 35.74 256.84 41.99 4.67 46.65 83.59 64.55 148.14 0.00 452.00
25.12 CC Interlocking Tiles Sqm 2211.06 357.37 2568.43 535.82 59.43 595.25 838.51 717.50 1556.02 0.00 4720.00
25.13 Seal Coat Sqm 15288.92 3290.06 18578.98 484.68 121.84 606.51 5579.93 2065.06 7644.99 0.00 26831.00

26.00 Inspection Chambers


26.01 PC 450mm diaX600mm ht. Nos 0.00 0.00 0.00 0.00 0.00 0.00 8169.00 3690.00 11859.00 0.00 11859.00
26.02 PC 450mm diaX900mm ht. Nos 0.00 0.00 0.00 0.00 0.00 0.00 1166.00 645.00 1811.00 0.00 1811.00
26.03 RR 450mm diaX900mm ht. Nos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

27.00 PVC -u Pipe


27.01 PVC -u Pipe - 110mm Rmt 0.00 0.00 0.00 0.00 0.00 0.00 70719.59 32465.40 103184.99 0.00 103185.00
27.02 PVC -u Pipe - 160mm Rmt 1487.00 242.00 1729.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1729.00

28.00 Utility Pipe Rmt 4235.00

29.00 DI Pipe for Rising Main


29.01 150mm Dia Rmt 0.00 0.00
29.02 200mm Dia Rmt 4680.50 4681.00
29.03 300mm Dia Rmt 2805.00 2805.00

30.00 Air Valve


30.01 150mm Dia Rmt 0.00 0.00
30.02 200mm Dia Rmt 7.00 7.00
30.03 300mm Dia Rmt 3.00 3.00

31.00 Earth Bought from Outside


a For Filling in lines & manholes Cum 37322.95 0.00 37322.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37323.00
b For Land Filling Cum 399.00

32.00 Construction of subgrade and earthen shoulders Cum 399.00

Granular/Sand Filling for


33.00 Cum 2300.22 0.00 2300.22 113.59 0.00 113.59 0.00 0.00 0.00 0.00 2414.00
MH/Trench at NH/Ridcor lines

Earthwork for Rising Main Cum


34.00 Excavation in Soil
34.01 0m to 1.5m Cum 5706.38 5707.00
34.02 1.5m to 3.0m Cum 0.00 0.00

35.00 Excavation in Ordinary Rock


35.01 0m to 1.5m Cum 1115.97 1116.00
35.02 1.5m to 3.0m Cum 0.00 0.00
35.03 3.0m to 4.5m Cum

36.00 Excavation in Hard Rock


36.01 0m to 1.5m Cum 154.61 155.00
36.02 1.5m to 3.0m Cum 0.00 0.00

37.00 Connection MH/IC Each 0.00 0.00 0.00 11402.50 3332.50 14735.00 0.00 0.00 0.00 L267+I267+F267+M267
SIP-BoQ Jhalawar

Government of Rajasthan
Rajasthan Urban Infrastrucutre Development Project (RUSDIP Phase III)
IPIU Jhalawar
Name of work: Construction of Sewerage Network,SPS & Up-grading the Existing STP, allied works with O&M for entire system
for 10 yrs at Jhalawar & Jhlarapatan.
Package No.: RUSDP/Program/JHL/02
Name of Contractor: M/s PC Snehal Construction Pvt. Ltd.
Amount of Contract: Rs. 143,72,13,637/-
Date of Commencement : 26/08/2017
Stipulated date of complement: 11/02/2020

Abstract of Quantities - Jhalawar

Qty
Sr.No. Item Unit Sewer Remarks
MH IC Total
Line

1.0 DWC Pipe


1.1 200mm Dia Rmt 80104 0 0 80103.50
1.2 250mm Dia Rmt 1905 0 0 1905.18
1.3 300mm Dia Rmt 206 0 0 206.44

2.0 RCC Pipe


2.1 350mm Dia Rmt 467 0 0 467.12
2.2 400mm Dia Rmt 27 0 0 27.18
2.3 450mm Dia Rmt 540 0 0 539.90
2.4 500mm Dia Rmt 214 0 0 213.92
2.5 550mm Dia Rmt 0 0 0 0.00
2.6 600mm Dia Rmt 0 0 0 0.00

3.0 HDPE Pipe

3.1 HDPE Pipe for Depths upto 3.0m

3.1.1 In all kind of Soil


a 200mm Dia Rmt 66 66.00
b 250mm Dia Rmt 0 0.00
c 300mm Dia Rmt 0 0.00
d 350mm Dia Rmt 0 0.00
e 400mm Dia Rmt 0 0.00
f 450mm Dia Rmt 0 0.00
g 500mm Dia Rmt 180 180.00
h 550mm Dia Rmt 0 0.00
i 600mm Dia Rmt 0 0.00

3.1.2 In Soft Rock


a 200mm Dia Rmt 928 928.30
b 250mm Dia Rmt 1874 1874.00
c 300mm Dia Rmt 0 0.00
d 350mm Dia Rmt 118 118.00
e 400mm Dia Rmt 369 369.00
f 450mm Dia Rmt 56 56.00
g 500mm Dia Rmt 0 0.00
h 550mm Dia Rmt 0 0.00
i 600mm Dia Rmt 0 0.00

3.1.3 In Hard Rock


a 200mm Dia Rmt 3041 3041.00
b 250mm Dia Rmt 1962 1962.00
c 300mm Dia Rmt 2063 2063.00
SIP-BoQ Jhalawar

Qty
Sr.No. Item Unit Sewer Remarks
MH IC Total
Line
d 350mm Dia Rmt 781 781.00
e 400mm Dia Rmt 974 974.00
f 450mm Dia Rmt 1271 1271.00
g 500mm Dia Rmt 106 106.00
h 550mm Dia Rmt 0 0.00
i 600mm Dia Rmt 30 30.00

4.0 PVC -u Pipe


a PVC -u Pipe - 110mm Rmt 0 0 70720 70719.59
b PVC -u Pipe - 160mm Rmt 1487 0 0 1487.00

5.0 Precast Manholes


a Type A - 0 to 1.65m Nos 0 2548 0 2548.00
b Type B - 1.65 to 2.5m Nos 0 790 0 790.00
c Type C - >2.65m Nos 0 1034 0 1034.00

6.0 RR Manholes
a Type A - 0 to 1.65m Nos 0 101 0 101.00
b Type B - 1.65 to 2.5m Nos 0 16 0 16.00
c Type C - >2.65m Nos 0 9 0 9.00

7.0 IC for Manholes


a Type A - 0 to 1.65m Nos 0 63 0 63.00

8.0 Extra for Rings


8.1 PC Rings
a Type A - 0 to 1.65m M 0.00 120.28 0.00 120.28
b Type B - 1.65 to 2.5m M 0.00 378.31 0.00 378.31
c Type C - >2.65m M 0.00 2610.15 0.00 2610.15

8.2 RR Rings
a Type A - 0 to 1.65m M 0.00 38.46 0.00 38.46
b Type B - 1.65 to 2.5m M 0.00 18.26 0.00 18.26
Type C - 2.5 to 5.0m M 0.00 13.55 0.00 13.55
9.0 Inspection Chambers
a 450mm diaX600mm ht. Nos 0 0 8169 8169.00
b 450mm diaX900mm ht. Nos 0 0 1166 1166.00

10.0 Excavation in Soil


a 0m to 1.5m Cum 46754.43 7032.46 17608.96 71395.85
b 1.5m to 3.0m Cum 8294.81 1763.94 0.00 10058.75
c 3.0m to 4.5m Cum 1207.15 246.88 0.00 1454.03
d 4.5m to 6.0m Cum 153.48 28.86 0.00 182.34
e 6.0m to 7.5m Cum 0.00 0.00 0.00 0.00
f 7.5m to 9.0m Cum 0.00 0.00 0.00 0.00
g 9.0m to 10.5m Cum 0.00 0.00 0.00 0.00
h 10.5m to 12.0m Cum 0.00 0.00 0.00 0.00
i 12.0m to 13.5m Cum 0.00 0.00 0.00 0.00
j 13.5m to 15.0m Cum 0.00 0.00 0.00 0.00

11.0 Excavation in Ordinary Rock


a 0m to 1.5m Cum 25568.21 4219.60 12789.27 42577.08
b 1.5m to 3.0m Cum 8711.97 1825.77 0.00 10537.74
c 3.0m to 4.5m Cum 865.60 218.32 0.00 1083.92
SIP-BoQ Jhalawar

Qty
Sr.No. Item Unit Sewer Remarks
MH IC Total
Line
d 4.5m to 6.0m Cum 8.57 18.65 0.00 27.22
e 6.0m to 7.5m Cum 0.00 4.81 0.00 4.81
f 7.5m to 9.0m Cum 0.00 0.00 0.00 0.00
g 9.0m to 10.5m Cum 0.00 0.00 0.00 0.00
h 10.5m to 12.0m Cum 0.00 0.00 0.00 0.00
i 12.0m to 13.5m Cum 0.00 0.00 0.00 0.00
j 13.5m to 15.0m Cum 0.00 0.00 0.00 0.00

12.0 Excavation in Hard Rock


a 0m to 1.5m Cum 1712.85 201.95 113.92 2028.72
b 1.5m to 3.0m Cum 5442.90 1082.84 0.00 6525.73
c 3.0m to 4.5m Cum 1689.38 452.29 0.00 2141.67
d 4.5m to 6.0m Cum 198.96 48.00 0.00 246.96
e 6.0m to 7.5m Cum 24.45 2.26 0.00 26.72
f 7.5m to 9.0m Cum 0.00 4.96 0.00 4.96
g 9.0m to 10.5m Cum 0.00 0.00 0.00 0.00
h 10.5m to 12.0m Cum 0.00 0.00 0.00 0.00
i 12.0m to 13.5m Cum 0.00 0.00 0.00 0.00
j 13.5m to 15.0m Cum 0.00 0.00 0.00 0.00

13.0 Road Cutting


a Interlocking Tiles Sqm 1971.91 485.72 880.95 3338.58
b WBM Cum 6912.33 1472.42 3382.64 11767.40
c BT Cum 768.98 288.63 685.59 1743.20
d CC Cum 9348.81 1644.74 5085.42 16078.98

14.0 Bedding
a GRB-110mm dia Rmt 0.00 0.00 70719.59 70719.59
b GRB-200mm dia Rmt 79002.41 0.00 0.00 79002.41
c GRB-250mm dia Rmt 1877.88 0.00 0.00 1877.88
d GRB-300mm dia Rmt 204.04 0.00 0.00 204.04
e GRB-350mm dia Rmt 461.42 0.00 0.00 461.42
f GRB-400mm dia Rmt 26.58 0.00 0.00 26.58
g GRB-450mm dia Rmt 533.90 0.00 0.00 533.90
h GRB-500mm dia Rmt 211.22 0.00 0.00 211.22
i GRB-550mm dia Rmt 0.00 0.00 0.00 0.00
j GRB-600mm dia Rmt 0.00 0.00 0.00 0.00

15.0 Barricading
a MS Pipe Rmt 49678.42 44818.22 0.00 94496.64
b GI Sheet Sqm 2476.94 7765.54 0.00 10242.49
c PVC Tape Rmt 40649.03 924.32 0.00 41573.35

16.0 Extra for Excavation in Saturated Soil


a 0 to 1.5m Cum
b 1.5m to 3.0m Cum
c 3.0m to 4.5m Cum
d 4.5m to 6.0m Cum
e 6.0m to 7.5m Cum
f 7.5m to 9.0m Cum
g 9.0m to 10.5m Cum
h 10.5m to 12.0m Cum
i 12.0m to 13.5m Cum
SIP-BoQ Jhalawar

Qty
Sr.No. Item Unit Sewer Remarks
MH IC Total
Line
j 13.5m to 15.0m Cum

16.0 Carriage of Material (Lead 0km to 1.0km)


a Gravel Cum 212.55 25.39 61.88 299.81
b Earth Cum 3450.01 985.63 0.00 4435.64
c Rock Cum 4250.91 507.79 1237.59 5996.29

17.0 Carriage of Material (Lead 1km to 2.0km)


a Gravel Cum 198.17 44.66 116.71 359.55
b Earth Cum 15370.44 2651.38 1579.28 19601.09
c Rock Cum 3963.45 893.28 2334.23 7190.96

18.0 Carriage of Material (Lead 2km to 3.0km)


a Gravel Cum 273.69 50.53 150.74 474.96
b Earth Cum 15984.86 3040.13 0.00 19024.99
c Rock Cum 5473.83 1010.63 3014.74 9499.20

19.0 Carriage of Material (Lead 3km to 4.0km)


a Gravel Cum 0.00 0.96 0.00 0.96
b Earth Cum 700.18 0.00 0.00 700.18
c Rock Cum 0.00 19.25 0.00 19.25

20.0 Carriage of Material (Lead 4km to 5.0km)


a Gravel Cum 0.00 0.00 0.00 0.00
b Earth Cum 2497.79 175.53 0.00 2673.32
c Rock Cum 0.00 0.00 0.00 0.00

21.0 Carriage of Material (Lead 5km to 6.0km)


a Gravel Cum 6.08 0.91 5.70 12.69
b Earth Cum 479.82 49.14 0.00 528.96
c Rock Cum 121.57 18.24 114.09 253.89

22.0 Road Restoration


a PCC base for CC Road Cum 3884.45 741.54 2477.97 7103.97
b CC Top for CC Road Cum 6180.86 632.98 2036.30 8850.15
c Base for I/L Tiles Cum 221.11 41.99 83.59 346.68
d CC Interlocking Tiles Sqm 2211.06 535.82 838.51 3585.39
e GSB Cum 1088.76 396.73 836.99 2322.48
f WMM Cum 904.82 462.50 826.89 2194.21
g Tack Coat Sqm 65095.73 5057.04 5579.93 75732.70
h Primer Coat Sqm 5212.47 3382.23 4360.82 12955.52
i Bituminous Macadam Cum 145.35 90.64 152.26 388.25
j SDBC Cum 432.29 51.59 83.50 567.38
k Premix Carpet Sqm 15288.92 484.68 5579.93 21353.53
l Seal Coat Sqm 15288.92 484.68 5579.93 21353.53
m Scarifying existing bituminous road surface Sqm 17253.59 0.00 0.00 17253.59

22.0 Timbering
22.1 Open Timbering
a 1.5m to 3.0m Sqm 0.00 0.00 0.00 0.00
b 3.0m to 6.0m Sqm 0.00 0.00 0.00 0.00
c More than 6.0m Sqm 0.00 0.00 0.00 0.00
22.2 Close Timbering
SIP-BoQ Jhalawar

Qty
Sr.No. Item Unit Sewer Remarks
MH IC Total
Line
a 1.5m to 3.0m Sqm 0.00 0.00 0.00 0.00
b 3.0m to 6.0m Sqm 0.00 0.00 0.00 0.00
c More than 6.0m Sqm 0.00 0.00 0.00 0.00

23.0 Driven Tip


a In all type of Soil Rmt 0.00 84.72 0.00 84.72
b In Rock Rmt 0.00 1194.05 0.00 1194.05

24.0 Drop Manhole


200mm Dia Nos 0.00 337.00 0.00 337.00
250mm Dia Nos 0.00 38.00 0.00 38.00
300mm Dia Nos 0.00 14.00 0.00 14.00
350mm Dia Nos 0.00 5.00 0.00 5.00
400mm Dia Nos 0.00 5.00 0.00 5.00
450mm Dia Nos 0.00 13.00 0.00 13.00
500mm Dia Nos 0.00 3.00 0.00 3.00
550mm Dia Nos 0.00 1.00 0.00 1.00
600mm Dia Nos 0.00 0.00 0.00 0.00

25.0 Extra for Additional Drop beyond 1m


200mm Dia 0.00 0.00 173.61 0.00 173.61
250mm Dia 0.00 0.00 88.67 0.00 88.67
300mm Dia 0.00 0.00 50.02 0.00 50.02
350mm Dia 0.00 0.00 13.59 0.00 13.59
400mm Dia 0.00 0.00 4.28 0.00 4.28
450mm Dia 0.00 0.00 6.28 0.00 6.28
500mm Dia 0.00 0.00 0.41 0.00 0.41
550mm Dia 0.00 0.00 0.07 0.00 0.07
600mm Dia 0.00 0.00 0.00 0.00 0.00

26.0 Earth Bought from Outside Cum 37322.95 0.00 0.00 37322.95

27.0 Dust/GRB/Sand Filling for MH/Trench Cum 2300.22 113.59 0.00 2413.81
SIP BoQ Jhalarapatan

Government of Rajasthan
Rajasthan Urban Infrastrucutre Development Project (RUSDIP Phase III)
IPIU Jhalawar
Name of work: Construction of Sewerage Network,SPS & Up-grading the Existing STP, allied works with O&M for entire system for 10 yrs at Jhalawar & Jhlarapatan.
Package No.: RUSDP/Program/JHL/02
Name of Contractor: M/s PC Snehal Construction Pvt. Ltd.
Amount of Contract: Rs. 143,72,13,637/-
Date of Commencement : 26/08/2017
Stipulated date of complement: 11/02/2020

Abstract of Quantities - Jhalarapatan

Qty
Sr.No. Item Unit Remarks
Sewer Line MH IC Total

1.0 DWC Pipe


1.1 200mm Dia Rmt 22912.39 0.00 0.00 22912.39
1.2 250mm Dia Rmt 1142.13 0.00 0.00 1142.13
1.3 300mm Dia Rmt 0.00 0.00 0.00 0.00

2.0 RCC Pipe


2.1 200mm Dia Rmt 0.00 0.00 0.00 0.00
2.2 250mm Dia Rmt 0.00 0.00 0.00 0.00
2.3 350mm Dia Rmt 557.42 0.00 0.00 557.42
2.4 400mm Dia Rmt 0.00 0.00 0.00 0.00
2.5 450mm Dia Rmt 0.00 0.00 0.00 0.00
2.6 500mm Dia Rmt 0.00 0.00 0.00 0.00
2.7 550mm Dia Rmt 0.00 0.00 0.00 0.00
2.8 600mm Dia Rmt 0.00 0.00 0.00 0.00

3.0 HDPE Pipe

3.1 HDPE Pipe for Depths

3.1.1 In all kind of Soil


a 200mm Dia Rmt 191.00 0.00 0.00 191.00
b 250mm Dia Rmt 148.00 0.00 0.00 148.00
c 300mm Dia Rmt 0.00 0.00 0.00 0.00
d 350mm Dia Rmt 0.00 0.00 0.00 0.00
e 400mm Dia Rmt 0.00 0.00 0.00 0.00
f 450mm Dia Rmt 0.00 0.00 0.00 0.00
g 500mm Dia Rmt 0.00 0.00 0.00 0.00
h 550mm Dia Rmt 0.00 0.00 0.00 0.00
i 600mm Dia Rmt 0.00 0.00 0.00 0.00

3.1.2 In Soft Rock


a 200mm Dia Rmt 273.00 0.00 0.00 273.00
b 250mm Dia Rmt 779.00 0.00 0.00 779.00
c 300mm Dia Rmt 30.00 0.00 0.00 30.00
d 350mm Dia Rmt 0.00 0.00 0.00 0.00
e 400mm Dia Rmt 0.00 0.00 0.00 0.00
f 450mm Dia Rmt 0.00 0.00 0.00 0.00
g 500mm Dia Rmt 0.00 0.00 0.00 0.00
h 550mm Dia Rmt 0.00 0.00 0.00 0.00
i 600mm Dia Rmt 0.00 0.00 0.00 0.00

3.1.3 In Hard Rock


a 200mm Dia Rmt 1030.00 0.00 0.00 1030.00
b 250mm Dia Rmt 571.00 0.00 0.00 571.00
c 300mm Dia Rmt 0.00 0.00 0.00 0.00
d 350mm Dia Rmt 116.00 0.00 0.00 116.00
e 400mm Dia Rmt 0.00 0.00 0.00 0.00
f 450mm Dia Rmt 0.00 0.00 0.00 0.00
g 500mm Dia Rmt 0.00 0.00 0.00 0.00
h 550mm Dia Rmt 0.00 0.00 0.00 0.00
i 600mm Dia Rmt 0.00 0.00 0.00 0.00

4.0 PVC -u Pipe


a PVC -u Pipe - 110mm Rmt 0.00 0.00 32465.40 32465.40
b PVC -u Pipe - 160mm Rmt 242.00 0.00 0.00 242.00

5.0 Precast Manholes


a Type A - 0 to 1.65m Nos 0.00 729.00 0.00 729.00
b Type B - 1.65 to 2.5m Nos 0.00 196.00 0.00 196.00
c Type C - >2.65m Nos 0.00 287.00 0.00 287.00
SIP BoQ Jhalarapatan

Qty
Sr.No. Item Unit Remarks
Sewer Line MH IC Total
6.0 RR Manholes
a Type A - 0 to 1.65m Nos 0.00 87.00 0.00 87.00
b Type B - 1.65 to 2.5m Nos 0.00 17.00 0.00 17.00

7.0 IC for Manholes


a Type A - 0 to 1.65m Nos 0.00 17.00 0.00 17.00

8.0 Extra for Rings


8.1 Precast Rings
a Type A - 0 to 1.65m M 0.00 28.29 0.00 28.29
b Type B - 1.65 to 2.5m M 0.00 107.81 0.00 107.81
c Type C - >2.65m M 0.00 740.91 0.00 740.91

8.2 RR Rings
a Type A - 0 to 1.65m M 0.00 26.63 0.00 26.63
b Type B - 1.65 to 2.5m M 0.00 7.64 0.00 7.64
Type C - >2.65m M 0.00 0.00 0.00 0.00

9.0 Inspection Chambers


a 450mm diaX600mm ht. Nos 0.00 0.00 3690.00 3690.00
b 450mm diaX900mm ht. Nos 0.00 0.00 645.00 645.00

10.0 Excavation in Soil


a 0m to 1.5m Cum 9575.81 1612.76 6245.84 17434.41
b 1.5m to 3.0m Cum 955.04 236.48 0.00 1191.52
c 3.0m to 4.5m Cum 68.07 12.27 0.00 80.34
d 4.5m to 6.0m Cum 0.00 1.41 0.00 1.41
e 6.0m to 7.5m Cum 0.00 0.00 0.00 0.00
f 7.5m to 9.0m Cum 0.00 0.00 0.00 0.00
g 9.0m to 10.5m Cum 0.00 0.00 0.00 0.00
h 10.5m to 12.0m Cum 0.00 0.00 0.00 0.00
i 12.0m to 13.5m Cum 0.00 0.00 0.00 0.00
j 13.5m to 15.0m Cum 0.00 0.00 0.00 0.00

11.0 Excavation in Ordinary Rock


a 0m to 1.5m Cum 9486.16 1561.78 8225.49 19273.44
b 1.5m to 3.0m Cum 3595.83 624.93 0.00 4220.76
c 3.0m to 4.5m Cum 396.85 61.89 0.00 458.74
d 4.5m to 6.0m Cum 51.94 12.71 0.00 64.64
e 6.0m to 7.5m Cum 0.00 6.85 0.00 6.85
f 7.5m to 9.0m Cum 0.00 0.00 0.00 0.00
g 9.0m to 10.5m Cum 0.00 0.00 0.00 0.00
h 10.5m to 12.0m Cum 0.00 0.00 0.00 0.00
i 12.0m to 13.5m Cum 0.00 0.00 0.00 0.00
j 13.5m to 15.0m Cum 0.00 0.00 0.00 0.00

12.0 Excavation in Hard Rock


a 0m to 1.5m Cum 2653.58 403.79 865.15 3922.53
b 1.5m to 3.0m Cum 3231.71 676.14 0.00 3907.85
c 3.0m to 4.5m Cum 1535.76 364.10 0.00 1899.86
d 4.5m to 6.0m Cum 553.80 148.69 0.00 702.49
e 6.0m to 7.5m Cum 147.53 54.20 0.00 201.73
f 7.5m to 9.0m Cum 9.90 10.84 0.00 20.74
g 9.0m to 10.5m Cum 0.00 0.00 0.00 0.00
h 10.5m to 12.0m Cum 0.00 0.00 0.00 0.00
i 12.0m to 13.5m Cum 0.00 0.00 0.00 0.00
j 13.5m to 15.0m Cum 0.00 0.00 0.00 0.00

13.0 Road Cutting


a Interlocking Tiles Sqm 357.37 59.43 272.06 688.87
b WBM Cum 2164.99 418.87 1677.97 4261.84
c BT Cum 351.89 82.59 343.44 777.92
d CC Cum 2952.59 524.41 2691.32 6168.32

14.0 Bedding
a GRB-110mm dia Rmt 0.00 0.00 32465.40 32465.40
b GRB-200mm dia Rmt 22598.29 0.00 0.00 22598.29
c GRB-250mm dia Rmt 1126.53 0.00 0.00 1126.53
d GRB-300mm dia Rmt 0.00 0.00 0.00 0.00
e GRB-350mm dia Rmt 550.22 0.00 0.00 550.22
f GRB-400mm dia Rmt 0.00 0.00 0.00 0.00
SIP BoQ Jhalarapatan

Qty
Sr.No. Item Unit Remarks
Sewer Line MH IC Total
g GRB-450mm dia Rmt 0.00 0.00 0.00 0.00
h GRB-500mm dia Rmt 0.00 0.00 0.00 0.00
i GRB-550mm dia Rmt 0.00 0.00 0.00 0.00
j GRB-600mm dia Rmt 0.00 0.00 0.00 0.00

15.0 Barricading
a MS Pipe Rmt 15242.93 12492.08 0.00 27735.01
b GI Sheet Sqm 2977.42 2199.60 0.00 5177.02
c PVC Tape Rmt 11042.28 743.86 0.00 11786.14

16.0 Carriage of Material (Lead 0km to 1.0km)


a Gravel Cum 94.59 17.15 91.65 203.39
b Earth Cum 114.98 503.64 0.00 618.63
c Rock Cum 1891.89 343.00 1832.95 4067.83

17.0 Carriage of Material (Lead 1km to 2.0km)


a Gravel Cum 102.60 12.77 79.72 195.10
b Earth Cum 9635.57 1123.17 0.00 10758.74
c Rock Cum 2052.05 255.46 1594.41 3901.92

18.0 Carriage of Material (Lead 2km to 3.0km)


a Gravel Cum 0.00 19.22 0.00 19.22
b Earth Cum 686.19 1084.09 0.00 1770.27
c Rock Cum 0.00 384.41 0.00 384.41

19.0 Carriage of Material (Lead 3km to 4.0km)


a Gravel Cum 0.00 0.00 0.00 0.00
b Earth Cum 4257.78 410.93 0.00 4668.72
c Rock Cum 0.00 0.00 0.00 0.00

20.0 Carriage of Material (Lead 4km to 5.0km)


a Gravel Cum 0.00 0.00 0.00 0.00
b Earth Cum 4732.60 443.10 0.00 5175.70
c Rock Cum 0.00 0.00 0.00 0.00

21.0 Carriage of Material (Lead 5km to 6.0km)


a Gravel Cum 0.00 0.00 0.00 0.00
b Earth Cum 587.55 68.10 0.00 655.65
c Rock Cum 0.00 0.00 0.00 0.00

22.0 Road Restoration


a PCC base for CC Road Cum 1220.86 215.67 4935.83 6372.36
b CC Top for CC Road Cum 5752.69 243.74 5298.61 11295.04
c Base for I/L Tiles Cum 35.74 4.67 64.55 104.95
d CC Interlocking Tiles Sqm 357.37 59.43 717.50 1134.31
e GSB Cum 268.00 66.55 1286.11 1620.65
f WMM Cum 382.64 96.50 1890.79 2369.92
g Tack Coat Sqm 24335.17 1008.52 8574.05 33917.74
h Primer Coat Sqm 1786.64 669.11 8574.05 11029.79
i Bituminous Macadam Cum 66.48 17.40 325.45 409.33
j SDBC Cum 522.06 10.20 192.96 725.21
k Premix Carpet Sqm 3290.06 121.84 2065.06 5476.96
l Seal Coat Sqm 3290.06 121.84 2065.06 5476.96
m Scarifying existing bituminous road surface Sqm 5039.46 0.00 0.00 5039.46

22.0 Timbering
22.1 Open Timbering
a 1.5m to 3.0m Sqm 0.00 0.00 0.00 0.00
b 3.0m to 6.0m Sqm 0.00 0.00 0.00 0.00
c More than 6.0m Sqm 0.00 0.00 0.00 0.00
22.2 Close Timbering
a 1.5m to 3.0m Sqm 0.00 0.00 0.00 0.00
b 3.0m to 6.0m Sqm 0.00 0.00 0.00 0.00
c More than 6.0m Sqm 0.00 0.00 0.00 0.00

23.0 Driven Tip


a In all type of Soil Rmt 0.00 0.40 0.00 0.40
b In Rock Rmt 0.00 293.99 0.00 293.99

24.0 Drop Manhole


200mm Dia Nos 0.00 86.00 0.00 86.00
250mm Dia Nos 0.00 19.00 0.00 19.00
300mm Dia Nos 0.00 1.00 0.00 1.00
SIP BoQ Jhalarapatan

Qty
Sr.No. Item Unit Remarks
Sewer Line MH IC Total
350mm Dia Nos 0.00 9.00 0.00 9.00
400mm Dia Nos 0.00 0.00 0.00 0.00
450mm Dia Nos 0.00 0.00 0.00 0.00
500mm Dia Nos 0.00 0.00 0.00 0.00
550mm Dia Nos 0.00 0.00 0.00 0.00
600mm Dia Nos 0.00 0.00 0.00 0.00

25.0 Extra for Additional Drop beyond 1m


200mm Dia 0.00 0.00 71.74 0.00 71.74
250mm Dia 0.00 0.00 37.25 0.00 37.25
300mm Dia Rmt 0.00 3.08 0.00 3.08
350mm Dia Rmt 0.00 0.78 0.00 0.78
400mm Dia Rmt 0.00 0.00 0.00 0.00
450mm Dia Rmt 0.00 0.00 0.00 0.00
500mm Dia Rmt 0.00 0.00 0.00 0.00
550mm Dia Rmt 0.00 0.00 0.00 0.00
600mm Dia Rmt 0.00 0.00 0.00 0.00

26.0 Earth Bought from Outside Cum 19616.30 0.00 0.00 19616.30

27.0 Dust/GRB/Sand Filling for MH/Trench Cum 0.00 0.00 0.00 0.00
Abstract of SPT Test in JHL & JHP
Borehole Locations All Kind Ordinary/S Hard Rock
No. of Soil oft Rock
1 Near Mama Bhanja Circle, Jhalawar 0.40 2.10 2.50
2 Lady Anusuiya Singhaniya Education Centre, Jhalawar 3.00 0.00 4.50
3 Near Rathore Taily Hostel, Khandia Colony, Jhalawar (SPS) 1.80 0.00 2.00
4 Near Gagron Flyover, Bank of Kali Sindh, Pratap Nagar 8.00 0.00 1.75
5 Dhanwadia Talab (SPS) 1.50 0.00 2.00
6 Teja ji temple, Jhalrapatan 1.20 0.00 0.80
7 STP Girdharpura-Ist 1.00 0.00 1.80
8 STP Girdharpura-IInd 0.60 1.90 1.75
9 STP Girdharpura-IIIrd 0.50 0.50 2.00
10 Pashupati nath temple jhalrapatan jhalawar 0.50 0.00 2.50
11 Divya jyoti residency jhalrapatan 1.00 0.00 3.00
12 Chandragupt nagar Opp. Agarwal suppliers 1.00 1.50 1.50
13 in front of khandiya chopati 2.00 5.00 0.00
14 STP Gagron jhalawar 2.50 1.50 0.00
15 Roop nagar jhalawar 2.50 0.00 1.00
16 krishi vigan kendra jhalawar 1.60 0.90 2.00
17 Dwarika hotel 2.00 2.80 0.00
18 Infront of HDFC Bank jhalawar 2.50 2.00 0.00
19 Gaurdi village jhalawar 7.50 4.50 0.00
20 Before railway bridge near hero showroom 3.30 0.00 0.00
21 Gindor village near Railway flyover 0.00 1.50 1.50
22 Gindor village infront Hero electronic 0.00 4.50 3.50
23 Police Station Tiraha patan 0.00 2.00 0.00
24 Bus stand 0.00 1.50 0.00
25 Balaji temple 0.00 2.00 0.00
26 Surya temple 0.00 3.50 0.00
27 Roop nagar inner side 0.00 2.00 0.00
28 Motor gairaj 0.00 2.50 0.00
29 income tax office 0.00 1.50 4.50
30 Panchmukhi balaji temple 0.00 1.50 1.00
31 Yes bank 0.00 1.50 3.00
32 Balji ki Chatri Labour chowk 0.00 1.50 1.50
33 Dhanwara 0.00 7.00 0.00
34 Police line 0.00 3.50 0.00
35 PHED office 0.00 1.50 2.00
Total 44.40 60.20 46.10
Abstract of SPT Test in JHL & JHP
Borehole Locations All Kind Ordinary/ Hard
No. of Soil Soft Rock Rock

1 Near Mama Bhanja Circle, Jhalawar 0.50 2.00 2.50


2 Lady Anusuiya Singhaniya Education Centre, Jhalawar 3.00 1.50 3.00
3 Near Rathore Taily Hostel, Khandia Colony, Jhalawar (SPS)
1.50 0.30 2.00
4 Near Gagron Flyover, Bank of Kali Sindh, Pratap Nagar 7.00 1.00 1.75
5 Dhanwadia Talab (SPS) 1.50 Nil 2.00
6 Teja ji temple, Jhalrapatan 1.20 Nil 0.80
7 STP Girdharpura-Ist 1.00 Nil 1.80
8 STP Girdharpura-IInd 1.00 Nil 1.75
9 STP Girdharpura-IIIrd 1.00 Nil 2.00
10 Pashupati nath temple jhalrapatan jhalawar 0.50 0.50 2.00
11 Divya jyoti residency jhalrapatan 1.00 Nil 3.00
12 Chandragupt nagar Opp. Agarwal suppliers 1.00 1.50 1.50
13 in front of khandiya chopati 1.50 5.50 Nil
14 STP Gagron jhalawar 1.50 2.50 Nil
15 Roop nagar jhalawar 3.00 0.50 Nil
16 krishi vigan kendra jhalawar 1.50 2.50 0.50
17 Dwarika hotel 1.50 2.93 0.37
18 Infront of HDFC Bank jhalawar 1.50 1.70 1.30
19 Gaurdi village jhalawar 12.00 Nil Nil
20 Before railway bridge near hero showroom 3.00 Nil Nil
21 Gindor village near Railway flyover Nil 1.50 1.50
22 Gindor village infront Hero electronic Nil 6.00 2.00
23 Police Station Tiraha patan Nil 2.00 Nil
24 Bus stand Nil 1.50 Nil
25 Balaji temple Nil 2.00 Nil
26 Surya temple 1.50 2.00 Nil
27 Roop nagar inner side 2.00 Nil Nil
28 Motor gairaj 2.50 Nil Nil
29 income tax office 1.00 3.50 1.50
30 Panchmukhi balaji temple 0.50 0.50 1.00
31 Yes bank 1.50 2.24 0.77
32 Balji ki Chatri Labour chowk 0.50 1.00 1.50
33 Dhanwara 0.50 3.50 3.00
34 Police line 0.50 1.00 1.50
35 PHED office 0.50 1.00 1.50
Total 56.70 50.17 40.54
Add @ 10% 5.67 5.02 4.05
Total 62.37 55.18 44.59
SIP BoQ Jhalawar (Rising Main Details)

Government of Rajasthan
Rajasthan Urban Infrastrucutre Development
Project (RUSDIP Phase III)
IPIU Jhalawar

Name of work: Construction of Sewerage Network,SPS & Up-grading the Existing STP, allied works
with O&M for entire system for 10 yrs at Jhalawar & Jhlarapatan.

Package No.: RUSDP/Program/JHL/02


Name of Contractor: M/s PC Snehal
Construction Pvt. Ltd.
Amount of Contract: Rs. 143,72,13,637/-
Date of Commencement : 26/08/2017
Stipulated date of complement: 11/02/2020

Rising Main Pipe Length & Accessories

Scour Bends
Location Air Valve Length Dia.
Valve 11.25 22.55 45 90
SPS-1 3 2 2805 300 37 22 5 4
SPS-2 3 0 1411 200 37 19 6 3
SPS-3 0 0 231 200 4 1 1 0
SPS-4 3 3 1975 200 22 5 3 2
SPS-5 1 2 1050 200 25 8 0 1
TOTAL 10 7 7472 125 55 15 10

Scour
Dia. DI Pipe Air Valve Valve
Rmt Nos Nos
150mm Dia 0 0 0
200mm Dia 4667 7 5
300mm Dia 2805 3 2

Total 7472 10 7

JHL JHP Total


Dia. DI Pipe
Rmt
150mm Dia 0 0 0
200mm Dia 1642 3025 4667
300mm Dia 2805 0 2805

Total 4447 3025 7472


Government of Rajasthan
Rajasthan Urban Infrastrucutre Development Project (RUSDIP Phase III)
IPIU Jhalawar
Name of work: Construction of Sewerage Network,SPS & Up-grading the
Existing STP, allied works with O&M for entire system for 10 yrs at Jhalawar
& Jhlarapatan.
Package No.: RUSDP/Program/JHL/02
Name of Contractor: M/s PC Snehal Construction Pvt. Ltd.
Amount of Contract: Rs. 143,72,13,637/-
Date of Commencement : 26/08/2017
Stipulated date of complement: 11/02/2020

Boundary Wall for SPS

Boundary Wall Length


S.No. Location
(m)

1 SPS1 90
2 SPS2 70
3 SPS3 54
4 SPS4 54
5 SPS5 54
6 3MLD STP 1003
Total 1325
Extra 133
Total 1458
Government of Rajasthan
Rajasthan Urban Infrastrucutre Development Project (RUSDIP Phase III)
IPIU Jhalawar
Name of work: Construction of Sewerage Network,SPS & Up-grading the Existing STP, allied works with O&M for entire system for 10 yrs at Jhalawar & Jhlarapatan.
Package No.: RUSDP/Program/JHL/02
Name of Contractor: M/s PC Snehal Construction Pvt. Ltd.
Amount of Contract: Rs. 143,72,13,637/-
Date of Commencement : 26/08/2017
Stipulated date of complement: 11/02/2020

For Constructing Subgrade/Katcha Road & Earthfilling for Dhanwara loop 2

Depth RL of
Invert Earth Excavation Width Dia. Of Dia of TYPES OF Backfilling Condition
MANHOLE NO. Distance Chainage G.L Slope I.L Depth Cover Depth (m) Pipe After Manhole Manhole ROAD (Cum) Of Road
Backfill Top
SN-4 MH-197 310.311 306.951 3.360 3.143 3.476 1.033 200 3.360 1500 310.311
SN-4 MH-199 19.000 19.000 308.318 100 306.761 1.557 1.340 1.673 0.733 200 1.557 1000 308.318
SN-4 MH-200 26.000 45.000 307.354 280 305.506 1.848 1.631 1.964 0.883 200 1.848 1200 307.354
SN-4 MH-201 30.000 75.000 306.244 200 305.356 0.888 0.671 1.004 0.733 200 1.100 1000 306.456 -0.088 -10.56 KC
SN-4 MH-202 30.000 105.000 305.666 200 305.206 0.460 0.243 0.576 0.733 200 1.100 1000 306.306 0.390 46.80 KC
SN-4 MH-203 30.000 135.000 305.336 200 305.056 0.280 0.063 0.396 0.733 200 1.100 1000 306.156 0.570 68.40 KC
SN-4 MH-204 30.000 165.000 305.156 200 304.906 0.250 0.033 0.366 0.733 200 1.100 1000 306.006 0.600 72.00 KC
SN-4 MH-205 30.000 195.000 305.161 200 304.756 0.405 0.188 0.521 0.733 200 1.100 1000 305.856 0.445 53.40 KC
SN-4 MH-206 30.000 225.000 305.316 200 304.606 0.710 0.493 0.826 0.733 200 1.100 1000 305.706 0.140 16.80 KC
SN-4 MH-207 30.000 255.000 305.026 200 304.456 0.570 0.353 0.686 0.733 200 1.100 1000 305.556 0.280 33.60 KC
SN-4 MH-208 30.000 285.000 304.723 200 304.306 0.417 0.200 0.533 0.733 200 1.100 1000 305.406 0.433 51.96 KC
SN-4 MH-211 24.000 309.000 305.211 200 304.186 1.025 0.808 1.141 0.733 200 1.025 1000 305.211 0.000
Qty 332.4
20% for unforeseen 66.48
Total Qty 399
Government of Rajasthan
Rajasthan Urban Infrastrucutre Development Project (RUSDIP Phase III)
IPIU Jhalawar
Name of work: Construction of Sewerage Network,SPS & Up-grading the Existing
STP, allied works with O&M for entire system for 10 yrs at Jhalawar & Jhlarapatan.
Package No.: RUSDP/Program/JHL/02
Name of Contractor: M/s PC Snehal Construction Pvt. Ltd.
Amount of Contract: Rs. 143,72,13,637/-
Date of Commencement : 26/08/2017
Stipulated date of complement: 11/02/2020

Sl.No. Head Amount

Bank Guarantee for Laying Sewer Line at Jhalawar


1 NH-52 (NHAI) 998,950.00

License Fees for Laying Sewer Line at Mega


2 6,007,257.00
Highway Jhalawar (RIDCOR)

3 Bank Guarantee for Laying Sewer Line at Mega 3,522,300.00


Highway Jhalawar (RIDCOR)

4 License Fees for Laying Sewer Line at Mega 1,411,733.00


Highway Jhalarapatan (RIDCOR)

5 Bank Guarantee for Laying Sewer Line at Mega 772,300.00


Highway Jhalarapatan (RIDCOR)

6 License Fees for Laying Sewer Line at Railway Land 470,738.00


(West Central Railway)
7 Amount for Social Activities 1,000,000.00
10 Expenses towards TPI/Misc 5,000,000.00

Total 19,183,278.00
10% of Total 1,918,327.80
Net Amount 21,101,605.80

Say 21,200,000.00
IPIU Jhalawar

Name of work: Construction of Sewerage Network,SPS & Up-grading the Existing


STP, allied works with O&M for entire system for 10 yrs at Jhalawar & Jhlarapatan.

Package No.: RUSDP/Program/JHL/02


Name of Contractor: M/s PC Snehal Construction
Pvt. Ltd.
Amount of Contract: Rs. 143,72,13,637/-
Date of Commencement : 26/08/2017
Stipulated date of complement: 11/02/2020

Pro-rata Hard Rock Calculation (Blasting prohibited - For 0 to 1.5 m depth


s

Rock Qty
Total Lines Laid Qty Executed Total Lines Rock Qty to be
Executedpe
upto RA18 upto RA18 to be laid Executed-Probable
r metre
(m) (Cum) (m) (Cum)
pipe

45267.43 4375.80 123709.00 0.10 11958.39


Say (in Cum) 11958.00
Earth available by Excavation of Structures

SPS1 SPS2 SPS3 SPS4 SPS5 3MLD TSS

Total Excavation A 1328 649 803 833 422 580


Soil in Excavation B 531.2 129.8 240.9 583.1 42.2 58
Rock in Excavation C 796.8 519.2 562.1 249.9 379.8 522
Backfilling Required D 442 159 222 292 120 100.2
Balance Soil D-B 89.2 -29.2 18.9 291.1 -77.8 -42.2
3MLD
Total
Wetwell
249 4864
24.9 1610.1
224.1 3253.9
64 1399.2
-39.1 210.9
37323.00
37112.1