Professional Documents
Culture Documents
SOURCE
TEST CABLE
NO STESEN PMU/PPU/SS TEST FROM
DATE ID
U
PMU
PE RUMAH PAM
1 06-Jan-20 TNBD BANGI BERANANG B12971
LION IND PARK
CB11
PPU
PE PEKAN
5 07-Jan-20 BANGI DENGKIL CB B 03840
DENGKIL
2
PPU ECO
PE TOL ECO
9 08-Jan-20 BANGI MAJESTIC B 14316
MAJESTIC
CB 14
PPU ECO
PE TOL ECO
10 08-Jan-20 BANGI MAJESTIC B 14315
MAJESTIC
CB 14
PMU ABBA
12 09-Jan-20 BANGI PE PLUS BANGI B 10741
CB 2
PPU
SAUJANA PE SAUJANA
13 09-Jan-20 BANGI B 10741
IMPIAN CB IMPIAN NO4
5
PMU
SSU LION IND
14 10-Feb-20 TNBD BANGI BERANANG B16313
PARK NO8
CB4
PMU
PMU SEMENYIH
15 10-Feb-20 TNBD BANGI SEMENYIH
CB3
CB3
PPU BNDR
16 10-Feb-20 TNBD BANGI PE TMN MAJU B03085
TECH CB8
PRESTASI PD MAPPING
PMU BERANANG
11KV XLPE 240 3C 1488m IN SERVICE
CB11
PE BDR RINCHING
11KV XLPE 240 3C 3463m IN SERVICE
NO6
PE CHARLES
11KV XLPE 240 3C 360m IN SERVICE
CANDY
PE BANDAR BARU
11KV MIXED 240+300 3c 341m In Service
DENGKIL
PE REKO WEST
11KV XLPE 240 3c 214m In Service
TOL PLAZA
PE REKO WEST
11KV XLPE 240 3c 214m In Service
TOL PLAZA
PPU KAJANG
11KV XLPE 500 1c 863m In Service
TOWN
PE TAMAN TASIK
11KV XLPE 240 1c 4679m In Service
KESUMA FASA 7B2
PE RUMAH KEDAI
11KV XLPE 240 3c 2511m In Service
IVORIS 1
PE PORIM BANGI
11KV MIXED 240+300 3c 4649m In Service
LAMA
PE TAMAN
11KV XLPE 240 3c 2719m In Service
SENTOSA IMPIAN
PE SAUJANA
11KV MIXED 240+300 3c 515m In Service
IMPIAN NO3I
PMU BERANANG
11KV XLPE 240 3C 1712m IN SERVICE
CB4
PE DYNAMIC
11KV XLPE 240 3C 3020m IN SERVICE
MOULD
(RED) IR Test (PI @ DAR) (YELLOW) IR Test (PI @ DAR) (BLUE) IR Test (PI @ DA
DAR : 1.00
DAR : 1.00
DAR : 1.14
DAR : 1.06
DAR : 1.01
DAR : 1.00
DAR : 1.01
DAR : 1.01
DAR : 1.00
DAR : 1.02
DAR : 1.00
DAR : 0.96
DAR : 1.01
DAR : 1.06
DAR : 1.02
DAR : 1.01
DAR : 1.01
DAR : 0.98
DAR : 1.01
DAR : 1.02
DAR : 1.05
DAR : 1.04
DAR : 1.02
DAR : 0.95
DAR : 1.02
DAR : 1.01
DAR : 1.01
DAR : 1.04
DAR : 1.01
DAR : 1.11
DAR : 1.38
DAR : 1.17
(BLUE) IR Test (PI @ DAR) LOCATION 1
(BLUE) IR
(BLUE) (LOC 1)
Test (PI (LOC 1) (LOC 1) (LOC 1)
IR Test (LOC 1) (LOC 1) Critical
@ DAR)- Location( Me Uo
(PI @ PD Types PDIV PDEV Factor,
60 sec @ ter ), X
DAR) K
1 min
6.35 0.000
(LOC 1) (LOC 1)
(LOC 1) (LOC 1)
(LOC 1) (LOC 1) N Nt
Qa m
(LOC 1) Severity
Qm Dischar
Density (LOC 2)
(Max ge (Num of (Total Factor,
(Average Factor, Location, X
Discharge, discharg num of D S=(A.D)/
Discharg A
pC) e@ discharg K
e, pC)
L±10m) e)
(LOC 2) (LOC 2)
(LOC 2)
(LOC 2) Qm Qa
(LOC 2) (LOC 2) Dischar
(LOC 2) (LOC 2) Critical
Uo ge
PD Types PDIV PDEV Factor, (Max (Average Factor,
K Discharg Discharg A
e, pC) e, pC)
(LOC 2) (LOC 2)
Nm Nt (LOC 2)
(LOC 2) Severity
Density (LOC 3) (LOC 3) (LOC 3) (LOC 3)
(Num of (Total Factor, Location, X PD Types Uo PDIV
discharg num of D S=(A.D)/
e@ discharg K
L±10m) e)
1 1 1.00 3.216
1 1 1.00 1.231
#DIV/0! #DIV/0! 6.35
(LOC 3) (LOC 3)
(LOC 3) (LOC 3) (LOC 3)
(LOC 3) N Nt
(LOC 3) Qm Qa m
(LOC 3) Severity
Dischar
(LOC 3) Critical Density
ge (Num of (Total Factor,
PDEV Factor, (Max (Average Factor,
K discharg num of D S=(A.D)/
Discharg Discharg A e@ discharg K
e, pC) e, pC)
L±10m) e)
(LOC 4) (LOC 4)
(LOC 4) Qm Qa
(LOC 4) (LOC 4) (LOC 4) (LOC 4) (LOC 4) Critical
Location, X PD Types Uo PDIV PDEV Factor, (Max (Average
K Discharg Discharg
e, pC) e, pC)
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
6.35 0.000
(LOC 4) (LOC 4)
N Nt (LOC 4)
(LOC 4) m
(LOC 4) Severity
Dischar KATEGORI
Density RECOMMENDATION 1
ge (Num of (Total Factor, ANALISA
( DISTEANCE -METER)
Factor, discharg num of KABEL
D S=(A.D)/
A e@ discharg K
L±10m) e)
RECOMMENDATIO
RECOMMENDATION 1 N 2 ( DISTEANCE -
METER )
Sistem
Minggu Bulan Tarikh Tracking
Juruteknik Perlaksa PIDAR Severrity
(PD Di (PD Siap Days Sub Zon
Terlibat naan PD STATUS Index
Buat) Dibuat) Analisis Analisis
Map
TCI B 2 JAN
TCI B 0.000
TCI B 0.000
TCI B 1.548
TCI B 1.839
TCI B 0.000
TCI B 0.000
5.471 2.661