You are on page 1of 77

Back Fill Ghulam HussainCompany(Pvt).

Ltd Line dia 9 inches

Details of Measurements & calculation of Quantities of the Back Fill for 9" dia pipe
Back fill for Trench
street A-2
Dimensions in feets

Line Ist MH 2nd MH Avg


S.No Location From-To dia No Length Width Height Height Height Quantity Units Remarks
1 st A-2 MH Old-MH 1 9 1 135 4 2.46 2.46 2.46 1328.4 cft
2 st A-2 MH 1-MH 2 9 1 37 4 2.46 2.38 2.42 358.16 cft
3 st A-2 MH 2-MH 3 9 1 31 4 2.38 2.29 2.335 289.54 cft

H
vg
4 st A-2 MH 3-MH 4 9 1 105 4 2.29 2.21 2.25 945 cft

*A
W
5 st A-2 MH 4-MH 5 9 1 93 4 2.21 2.13 2.17 807.24 cft

L*
*
No
6 st A-2 MH 5-MH 6 9 1 95 4 2.13 1.88 2.005 761.9 cft

y=
Total 4490.24 cft

Qt
street A-5
1 st A-5 MH N1-MH N2 9 1 48 4 2.79 2.79 2.79 535.68 cft
2 st A-5 MH N2-MH A4 9 1 36 4 2.79 3.38 3.085 444.24 cft

H
vg
3 st A-5 MH A4-MH 1 9 1 102 4 3.38 3.13 3.255 1328.04 cft

*A
W
4 st A-5 MH 1-MH 2 9 1 92 4 3.13 3.13 3.13 1151.84 cft

L*
*
No
5 st A-5 MH 2-MH 3 9 1 94 4 3.13 2.63 2.88 1082.88 cft

y=
Total 4542.68 cft

Qt
street A-6
1 stA-6 MHOld-MH1 9 1 53 4 3.04 3.04 3.04 644.48 cft

H
vg
2 stA-6 MH 1-MH 2 9 1 96 4 3.04 2.88 2.96 1136.64 cft

*A
*W
3 stA-6 MH 2-MH 3 9 1 94 4 2.88 2.96 2.92 1097.92 cft

L
o*
4 stA-6 MH 3-MH 4 9 1 92 4 2.96 2.54 2.75 1012 cft

N
y=
Total 3891.04 cft

Qt
street B1& B2
1 stB1& B2 MHOld-MH1 9 1 97 4 2.71 2.71 2.71 1051.48 cft
2 stB1& B2 MH 1-MH 2 9 1 89 4 2.71 2.88 2.795 995.02 cft

H
3 stB1& B2 MH 2-MH 3 9 1 99 4 2.88 3.21 3.045 1205.82 cft

vg
*A
4 stB1& B2 MH 3-MH 4 9 1 94 4 3.21 3.04 3.125 1175 cft

W
L*
5 stB1& B2 MH 4-MH 5 9 1 94.5 4 3.04 2.88 2.96 1118.88 cft

*
No
y=
Qt
Page 1 of 77
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

6 stB1& B2 MH 5-MH 6 9 1 93 4 2.88 2.63 2.755 1024.86 cft


7 stB1& B2 MH 6-MH 7 9 1 94 4 2.63 2.46 2.545 956.92 cft
Total 7527.98 cft
street C-7
1 stC-7 MHC9-6-MH1 9 1 33 4 2.96 2.96 2.96 390.72 cft
2 stC-7 MH 1-MH 2 9 1 87 4 2.96 2.21 2.585 899.58 cft
3 stC-7 MH 2-MH 3 9 1 90 4 2.21 2.21 2.21 795.6 cft

H
vg
4 stC-7 MH 3-MH 4 9 1 94 4 2.21 2.46 2.335 877.96 cft

*A
W
5 stC-7 MH 4-MH 5 9 1 94 4 2.46 2.46 2.46 924.96 cft

L**
No
6 stC-7 MH 5-MH 6 9 1 95 4 2.46 2.21 2.335 887.3 cft

y=
Total 4776.12 cft

Qt
street C-8
1 st C-8 MH C9-2-MH 1 9 1 66 4 1.96 2.96 2.46 649.44 cft
2 st C-8 MH 1-MH 2 9 1 94 4 2.96 2.88 2.92 1097.92 cft
3 st C-8 MH 2-MH 3 9 1 89 4 2.88 2.63 2.755 980.78 cft

H
4 st C-8 MH 3-MH 4 9 1 94 4 2.63 3.46 3.045 1144.92 cft

vg
*A
5 st C-8 MH 4-MH 5 9 1 92 4 3.46 2.88 3.17 1166.56 cft

W
L*
6 st C-8 MH 5-MH 6 9 1 95 4 2.88 2.79 2.835 1077.3 cft

*
No
7 st C-8 MH 6-MH 7 9 1 94 4 2.79 2.96 2.875 1081 cft

y=
Qt
8 st C-8 MH 7-MH 8 9 1 32 4 2.96 3.21 3.085 394.88 cft
9 st C-8 MH 8-MH 9 9 1 53.5 4 2.21 3.46 2.835 606.69 cft
Total 8199.49 cft
street C-9
1 st C-9 MH MR-MH 1 9 1 101 4 1.96 1.96 1.96 791.84 cft
2 st C-9 MH 1-MH 2 9 1 90 4 1.96 1.96 1.96 705.6 cft

H
3 st C-9 MH 2-MH 3 9 1 56 4 1.96 1.96 1.96 439.04 cft

vg
*A
4 st C-9 MH 3-MH 4 9 1 44 4 1.96 1.96 1.96 344.96 cft

*W
L
5 st C-9 MH 4-MH 5 9 1 49 4 1.96 1.96 1.96 384.16 cft

N o*
6 st C-9 MH 5-MH 6 9 1 48 4 1.96 2.96 2.46 472.32 cft

y=
Qt
7 st C-9 MH 6-MH 7 9 1 100.5 4 2.96 1.96 2.46 988.92 cft
Total 4126.84 cft
street C-6
1 st C-6 MH Old-MH 1 9 1 37 4 2.17 321.16 cft

H
Page 2 of 77

vg
*A
W
L*
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

2 st C-6 MH 1-MH 2 9 1 33 4 2.17 286.44 cft


3 st C-6 MH 2-MH 3 9 1 96 4 2.67 1025.28 cft
4 st C-6 MH 3-MH 4 9 1 91 4 2.67 971.88 cft
5 st C-6 MH 4-MH 5 9 1 33 4 2.67 352.44 cft
6 st C-6 MH 5-MH 6 9 1 27 4 2.67 288.36 cft
7 st C-6 MH 6-MH 7 9 1 36 4 2.67 384.48 cft
Total 3630.04 cft
Sub Total 41184.43 cft
Back fill for Manhole
street A-2
Dimensions in feets Dimensions in feets
Line
Manhole identification dia(i MH
S.No Location No nch) No Length Width Height Quantity Dia MH radius MH vol Back fill Units Remarks
1 st A-2 MH 1 9 1 8 8 6.25 400 5.5 2.75 148.414 251.5859 cft
2 st A-2 MH 2 9 1 8 8 6.17 394.88 5.5 2.75 146.514 248.3656 cft

v=3.14*r^2*h
3 st A-2 MH 3 9 1 8 8 6.08 389.12 5.5 2.75 144.377 244.7428 cft
4 st A-2 MH 4 9 1 8 8 6 384 5.5 2.75 142.478 241.5225 cft
5 st A-2 MH 5 9 1 8 8 5.92 378.88 5.5 2.75 140.578 238.3022 cft
6 st A-2 MH 6 9 1 8 8 5.67 362.88 5.5 2.75 134.641 228.2388 cft
Total 1452.76 cft
street A-5
1 st A-5 MH New1 9 1 8 8 6.58 421.12 5.5 2.75 156.25 264.8697 cft
2 st A-5 MH New2 9 1 8 8 6.58 421.12 5.5 2.75 156.25 264.8697 cft

v=3.14*r^2*h
3 st A-5 MH A4 9 1 8 8 7.17 458.88 5.5 2.75 170.261 288.6194 cft
4 st A-5 MH 1 9 1 8 8 6.92 442.88 5.5 2.75 164.324 278.556 cft
5 st A-5 MH 2 9 1 8 8 6.92 442.88 5.5 2.75 164.324 278.556 cft
6 st A-5 MH 3 9 1 8 8 6.42 410.88 5.5 2.75 152.451 258.4291 cft
Total 1633.9 cft
street A-6
1 stA-6 MH 1 9 1 8 8 6.83 437.12 5.5 2.75 162.187 274.9331 cft

v=3.14*r^2*h
2 stA-6 MH 2 9 1 8 8 6.67 426.88 5.5 2.75 158.387 268.4925 cft
3 stA-6 MH 3 9 1 8 8 6.75 432 5.5 2.75 160.287 271.7128 cft

Page 3 of 77
v=3.14*r^2*h
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

4 stA-6 MH 4 9 1 8 8 6.33 405.12 5.5 2.75 150.314 254.8062 cft


Total 1069.94 cft
street B1&B2
1 stB1& B2 MH 1 9 1 8 8 6.5 416 5.5 2.75 154.351 261.6494 cft
2 stB1& B2 MH 2 9 1 8 8 6.67 426.88 5.5 2.75 158.387 268.4925 cft

v=3.14*r^2*h
3 stB1& B2 MH 3 9 1 8 8 7 448 5.5 2.75 166.224 281.7763 cft
4 stB1& B2 MH 4 9 1 8 8 6.83 437.12 5.5 2.75 162.187 274.9331 cft
5 stB1& B2 MH 5 9 1 8 8 6.67 426.88 5.5 2.75 158.387 268.4925 cft
6 stB1& B2 MH 6 9 1 8 8 6.42 410.88 5.5 2.75 152.451 258.4291 cft
7 stB1& B2 MH 7 9 1 8 8 6.25 400 5.5 2.75 148.414 251.5859 cft
Total 1865.36 cft
street C-7
1 stC-7 MH 1 9 1 8 8 6.75 432 5.5 2.75 160.287 271.7128 cft
2 stC-7 MH 2 9 1 8 8 6 384 5.5 2.75 142.478 241.5225 cft

v=3.14*r^2*h
3 stC-7 MH 3 9 1 8 8 6 384 5.5 2.75 142.478 241.5225 cft
4 stC-7 MH 4 9 1 8 8 6.25 400 5.5 2.75 148.414 251.5859 cft
5 stC-7 MH 5 9 1 8 8 6.25 400 5.5 2.75 148.414 251.5859 cft
6 stC-7 MH 6 9 1 8 8 6 384 5.5 2.75 142.478 241.5225 cft
Total 1499.45 cft
street C-8
1 st C-8 MH 1 9 1 8 8 6.75 432 5.5 2.75 160.287 271.7128 cft
2 st C-8 MH 2 9 1 8 8 6.67 426.88 5.5 2.75 158.387 268.4925 cft
3 st C-8 MH 3 9 1 8 8 6.42 410.88 5.5 2.75 152.451 258.4291 cft

v=3.14*r^2*h
4 st C-8 MH 4 9 1 8 8 7.25 464 5.5 2.75 172.16 291.8397 cft
5 st C-8 MH 5 9 1 8 8 6.67 426.88 5.5 2.75 158.387 268.4925 cft
6 st C-8 MH 6 9 1 8 8 6.58 421.12 5.5 2.75 156.25 264.8697 cft
7 st C-8 MH 7 9 1 8 8 6.75 432 5.5 2.75 160.287 271.7128 cft
8 st C-8 MH 8 9 1 8 8 7 448 5.5 2.75 166.224 281.7763 cft
9 st C-8 MH 9 9 1 8 8 7.25 464 5.5 2.75 172.16 291.8397 cft
Total 2469.17 cft
street C-9
1 st C-9 MH MR 9 1 8 8 5.75 368 5.5 2.75 136.541 231.4591 cft
2 st C-9 MH 1 9 1 8 8 5.75 368 5.5 2.75 136.541 231.4591 cft

3.14*r^2*h
Page 4 of 77
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

3 st C-9 MH 2 9 1 8 8 5.75 368 5.5 2.75 136.541 231.4591 cft

v=3.14*r^2*h
4 st C-9 MH 3 9 1 8 8 5.75 368 5.5 2.75 136.541 231.4591 cft
5 st C-9 MH 4 9 1 8 8 5.75 368 5.5 2.75 136.541 231.4591 cft
6 st C-9 MH 5 9 1 8 8 5.75 368 5.5 2.75 136.541 231.4591 cft
7 st C-9 MH 6 9 1 8 8 6.75 432 5.5 2.75 160.287 271.7128 cft
8 st C-9 MH 6 9 1 8 8 5.75 368 5.5 2.75 136.541 231.4591 cft
Total 1891.93 cft
street C-6
1 st C-6 MH 1 9 1 8 8 4.5 288 5.5 2.75 106.858 181.1419 cft
2 st C-6 MH 2 9 1 8 8 4.5 288 5.5 2.75 106.858 181.1419 cft
3 st C-6 MH 3 9 1 8 8 5 320 5.5 2.75 118.731 201.2688 cft

v=3.14*r^2*h
4 st C-6 MH 4 9 1 8 8 5 320 5.5 2.75 118.731 201.2688 cft
5 st C-6 MH 5 9 1 8 8 5 320 5.5 2.75 118.731 201.2688 cft
6 st C-6 MH 6 9 1 8 8 5 320 5.5 2.75 118.731 201.2688 cft
7 st C-6 MH 7 9 1 8 8 5 320 5.5 2.75 118.731 201.2688 cft
Total 1368.63 cft
Sub Total 13251 cft
Backfill for HDP 6" Dia
street A-2
Dimensions in feets
Manhole identification Line Pipe Pipe
S.No Location No dia No Length Width Height Quantity Area Volume Backfill Units Remarks
1 st A-2 MH 1 6 2 3 4 4 96 0.1963 0.589 95.4113 cft

Backfill=Qty-Pipe vol
2 st A-2 MH 2 6 2 3 4 3.92 94.08 0.1963 0.589 93.4913 cft
3 st A-2 MH 3 6 2 3 4 3.83 91.92 0.1963 0.589 91.3313 cft
4 st A-2 MH 4 6 2 3 4 3.75 90 0.1963 0.589 89.4113 cft
5 st A-2 MH 5 6 2 3 4 3.67 88.08 0.1963 0.589 87.4913 cft
6 st A-2 MH 6 6 2 3 4 3.42 82.08 0.1963 0.589 81.4913 cft
Total 538.63 cft
street A-5
1 st A-5 MH New1 6 2 3 4 4.33 103.92 0.1963 0.589 103.331 cft

ackfill=Qty-Pipe vol
2 st A-5 MH New2 6 2 3 4 4.33 103.92 0.1963 0.589 103.331 cft

Page 5 of 77
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

Backfill=Qty-Pipe vol
3 st A-5 MH A4 6 2 3 4 4.92 118.08 0.1963 0.589 117.491 cft
4 st A-5 MH 1 6 2 3 4 4.67 112.08 0.1963 0.589 111.491 cft
5 st A-5 MH 2 6 2 3 4 4.67 112.08 0.1963 0.589 111.491 cft
6 st A-5 MH 3 6 2 3 4 4.17 100.08 0.1963 0.589 99.4913 cft
Total 646.63 cft
street A-6
1 stA-6 MH 1 6 2 3 4 4.58 109.92 0.1963 0.589 109.331 cft

Backfill=Qty-Pipe vol
2 stA-6 MH 2 6 2 3 4 4.42 106.08 0.1963 0.589 105.491 cft
3 stA-6 MH 3 6 2 3 4 4.5 108 0.1963 0.589 107.411 cft
4 stA-6 MH 4 6 2 3 4 4.08 97.92 0.1963 0.589 97.3313 cft
Total 419.57 cft
street B1&B2
1 stB1& B2 MH 1 6 2 3 4 4.25 102 0.1963 0.589 101.411 cft

Backfill=Qty-Pipe vol
2 stB1& B2 MH 2 6 2 3 4 4.42 106.08 0.1963 0.589 105.491 cft
3 stB1& B2 MH 3 6 2 3 4 4.75 114 0.1963 0.589 113.411 cft
4 stB1& B2 MH 4 6 2 3 4 4.58 109.92 0.1963 0.589 109.331 cft
5 stB1& B2 MH 5 6 2 3 4 4.42 106.08 0.1963 0.589 105.491 cft
6 stB1& B2 MH 6 6 2 3 4 4.17 100.08 0.1963 0.589 99.4913 cft
7 stB1& B2 MH 7 6 2 3 4 4 96 0.1963 0.589 95.4113 cft
Total 730.04 cft
street C-7
1 stC-7 MH C9-6 6 2 3 4 4.5 108 0.1963 0.589 107.411 cft

Backfill=Qty-Pipe vol
2 stC-7 MH 1 6 2 3 4 4.5 108 0.1963 0.589 107.411 cft
3 stC-7 MH 2 6 2 3 4 3.75 90 0.1963 0.589 89.4113 cft
4 stC-7 MH 3 6 2 3 4 3.75 90 0.1963 0.589 89.4113 cft
5 stC-7 MH 4 6 2 3 4 4 96 0.1963 0.589 95.4113 cft
6 stC-7 MH 5 6 2 3 4 4 96 0.1963 0.589 95.4113 cft
7 stC-7 MH 6 6 2 3 4 3.75 90 0.1963 0.589 89.4113 cft
Total 673.88 cft
street C-8
1 st C-8 MH 1 6 2 3 4 4.5 108 0.1963 0.589 107.411 cft
2 st C-8 MH 2 6 2 3 4 4.42 106.08 0.1963 0.589 105.491 cft

kfill=Qty-Pipe vol
3 st C-8 MH 3 6 2 3 4 4.17 100.08 0.1963 0.589 99.4913 cft

Page 6 of 77
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

Backfill=Qty-Pipe vol
4 st C-8 MH 4 6 2 3 4 5 120 0.1963 0.589 119.411 cft
5 st C-8 MH 5 6 2 3 4 4.42 106.08 0.1963 0.589 105.491 cft
6 st C-8 MH 6 6 2 3 4 4.33 103.92 0.1963 0.589 103.331 cft
7 st C-8 MH 7 6 2 3 4 4.5 108 0.1963 0.589 107.411 cft
8 st C-8 MH 8 6 2 3 4 4.75 114 0.1963 0.589 113.411 cft
9 st C-8 MH 9 6 2 3 4 5 120 0.1963 0.589 119.411 cft
Total 980.86 cft
street C-9
1 st C-9 MH MR 6 2 3 4 3.5 84 0.1963 0.58875 83.4113 cft
2 st C-9 MH 1 6 2 3 4 3.5 84 0.1963 0.58875 83.4113 cft
3 st C-9 MH 2 6 2 3 4 3.5 84 0.1963 0.58875 83.4113 cft

Backfill=Qty-Pipe vol
4 st C-9 MH 3 6 2 3 4 3.5 84 0.1963 0.58875 83.4113 cft
5 st C-9 MH 4 6 2 3 4 3.5 84 0.1963 0.58875 83.4113 cft
6 st C-9 MH 5 6 2 3 4 3.5 84 0.1963 0.58875 83.4113 cft
7 st C-9 MH 6 6 2 3 4 4.5 108 0.1963 0.58875 107.411 cft
8 st C-9 MH 7 6 2 3 4 3.5 84 0.1963 0.58875 83.4113 cft
Total 691.29 cft
Sub Total 4681 cft
Total Back fill For 9" dia pipe 59116 cft

Details of Measurements & Calculation of Quantities for Earth Backfill


Earth Backfill for Trench
Road-15
ation Cushio Crushe Back
Line Heigh n d Stone fill
S.No Location From-To dia LengthWidth t Height Height Height Quantity Units Remarks
1 Road-15 MH 1-MH 2 9 47.5 4 4.16 1.583 0.83 1.747 331.93 cft

Backfill Ht=E Ht-SC Ht-CS Ht


Qty=L*W*H
2 Road-15 MH 2-MH 3 9 47.5 4 3.58 1.583 0.83 1.167 221.73 cft
3 Road-15 MH 3-MH 4 9 52.5 4 4.75 1.583 0.83 2.337 490.77 cft
4 Road-15 MH 4-MH 5 9 52.5 4 5 1.583 0.83 2.587 543.27 cft
5 Road-15 MH 5-MH 6 9 52.5 4 4.16 1.583 0.83 1.747 366.87 cft
6 Road-15 MH 6-MH 7 9 53.5 4 4 1.583 0.83 1.587 339.618 cft
7 Road-15 MH 7-MH 8 9 96.5 4 5 1.583 0.83 2.587 998.582 cft

Page 7 of 77
Qty
Backfill Ht=E Ht-S
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

8 Road-15 MH 8-MH-MR 9 109 4 3.66 1.583 0.83 1.247 541.198 cft


Total 3833.968 cft
Street E-1
1 St E-1 MH 1-MH 2 9 96 4 4.16 1.583 0.83 1.747 670.848 cft

Backfill Ht=E Ht-SC Ht-


2 St E-1 MH 2-MH 3 9 97 4 4.16 1.583 0.83 1.747 677.836 cft

Qty=L*W*H
3 St E-1 MH 3-MH 4 9 96.5 4 5.16 1.583 0.83 2.747 1060.342 cft
4 St E-1 MH 4-MH 5 9 96.3 4 5 1.583 0.83 2.587 995.995 cft

CS Ht
5 St E-1 MH 5-MH 6 9 95.5 4 4.75 1.583 0.83 2.337 892.734 cft
Total 4297.755 cft
Street E-2

Backfill Ht=E Ht-SC Ht-


1 St E-2 MH 3-MH 4 9 96.5 4 5.08 1.583 0.83 2.667 1029.462 cft

Qty=L*W*H
2 St E-2 MH 4-MH 5 9 96.5 4 4.16 1.583 0.83 1.747 674.342 cft
3 St E-2 MH 5-MH 6 9 97.5 4 4 1.583 0.83 1.587 618.93 cft
4 St E-2 MH 6-MH 7 9 96.5 4 3.75 1.583 0.83 1.337 516.082 cft

CS Ht
Total 2838.816 cft
Street A-4
1 St A-4 MH 1-MH 2 9 79 3 5.25 1.583 0.83 2.837 672.369 cft

Backfill Ht=E Ht-SC


2 St A-4 MH 2-MH 3 9 80 3 5 1.583 0.83 2.587 620.88 cft

Qty=L*W*H
3 St A-4 MH 3-MH 4 9 79 3 5 1.583 0.83 2.587 613.119 cft
4 St A-4 MH 4-MH 5 9 88 3 4.375 1.583 0.83 1.962 517.968 cft

Ht-CS Ht
5 St A-4 MH 5-MH A7.1 9 97 3 4.375 1.583 0.83 1.962 570.942 cft
Total 2995.278 cft
Street A-7
1 St A-7 MH 3-MH 4 9 87 3 5.207 1.583 0.83 2.794 729.234 cft

Backfill Ht=E Ht-SC Ht-CS Ht


Qty=L*W*H
2 St A-7 MH 4-MH 5 9 87 3 5.122 1.583 0.83 2.709 707.049 cft
3 St A-7 MH 5-MH 6 9 88 3 4.872 1.583 0.83 2.459 649.176 cft
4 St A-7 MH 6-MH 7 9 88 3 4.917 1.583 0.83 2.504 661.056 cft
5 St A-7 MH 7-MH 8 9 87 3 4.75 1.583 0.83 2.337 609.957 cft
6 St A-7 MH 8-MH 9 9 87 3 4.585 1.583 0.83 2.172 566.892 cft
7 St A-7 MH 9-MH 10 9 96.5 3 5.252 1.583 0.83 2.839 821.8905 cft
8 St A-7 MH 10-MH A7.2 9 48 3 6.002 1.583 0.83 3.589 516.816 cft
Total 5262.0705 cft
Street C-10

Page 8 of 77
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

1 St C-10 CB3-MH 1 9 112 3 3.122 1.583 0.83 0.709 238.224 cft

Backfill Ht=E Ht-SC Ht-CS Ht


Qty=L*W*H
2 St C-10 MH 1-MH 2 9 100 3 4.08 1.583 0.83 1.667 500.1 cft
3 St C-10 MH 2-MH 3 9 54.5 3 4.542 1.583 0.83 2.129 348.0915 cft
4 St C-10 MH 3-MH 4 9 55 3 5.042 1.583 0.83 2.629 433.785 cft
5 St C-10 MH 4-MH 5 9 51 3 4.792 1.583 0.83 2.379 363.987 cft
6 St C-10 MH 5-CB3.1 9 47 3 3.917 1.583 0.83 1.504 212.064 cft
Total 2096.2515 cft
Main Boulevard C sector
1 RD MH 7-MH 6 15 97 4 4 1.75 1.16 1.09 422.92 cft
2 MH 6-MH 5 15 96 4 5 1.75 1.16 2.09 802.56 cft
3 MH 5-MH 4 15 97 4 5 1.75 1.16 2.09 810.92 cft
4 MH 4-MH 3 15 97.8 4 5 1.75 1.16 2.09 817.19 cft
5 MH 3-MH 2 15 102 4 5 1.75 1.16 2.09 852.72 cft

Backfill Ht=E Ht-SC Ht-CS Ht


6 MH 2-MH 1 15 100 4 5 1.75 1.16 2.09 836 cft

Qty=L*W*H
7 MH 1-CB5 15 151 4 5 1.75 1.16 2.09 1262.36 cft
8 CB5-MH 1 15 95 4 4.5 1.75 1.16 1.59 604.2 cft
9 MH 1-CB4 15 125 4 4.083 1.75 1.16 1.173 586.5 cft
10 CB4-MH 1 15 98 4 3.583 1.75 1.16 0.673 263.816 cft
11 MH 1-CB3 15 123 4 4 1.75 1.16 1.09 536.28 cft
12 CB3-MH 2 18 92 4 4 2 1.25 0.75 276 cft
13 MH 2-MH 1 18 94 4 5.083 2 1.25 1.833 689.208 cft
14 MH 1-CB2 18 129 4 3.42 2 1.25 0.17 87.72 cft
Total 8848.394 cft
Main Boulevard Near B1

Backfill Ht=E Ht-SC Ht-


1 RD MH B1-MH 1 12 106 3 5 1.66 1 2.34 744.12 cft

Qty=L*W*H
2 MH 1-MH 2 12 107 3 4 1.66 1 1.34 430.14 cft
3 MH 2-MH 3 12 85 3 3.66 1.66 1 1 255 cft
4 MH 3-B2(Shahid) 12 132 3 4.5 1.66 1 1.84 728.64 cft

CS Ht
Total 2157.9 cft
Main Boulevard
1 RD MHOld- MH(shahid) 18 137 4 5 2 1.25 1.75 959 cft

Backfill Ht=E Ht-SC Ht-


2 MH CA-MH 1 18 143 4 4.16 2 1.25 0.91 518.7 cft

Qty=L*W*H
3 MH 1-MH 3 18 144 4 4.16 2 1.25 0.91 524.16 cft

CS Ht
Page 9 of 77
Backfill Ht=E Ht-SC Ht-
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

Qty=L*W*H
4 MH 3-MH 4 18 120 4 4.16 2 1.25 0.91 436.8 cft

CS Ht
5 MH4-MHCA1(shahid) 18 56 4 5.16 2 1.25 1.91 427.84 cft
Total 2866.5 cft
ROAD CROSSES Trench Earth Backfill
Street A-4

Backfill Ht=E Ht-SC Ht-


1 St A-4 MH 1 Cross 6 24.5 3 4.5 1.5 0.75 2.25 165.375 cft
2 St A-4 MH 2 Cross 6 24.5 3 4.5 1.5 0.75 2.25 165.375 cft

Qty=L*W*H
3 St A-4 MH 3 Cross 6 24.3 3 4.5 1.5 0.75 2.25 163.688 cft
4 St A-4 MH 4 Cross 6 24.8 3 4.5 1.5 0.75 2.25 167.063 cft
5 St A-4 MH 5 Cross 6 25 3 4.5 1.5 0.75 2.25 168.750 cft

CS Ht
6 St A-4 MH A-7.1 Cross 6 24.3 3 4.5 1.5 0.75 2.25 163.688 cft
Total 993.938 cft
Street A-5
1 St A-5 MH A-4 Cross 9 32 3 5.25 1.583 0.75 2.917 280.032 cft
2 St A-5 MH 1 Cross 9 25 3 5 1.583 0.75 2.667 200.025 cft same as
3 St A-5 MH 2 Cross 9 25 3 5 1.583 0.75 2.667 200.025 cft above
Total 680.082 cft
Street A-7
1 St A-7 MH 3 Cross 6 31 3 4.5 1.5 0.75 2.25 209.250 cft
2 St A-7 MH 4 Cross 6 25.9 3 4.5 1.5 0.75 2.25 174.960 cft

Backfill Ht=E Ht-SC Ht-CS Ht


Qty=L*W*H
3 St A-7 MH 5 Cross 6 24.8 3 4.5 1.5 0.75 2.25 167.063 cft
4 St A-7 MH 6 Cross 6 24.8 3 4.5 1.5 0.75 2.25 167.063 cft
5 St A-7 MH 7 Cross 6 24.8 3 4.5 1.5 0.75 2.25 167.063 cft
6 St A-7 MH 8 Cross 6 24.3 3 4.5 1.5 0.75 2.25 163.688 cft
7 St A-7 MH 9 Cross 6 25 3 4.5 1.5 0.75 2.25 168.750 cft
8 St A-7 MH 10 Cross 6 25 3 4.5 1.5 0.75 2.25 168.750 cft
9 St A-7 MH A7.2 Cross 6 24.8 3 4.5 1.5 0.75 2.25 167.603 cft
Total 1554.188 cft
Street C-8
1 St C-8 MH 1 Cross 9 40 3 4.83 1.583 0.75 2.497 299.64 cft

Backfill Ht=E Ht-SC Ht-CS Ht


2 St C-8 MH 2 Cross 9 26 3 4.75 1.583 0.75 2.417 188.526 cft

Qty=L*W*H
3 St C-8 MH 3 Cross 9 25 3 4.5 1.583 0.75 2.167 162.525 cft
4 St C-8 MH 4 Cross 9 25 3 5.33 1.583 0.75 2.997 224.775 cft

Page 10 of 77
Backfill Ht=E Ht-SC Ht-CS Ht
Qty=L*W*H
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

5 St C-8 MH 5 Cross 9 25 3 4.75 1.583 0.75 2.417 181.275 cft


6 St C-8 MH 6 Cross 9 25 3 4.66 1.583 0.75 2.327 174.525 cft
7 St C-8 MH 7 Cross 9 26 3 4.83 1.583 0.75 2.497 194.766 cft
Total 1426.032 cft
Street B1& B2
1 St B1& B2 MH 1 Cross 9 25 3 4.5 1.583 0.75 2.167 162.525 cft

Backfill Ht=E Ht-SC Ht-CS Ht


Qty=L*W*H
2 St B1& B3 MH 2 Cross 9 25 3 4.75 1.583 0.75 2.417 181.275 cft
3 St B1& B4 MH 3 Cross 9 25 3 4.92 1.583 0.75 2.587 194.025 cft
4 St B1& B5 MH 4 Cross 9 25 3 5.08 1.583 0.75 2.747 206.025 cft
5 St B1& B6 MH 5 Cross 9 25 3 4.75 1.583 0.75 2.417 181.275 cft
6 St B1& B7 MH 6 Cross 9 25 3 4.58 1.583 0.75 2.247 168.525 cft
Total 1093.650 cft
Backfill for House Connection Pipe 6" Dia
Road-15
dia(i
nche Dimensions in feets
S.No Location Manhole identity No s) No Length Width Height Quantity Units Remarks
1 Road-15 MH 1 6 2 3 3 3.42 61.56 cft
2 Road-15 MH 2 6 2 3 3 2.83 50.94 cft
3 Road-15 MH 3 6 2 3 3 4 72 cft

*H
4 Road-15 MH 4 6 2 3 3 4.25 76.5 cft

W
L*
5 Road-15 MH 5 6 2 3 3 3.42 61.56 cft

*
No
6 Road-15 MH 6 6 2 3 3 3.25 58.5 cft

y=
Qt
7 Road-15 MH 7 6 2 3 3 4.25 76.5 cft
8 Road-15 MH 8 6 2 3 3 2.92 52.56 cft
Total 510.12 cft
Street E-1
1 St E-1 MH 1 6 2 3 3 3.42 61.56 cft
2 St E-1 MH 2 6 2 3 3 3.42 61.56 cft

*H
3 St E-1 MH 3 6 2 3 3 4.42 79.56 cft

*W
4 St E-1 MH 4 6 2 3 3 4.25 76.5 cft

L
o*
N
5 St E-1 MH 5 6 2 3 3 3.5 63 cft

y=
Qt
6 St E-1 MH 6 6 2 3 3 4.33 77.94 cft
Total 420.12 cft

Page 11 of 77
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

Street E-2
1 St E-2 MH 3 6 2 3 3 4.33 77.94 cft
2 St E-2 MH 4 6 2 3 3 3.42 61.56 cft
3 St E-2 MH 5 6 2 3 3 3.25 58.5 cft

*H
*W
4 St E-2 MH 6 6 2 3 3 3 54 cft

L
o*
5 St E-2 MH 7 6 2 3 3 2.25 40.5 cft

N
y=
Total 292.5 cft

Qt
Street A-4
1 St A-4 MH 1 6 2 3 3 4.75 85.5 cft
2 St A-4 MH 2 6 2 3 3 4.25 76.5 cft

*H
3 St A-4 MH 3 6 2 3 3 4.25 76.5 cft

W
L*
4 St A-4 MH 4 6 2 3 3 4.25 76.5 cft

*
No
5 St A-4 MH 5 6 2 3 3 3 54 cft

y=
Qt
6 St A-4 MH A7.1 6 2 3 3 4.25 76.5 cft
Total 445.5 cft
Street A-7
1 St A-7 MH 3 6 2 3 3 4.5 81 cft
2 St A-7 MH 4 6 2 3 3 4.42 79.56 cft
3 St A-7 MH 5 6 2 3 3 4.42 79.56 cft
4 St A-7 MH 6 6 2 3 3 3.75 67.5 cft

*H
W
5 St A-7 MH 7 6 2 3 3 4.5 81 cft

* L*
6 St A-7 MH 8 6 2 3 3 3.5 63 cft

No
y=
7 St A-7 MH 9 6 2 3 3 4.16 74.88 cft

Qt
8 St A-7 MH 10 6 2 3 3 4.83 86.94 cft
9 St A-7 MH A7.2 6 2 3 3 5.66 101.88 cft
Total 715.32 cft
Street C-10
1 St C-10 CB3 6 2 3 3 3.42 61.56 cft
2 St C-10 MH 1 6 2 3 3 3.25 58.5 cft
3 St C-10 MH 2 6 2 3 3 4.33 77.94 cft

*H
W
4 St C-10 MH 3 6 2 3 3 4.25 76.5 cft

L*
o*
5 St C-10 MH 4 6 2 3 3 3.92 70.56 cft

N
y=
6 St C-10 MH 5 6 2 3 3 2.5 45 cft

Qt
Page 12 of 77
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

7 St C-10 CB3.1 6 2 3 3 4.33 77.94 cft


Total 468 cft
Main Boulevard C Sector
1 M.Blvrd C Sector MH 7 6 2 3 3 5 90 cft
2 M.Blvrd C Sector MH 6 6 2 3 3 5 90 cft
3 M.Blvrd C Sector MH 5 6 2 3 3 5 90 cft
4 M.Blvrd C Sector MH 4 6 2 3 3 5 90 cft
5 M.Blvrd C Sector MH 3 6 2 3 3 5 90 cft
6 M.Blvrd C Sector MH 2 6 2 3 3 5 90 cft
7 M.Blvrd C Sector MH 1 6 2 3 3 5 90 cft

*H
*W
8 M.Blvrd C Sector CB5 6 2 3 3 4.75 85.5 cft

L
o*
9 M.Blvrd C Sector MH 1 6 2 3 3 6.16 110.88 cft

N
y=
10 M.Blvrd C Sector CB4 6 2 3 3 6 108 cft

Qt
11 M.Blvrd C Sector MH 1 6 2 3 3 5.583 100.49 cft
12 M.Blvrd C Sector CB3 6 2 3 3 5.42 97.56 cft
13 M.Blvrd C Sector MH 2 6 2 3 3 5.16 92.88 cft
14 M.Blvrd C Sector MH 1 6 2 3 3 6.66 119.88 cft
15 M.Blvrd C Sector CB2 6 2 3 3 4.583 82.494 cft
Total 1427.7 cft
Main Boulevard Near B1
1 M.Blvrd Near B1 MH B1 6 2 3 3 4 72 cft

*H
2 M.Blvrd Near B1 MH 1 6 2 3 3 2.83 50.94 cft

W
L*
3 M.Blvrd Near B1 MH 2 6 2 3 3 2.5 45 cft

*
No
4 M.Blvrd Near B1 MH 3 6 2 3 3 3.42 61.56 cft

y=
Qt
Total 229.5 cft
Main Boulevard
1 M.Blvrd MHOld 6 2 3 3 3 54 cft
2 M.Blvrd MH CA 6 2 3 3 2.16 38.88 cft

*H
W
3 M.Blvrd MH 1 6 2 3 3 2.16 38.88 cft

* L*
4 M.Blvrd MH 3 6 2 3 3 2.16 38.88 cft

No
y=
5 M.Blvrd MH4- 6 2 3 3 3.16 56.88 cft

Qt
Total 227.52 cft
ROAD CROSSES Backfill for House Connection Pipe 6" Dia

Page 13 of 77
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

Street A-4
1 St A-4 MH 1 Cross 6 2 3 3 2.66 47.88 cft
2 St A-4 MH 2 Cross 6 2 3 3 2.66 47.88 cft

*H
3 St A-4 MH 3 Cross 6 2 3 3 2.66 47.88 cft

*W
4 St A-4 MH 4 Cross 6 2 3 3 2.66 47.88 cft

L
No*
5 St A-4 MH 5 Cross 6 2 3 3 2.66 47.88 cft

y=
Qt
6 St A-4 MH A-7.1 Cross 6 2 3 3 2.66 47.88 cft
Total 287.28 cft
Street A-5
1 St A-5 MH A-4 Cross 6 2 3 3 3.583 64.494 cft
2 St A-5 MH 1 Cross 6 2 3 3 3.33 59.94 cft
Qty=No*L*W*H
3 St A-5 MH 2 Cross 6 2 3 3 3.33 59.94 cft
Total 184.37 cft
Street A-7
1 St A-7 MH 3 Cross 6 2 3 3 2.66 47.88 cft
2 St A-7 MH 4 Cross 6 2 3 3 2.66 47.88 cft
3 St A-7 MH 5 Cross 6 2 3 3 2.66 47.88 cft
4 St A-7 MH 6 Cross 6 2 3 3 2.66 47.88 cft

*H
W
5 St A-7 MH 7 Cross 6 2 3 3 2.66 47.88 cft

L*
*
6 St A-7 MH 8 Cross 6 2 3 3 2.66 47.88 cft

No
y=
7 St A-7 MH 9 Cross 6 2 3 3 2.66 47.88 cft

Qt
8 St A-7 MH 10 Cross 6 2 3 3 2.66 47.88 cft
9 St A-7 MH A7.2 Cross 6 2 3 3 2.66 47.88 cft
Total 430.92 cft
Street C-8
1 St C-8 MH 1 Cross 6 2 3 3 3.16 56.88 cft
2 St C-8 MH 2 Cross 6 2 3 3 3.083 55.494 cft
3 St C-8 MH 3 Cross 6 2 3 3 2.83 50.94 cft

*H
W
4 St C-8 MH 4 Cross 6 2 3 3 3.66 65.88 cft

L*
*
5 St C-8 MH 5 Cross 6 2 3 3 3.083 55.494 cft

No
y=
6 St C-8 MH 6 Cross 6 2 3 33 54 cft

Qt
7 St C-8 MH 7 Cross 6 2 3 3 3.16 56.88 cft
Total 395.57 cft

Page 14 of 77
Back Fill Ghulam HussainCompany(Pvt).Ltd Line dia 9 inches

Street B1 & B2
1 St B1& B2 MH 1 Cross 6 2 3 3 2.83 50.94 cft
2 St B1& B3 MH 2 Cross 6 2 3 3 3.083 55.494 cft

*H
3 St B1& B4 MH 3 Cross 6 2 3 3 3.25 58.5 cft

*W
4 St B1& B5 MH 4 Cross 6 2 3 3 3.42 61.56 cft

L
o*
N
5 St B1& B6 MH 5 Cross 6 2 3 3 3.083 55.494 cft

y=
Qt
6 St B1& B7 MH 6 Cross 6 2 3 3 2.92 52.56 cft
Total 334.55 cft

Page 15 of 77
Summary of Bill Ghulam Hussain Company (Pvt).LTD

GHULAM HUSSAIN AND COMPANY ( PVT ) LTD


Summary of Quantities for Sewerage System
Street Numbers
Main
S.No Description A-2 A-5 A-6 B1 & B2 C-6 C-7 C-8 C-9 Boulevard Quantity units
A Excavation
1 Trench 9529.6 8322.2 7201.68 14238.66 6866 9785 15515.01 9090 15759 96307.15 Cft
2 Manhole 2309.76 2597.76 1701.12 2965.76 2736 2384 3925.76 3008 2484.48 24112.64 Cft
3 HDP pipe 6 inch dia 542.16 650.16 421.92 734.16 570 986.16 696 4600.56 Cft
Total 125020.35 Cft
B Back fill
1 Trench 4490.24 4542.68 3891.04 7527.98 3630.04 4776.12 8199.49 4126.84 3888 45072.43 Cft
2 Manhole 1452.75 1633.9 1069.94 1865.36 1368.63 1499.45 2469.16 1891.93 1562.65 14813.77 Cft
3 HDP pipe 6 inch dia 538.63 646.63 419.57 730.04 673.88 980.86 691.29 4680.9 Cft
Total 64567.1 Cft
C Sand cushion
1 Sand cushion 2958.91 2223.57 2000.92 3931.54 1800.02 2941.33 4236.22 2423.75 7285.27 29801.53 Cft
Total 29801.53 Cft
D Crushed aggregate
1 Crushed aggregate 1948.91 1464.57 1317.92 2589.53 1334.06 1937.32 2790.21 1925.75 5321.27 20629.54 Cft
Total 20629.54 Cft
E Length of RCC pipe
1 9 inch dia Pipe 514 387 347.5 681.5 374.5 511 736.5 509.5 4061.5 Rft
2 24 inch dia Pipe 989 989 Rft
3 HDP pipe 6 inch dia 36 36 24 42 36 54 42 270 Rft
F Manhole construction
1 Base course 115.39 115.395 76.93 134.62 134.62 115.39 173.09 153.86 134.63 1153.925 Cft
2 Bed pcc (1:4:8) 173.09 173.09 115.395 201.94 201.94 173.09 259.64 230.79 174.12 1703.095 Cft
3 Pcc Bench(1:2:4) 173.09 173.09 115.395 201.94 201.94 173.09 259.64 230.79 109.9 1638.875 Cft
4 Brickwork 289.04 339.63 221.05 384.88 338.37 302.27 514.54 438.52 389.74 3218.04 Cft
5 Internal Plaster 318.14 374.92 243.92 424.65 371.09 332.97 568.09 483.81 428.23 3545.82 Sft
5 External Plaster 452.71 530.77 345.56 601.7 531.23 473.09 804.01 685.59 611.08 5035.74 Sft

Page 16 of 77
Summary of Bill Ghulam Hussain Company (Pvt).LTD

7 Bitumen coating 452.71 530.77 345.56 601.7 531.23 473.09 804.01 685.59 611.08 5035.74 Sft

Page 17 of 77
Summary of Bill Ghulam Hussain Company (Pvt).LTD

Abstract of COST for Sewerage System


S.No Description Unit Rate / Unit T0tal Quantity Rupees (PKR)
A Excavation CFT 11 125020.35 1375223.85
B Back fill CFT 7 64567.1 451969.7
C Sand cushion CFT 35 29801.53 1043053.55
D Crushed aggregate CFT 75 20629.54 1547215.5
E Length of RCC pipe
1 RCC pipe 9 inch dia RFT 351.25 4061.5 1426601.875
2 RCC pipe 24 inch dia RFT 1378.75 989 1363583.75
3 HDP pipe 6 inch dia RFT 228.75 270 61762.5
F Manhole construction
1 Base course material CFT 75 1153.95 86546.25
2 Bed pcc (1:4:8) CFT 180 1703.1 306558
3 PCC Benching (1:2:4) CFT 305 1638.88 499858.4
4 Brickwork CFT 240 3218.04 772329.6
5 Internal Plaster SFT 30 3545.82 106374.6
6 External Plaster SFT 30 5035.74 151072.2
7 Bitumen coating SFT 11.3 5035.74 56903.862
Total Cost of sewerage system Rupees ( PKR ) 9249053.64

Page 18 of 77
Details of Measurements & Calcuation of Quantities for the Excavation of A Sector
Excavation for Trench
street A-2
Dimensions in feets
Line Ist MH 2nd MH Avg
S.No Location From-To dia(inches) No Length Width Height Height Height Quantity Units Remarks
1 st A-2 MH Old-MH 1 9 1 135 4 5 5 5 2700 cft

Qty=No*L*W*H
2 st A-2 MH 1-MH 2 9 1 37 4 5 4.92 4.96 734.08 cft
3 st A-2 MH 2-MH 3 9 1 31 4 4.92 4.83 4.875 604.5 cft
4 st A-2 MH 3-MH 4 9 1 105 4 4.83 4.75 4.79 2011.8 cft
5 st A-2 MH 4-MH 5 9 1 93 4 4.75 4.67 4.71 1752.12 cft
6 st A-2 MH 5-MH 6 9 1 95 4 4.67 4.42 4.545 1727.1 cft
Total 9529.6 cft
street A-5
1 stA-5 MH N1-MH N2 9 1 48 4 5.33 5.33 5.33 1023.36 cft

Qty=No*L*W*H
2 stA-5 MH N2-MH A4 9 1 36 4 5.33 5.92 5.625 810 cft
3 stA-5 MH A4-MH 1 9 1 102 4 5.92 5.67 5.795 2364.36 cft
4 stA-5 MH 1-MH 2 9 1 92 4 5.67 5.67 5.67 2086.56 cft
5 stA-5 MH 2-MH 3 9 1 94 4 5.67 5.17 5.42 2037.92 cft
Total 8322.2 cft
street A-6
1 st A-6 MH Old-MH 1 9 1 53 4 5.58 5.58 5.58 1182.96 cft

Qty=No*L*W*H
2 st A-6 MH 1-MH 2 9 1 96 4 5.33 5.58 5.42 2081.28 cft
3 st A-6 MH 2-MH 3 9 1 94 4 5.92 5.42 5.5 2068 cft
4 st A-6 MH 3-MH 4 9 1 92 4 5.67 5.5 5.08 1869.44 cft
Total 7201.68 cft
Street A-4
1 St A-4 MH 1-MH 2 9 1 76 3 5.5 5 5.25 1197 cft

Qty=No*L*W*H
2 St A-4 MH 2-MH 3 9 1 77 3 5 5 5 1155 cft
3 St A-4 MH 3-MH 4 9 1 76 3 5 5 5 1140 cft
4 St A-4 MH 4-MH 5 9 1 85 3 5 3.75 4.375 1115.625 cft
5 St A-4 MH 5-MH A7.1 9 1 94 3 3.75 5 4.375 1233.75 cft
Qty=No*L*W
Total 5841.375 cft
Street A-7
1 St A-7 MH 3-MH 4 9 1 84 3 5.33 5.083 5.207 1312.038 cft
2 St A-7 MH 4-MH 5 9 1 84 3 5.083 5.16 5.122 1290.618 cft

Qty=No*L*W*H
3 St A-7 MH 5-MH 6 9 1 85 3 5.16 4.583 4.872 1242.233 cft
4 St A-7 MH 6-MH 7 9 1 85 3 4.583 5.25 4.917 1253.708 cft
5 St A-7 MH 7-MH 8 9 1 84 3 5.25 4.25 4.750 1197.000 cft
6 St A-7 MH 8-MH 9 9 1 84 3 4.25 4.92 4.585 1155.420 cft
7 St A-7 MH 9-MH 10 9 1 93.5 3 4.92 5.583 5.252 1473.046 cft
8 St A-7 MH 10-MH A7.2 9 1 45 3 5.583 6.42 6.002 810.203 cft
Total 9734.264 cft
Excavation for House connection pipe 6" Dia
street A-2
Manhole identity Line Dimensions in feets
S.No Location No dia(inches) No Length Width Height Quantity Units Remarks
1 st A-2 MH 1 6 2 3 4 4 96 cft
2 st A-2 MH 2 6 2 3 4 3.92 94.08 cft

*H
3 st A-2 MH 3 6 2 3 4 3.83 91.92 cft

W
L*
4 st A-2 MH 4 6 2 3 4 3.75 90 cft

*
No
5 st A-2 MH 5 6 2 3 4 3.67 88.08 cft

y=
Qt
6 st A-2 MH 6 6 2 3 4 3.42 82.08 cft
Total 542.16 cft
street A-5
1 stA-5 MH New1 6 2 3 4 4.33 103.92 cft
2 stA-5 MH New2 6 2 3 4 4.33 103.92 cft

*H
3 stA-5 MH A4 6 2 3 4 4.92 118.08 cft

*W
4 stA-5 MH 1 6 2 3 4 4.67 112.08 cft

L
N o*
5 stA-5 MH 2 6 2 3 4 4.67 112.08 cft

y=
Qt
6 stA-5 MH 3 6 2 3 4 4.17 100.08 cft
Total 650.16 cft
street A-6
1 st A-6 MH 1 6 2 3 4 4.58 109.92 cft
2 st A-6 MH 2 6 2 3 4 4.42 106.08 cft

*H
W
L**
No
y=
Qt
3 st A-6 MH 3 6 2 3 4 4.5 108 cft
4 st A-6 MH 4 6 2 3 4 4.08 97.92 cft
Total 421.92 cft
Street A-4
1 St A-4 MH 1 6 2 3 3 5.25 94.5 cft
2 St A-4 MH 2 6 2 3 3 4.75 85.5 cft

*H
3 St A-4 MH 3 6 2 3 3 4.75 85.5 cft

*W
4 St A-4 MH 4 6 2 3 3 4.75 85.5 cft

L
No*
5 St A-4 MH 5 6 2 3 3 3.5 63 cft

y=
Qt
6 St A-4 MH A7.1 6 2 3 3 4.75 85.5 cft
Total 499.5 cft
Street A-7
1 St A-7 MH 3 6 2 3 3 5 90 cft
2 St A-7 MH 4 6 2 3 3 4.92 88.56 cft
3 St A-7 MH 5 6 2 3 3 4.92 88.56 cft
4 St A-7 MH 6 6 2 3 3 4.25 76.5 cft

*H
W
5 St A-7 MH 7 6 2 3 3 5 90 cft

* L*
6 St A-7 MH 8 6 2 3 3 4 72 cft

No
y=
7 St A-7 MH 9 6 2 3 3 4.66 83.88 cft

Qt
8 St A-7 MH 10 6 2 3 3 5.33 95.94 cft
9 St A-7 MH A7.2 6 2 3 3 6.16 110.88 cft
Total 796.32 cft
ROAD CROSSES Trench Excavation
Street A-4
1 St A-4 MH 1 Cross 6 1 23.5 3 4.5 317.25 cft

Qty=No*L*W*H
2 St A-4 MH 2 Cross 6 1 23.5 3 4.5 317.25 cft
3 St A-4 MH 3 Cross 6 1 23.25 3 4.5 313.875 cft
4 St A-4 MH 4 Cross 6 1 23.75 3 4.5 320.625 cft
5 St A-4 MH 5 Cross 6 1 24 3 4.5 324 cft
6 St A-4 MH A-7.1 Cross 6 1 23.25 3 4.5 313.875 cft
Total 1906.875 cft
Street A-5
1 St A-5 MH A-4 Cross 9 1 29 3 5.25 456.75 cft
same as above
2 St A-5 MH 1 Cross 9 1 22 3 5 330 cft
same as above
3 St A-5 MH 2 Cross 9 1 22 3 5 330 cft
Total 1116.75 cft
Street A-7
1 St A-7 MH 3 Cross 6 1 30 3 4.5 405 cft
2 St A-7 MH 4 Cross 6 1 24.92 3 4.5 336.42 cft
3 St A-7 MH 5 Cross 6 1 23.75 3 4.5 320.625 cft

Qty=No*L*W*H
4 St A-7 MH 6 Cross 6 1 23.75 3 4.5 320.625 cft
5 St A-7 MH 7 Cross 6 1 23.75 3 4.5 320.625 cft
6 St A-7 MH 8 Cross 6 1 23.25 3 4.5 313.875 cft
7 St A-7 MH 9 Cross 6 1 24 3 4.5 324 cft
8 St A-7 MH 10 Cross 6 1 24 3 4.5 324 cft
9 St A-7 MH A7.2 Cross 6 1 23.83 3 4.5 321.705 cft
Total 2986.875 cft
ROAD CROSSES Excavation for House Connection Pipe 6" Dia
Street A-4
1 St A-4 MH 1 Cross 6 2 3 3 3.16 56.88 cft
2 St A-4 MH 2 Cross 6 2 3 3 3.16 56.88 cft

*H
3 St A-4 MH 3 Cross 6 2 3 3 3.16 56.88 cft

W
L*
4 St A-4 MH 4 Cross 6 2 3 3 3.16 56.88 cft

*
No
5 St A-4 MH 5 Cross 6 2 3 3 3.16 56.88 cft

y=
Qt
6 St A-4 MH A-7.1 Cross 6 2 3 3 3.16 56.88 cft
Total 341.28 cft
Street A-5
1 St A-5 MH A-4 Cross 6 2 3 3 4.083 73.494 cft
2 St A-5 MH 1 Cross 6 2 3 3 3.83 68.94 cft
Qty=No*L*W*H
3 St A-5 MH 2 Cross 6 2 3 3 3.83 68.94 cft
Total 211.374 cft
Street A-7
1 St A-7 MH 3 Cross 6 2 3 3 3.16 56.88 cft
2 St A-7 MH 4 Cross 6 2 3 3 3.16 56.88 cft
3 St A-7 MH 5 Cross 6 2 3 3 3.16 56.88 cft
4 St A-7 MH 6 Cross 6 2 3 3 3.16 56.88 cft

*H
*W
L
N o*
y=
Qt
5 St A-7 MH 7 Cross 6 2 3 3 3.16 56.88 cft
6 St A-7 MH 8 Cross 6 2 3 3 3.16 56.88 cft
7 St A-7 MH 9 Cross 6 2 3 3 3.16 56.88 cft
8 St A-7 MH 10 Cross 6 2 3 3 3.16 56.88 cft
9 St A-7 MH A7.2 Cross 6 2 3 3 3.16 56.88 cft
Total 511.92 cft
Excavation for Manhole
street A-2
Dimensions in feets
Line Ist MH 2nd MH Avg
S.No Location From-To dia(inches) No Length Width Height Height Height Quantity Units Remarks
1 st A-2 MH 1 9 1 8 8 4 4 6.25 400 cft

Qty=No*L*W*H
2 st A-2 MH 2 9 1 8 8 3.92 3.92 6.17 394.88 cft
3 st A-2 MH 3 9 1 8 8 3.83 3.83 6.08 389.12 cft
4 st A-2 MH 4 9 1 8 8 3.75 3.75 6 384 cft
5 st A-2 MH 5 9 1 8 8 3.67 3.67 5.92 378.88 cft
6 st A-2 MH 6 9 1 8 8 3.42 3.42 5.67 362.88 cft
Total 2309.76 cft
street A-5
1 stA-5 MH New1 9 1 8 8 4.33 4.33 6.58 421.12 cft

Qty=No*L*W*H
2 stA-5 MH New2 9 1 8 8 4.33 4.33 6.58 421.12 cft
3 stA-5 MH A4 9 1 8 8 4.92 4.92 7.17 458.88 cft
4 stA-5 MH 1 9 1 8 8 4.67 4.67 6.92 442.88 cft
5 stA-5 MH 2 9 1 8 8 4.67 4.67 6.92 442.88 cft
6 stA-5 MH 3 9 1 8 8 4.17 4.17 6.42 410.88 cft
Total 2597.76 cft
street A-6
1 st A-6 MH 1 9 1 8 8 4.58 4.58 6.83 437.12 cft

Qty=No*L*W*H
2 st A-6 MH 2 9 1 8 8 4.42 4.42 6.67 426.88 cft
3 st A-6 MH 3 9 1 8 8 4.5 4.5 6.75 432 cft
4 st A-6 MH 4 9 1 8 8 4.08 4.08 6.33 405.12 cft
Total 1701.12 cft
Street A-4
1 St A-4 MH 1 9 1 8 8 6.75 432 cft

Qty=No*L*W*H
2 St A-4 MH 2 9 1 8 8 6.25 400 cft
3 St A-4 MH 3 9 1 8 8 6.25 400 cft
4 St A-4 MH 4 9 1 8 8 6.25 400 cft
5 St A-4 MH 5 9 1 8 8 5 320 cft
6 St A-4 MH A7.1 9 1 8 8 6.25 400 cft
Total 2352 cft
Street A-7
1 St A-7 MH 3 9 1 8 8 6.5 416 cft
2 St A-7 MH 4 9 1 8 8 6.42 410.88 cft
3 St A-7 MH 5 9 1 8 8 6.42 410.88 cft

Qty=No*L*W*H
4 St A-7 MH 6 9 1 8 8 5.75 368 cft
5 St A-7 MH 7 9 1 8 8 6.5 416 cft
6 St A-7 MH 8 9 1 8 8 5.5 352 cft
7 St A-7 MH 9 9 1 8 8 6.16 394.24 cft
8 St A-7 MH 10 9 1 8 8 6.83 437.12 cft
9 St A-7 MH A7.2 9 1 8 8 7.66 490.24 cft
3695.36 cft
ROAD CROSSES Excavation for Manhole
Street A-4
1 St A-4 MH 1 Cross 6 1 7 7 4.66 228.34 cft

Qty=No*L*W*H
2 St A-4 MH 2 Cross 6 1 7 7 4.66 228.34 cft
3 St A-4 MH 3 Cross 6 1 7 7 4.66 228.34 cft
4 St A-4 MH 4 Cross 6 1 7 7 4.66 228.34 cft
5 St A-4 MH 5 Cross 6 1 7 7 4.66 228.34 cft
6 St A-4 MH A-7.1 Cross 6 1 7 7 4.66 228.34 cft
Total 1370.04 cft
Street A-5
1 St A-5 MH A-4 Cross 9 1 8 8 5.583 357.312 cft
2 St A-5 MH 1 Cross 9 1 8 8 5.33 341.12 cft
same as above
3 St A-5 MH 2 Cross 9 1 8 8 5.33 341.12 cft
Total 1039.552 cft
Street A-7
1 St A-7 MH 3 Cross 6 1 7 7 4.66 228.34 cft
2 St A-7 MH 4 Cross 6 1 7 7 4.66 228.34 cft
3 St A-7 MH 5 Cross 6 1 7 7 4.66 228.34 cft

Qty=No*L*W*H
4 St A-7 MH 6 Cross 6 1 7 7 4.66 228.34 cft
5 St A-7 MH 7 Cross 6 1 7 7 4.66 228.34 cft
6 St A-7 MH 8 Cross 6 1 7 7 4.66 228.34 cft
7 St A-7 MH 9 Cross 6 1 7 7 4.66 228.34 cft
8 St A-7 MH 10 Cross 6 1 7 7 4.66 228.34 cft
9 St A-7 MH A7.2 Cross 6 1 7 7 4.66 228.34 cft
Total 2055.06 cft

Details of Measurements & Calcuation of Quantities for the Excavation of B Sector


Excavation for Trench
street B-1& B-2
1 st B1& B2 MH Old-MH 1 9 1 97 4 5.25 5.25 5.25 2037 cft
2 st B1& B2 MH 1-MH 2 9 1 89 4 5.25 5.42 5.335 1899.26 cft

Qty=No*L*W*H
3 st B1& B2 MH 2-MH 3 9 1 99 4 5.42 5.75 5.585 2211.66 cft
4 st B1& B2 MH 3-MH 4 9 1 94 4 5.75 5.58 5.665 2130.04 cft
5 st B1& B2 MH 4-MH 5 9 1 94.5 4 5.58 5.42 5.5 2079 cft
6 st B1& B2 MH 5-MH 6 9 1 93 4 5.42 5.17 5.295 1969.74 cft
7 st B1& B2 MH 6-MH 7 9 1 94 4 5.17 5 5.085 1911.96 cft
Total 14238.66 cft
Excavation for House connection pipe 6" Dia
street B1&B2
1 st B1& B2 MH 1 6 2 3 4 4.25 102 cft
2 st B1& B2 MH 2 6 2 3 4 4.42 106.08 cft
3 st B1& B2 MH 3 6 2 3 4 4.75 114 cft

*H
W
4 st B1& B2 MH 4 6 2 3 4 4.58 109.92 cft

* L*
5 st B1& B2 MH 5 6 2 3 4 4.42 106.08 cft

No
y=
6 st B1& B2 MH 6 6 2 3 4 4.17 100.08 cft

Qt
7 st B1& B2 MH 7 6 2 3 4 4 96 cft
Total 734.16 cft
ROAD CROSSES Trench Excavation
Street B1 & B2
1 St B1& B2 MH 1 Cross 9 1 22 3 4.5 297 cft

Qty=No*L*W*H
2 St B1& B2 MH 2 Cross 9 1 22 3 4.75 313.5 cft
3 St B1& B2 MH 3 Cross 9 1 22 3 4.92 324.72 cft
4 St B1& B2 MH 4 Cross 9 1 22 3 5.08 335.28 cft
5 St B1& B2 MH 5 Cross 9 1 22 3 4.75 313.5 cft
6 St B1& B2 MH 6 Cross 9 1 22 3 4.58 302.28 cft
Total 1886.28 cft
ROAD CROSSES Excavation for House Connection Pipe 6" Dia
Street B1 & B2
1 St B1& B2 MH 1 Cross 6 2 3 3 3.33 59.94 cft
2 St B1& B3 MH 2 Cross 6 2 3 3 3.583 64.494 cft

*H
3 St B1& B4 MH 3 Cross 6 2 3 3 3.75 67.5 cft

W
L*
4 St B1& B5 MH 4 Cross 6 2 3 3 3.92 70.56 cft

*
No
5 St B1& B6 MH 5 Cross 6 2 3 3 3.583 64.494 cft

y=
Qt
6 St B1& B7 MH 6 Cross 6 2 3 3 3.42 61.56 cft
Total 388.548 cft
Excavation for Manhole
street B1&B2
1 st B1& B2 MH 1 9 1 8 8 4.25 4.25 6.5 416 cft
2 st B1& B2 MH 2 9 1 8 8 4.42 4.42 6.67 426.88 cft

Qty=No*L*W*H
3 st B1& B2 MH 3 9 1 8 8 4.75 4.75 7 448 cft
4 st B1& B2 MH 4 9 1 8 8 4.58 4.58 6.83 437.12 cft
5 st B1& B2 MH 5 9 1 8 8 4.42 4.42 6.67 426.88 cft
6 st B1& B2 MH 6 9 1 8 8 4.17 4.17 6.42 410.88 cft
7 st B1& B2 MH 7 9 1 8 8 4 4 6.25 400 cft
Total 2965.76 cft
ROAD CROSSES Excavation for Manhole
Street B1 & B2
1 St B1& B2 MH 1 Cross 9 1 8 8 4.83 309.12 cft

Qty=No*L*W*H
2 St B1& B3 MH 2 Cross 9 1 8 8 5.083 325.312 cft
3 St B1& B4 MH 3 Cross 9 1 8 8 5.25 336 cft
4 St B1& B5 MH 4 Cross 9 1 8 8 5.42 346.88 cft
Qty=No*L*W*H
5 St B1& B6 MH 5 Cross 9 1 8 8 5.083 325.312 cft
6 St B1& B7 MH 6 Cross 9 1 8 8 4.92 314.88 cft
Total 1957.504 cft

Details of Measurements & Calcuation of Quantities for the Excavation of C Sector


Excavation for Trench
street C-7
1 st C-7 MH C9-6-MH 1 9 1 33 4 5.5 5.5 5.5 726 cft

Qty=No*L*W*H
2 st C-7 MH 1-MH 2 9 1 87 4 5.5 4.75 5.125 1783.5 cft
3 st C-7 MH 2-MH 3 9 1 90 4 4.75 4.75 4.75 1710 cft
4 st C-7 MH 3-MH 4 9 1 94 4 4.75 5 4.875 1833 cft
5 st C-7 MH 4-MH 5 9 1 94 4 5 5 5 1880 cft
6 st C-7 MH 5-MH 6 9 1 95 4 5 4.75 4.875 1852.5 cft
Total 9785 cft
street C-8
1 stC-8 MH C9-2-MH 1 9 1 66 4 4.5 5.5 5 1320 cft
2 stC-8 MH 1-MH 2 9 1 94 4 5.5 5.42 5.46 2052.96 cft
3 stC-8 MH 2-MH 3 9 1 89 4 5.42 5.17 5.295 1885.02 cft

Qty=No*L*W*H
4 stC-8 MH 3-MH 4 9 1 94 4 5.17 6 5.585 2099.96 cft
5 stC-8 MH 4-MH 5 9 1 92 4 6 5.42 5.71 2101.28 cft
6 stC-8 MH 5-MH 6 9 1 95 4 5.42 5.33 5.375 2042.5 cft
7 stC-8 MH 6-MH 7 9 1 94 4 5.33 5.5 5.415 2036.04 cft
8 stC-8 MH 7-MH 8 9 1 32 4 5.5 5.75 5.625 720 cft
9 stC-8 MH 8-MH 9 9 1 53.5 4 5.75 6 5.875 1257.25 cft
Total 15515.01 cft
street C-9
1 stC-9 MH MR-MH 1 9 1 101 4 4.5 4.5 4.5 1818 cft
2 stC-9 MH 1-MH 2 9 1 90 4 4.5 4.5 4.5 1620 cft

Qty=No*L*W*H
3 stC-9 MH 2-MH 3 9 1 56 4 4.5 4.5 4.5 1008 cft
4 stC-9 MH 3-MH 4 9 1 44 4 4.5 4.5 4.5 792 cft
5 stC-9 MH 4-MH 5 9 1 49 4 4.5 4.5 4.5 882 cft
6 stC-9 MH 5-MH 6 9 1 48 4 4.5 5.5 5 960 cft
7 stC-9 MH 6-MH 7 9 1 100.5 4 5.5 4.5 5 2010 cft
Qty=No*L
Total 9090 cft
street C-6
1 st C-6 MH Old-MH 1 9 1 34 4- 4.5 612 cft
2 st C-6 MH 1-MH 2 9 1 33 4- 4.5 594 cft

Qty=No*L*W*H
3 st C-6 MH 2-MH 3 9 1 96 4- 5 1920 cft
4 st C-6 MH 3-MH 4 9 1 91 4- 5 1820 cft
5 st C-6 MH 4-MH 5 9 1 33 4- 5 660 cft
6 st C-6 MH 5-MH 6 9 1 27 4- 5 540 cft
7 st C-6 MH 6-MH 7 9 1 36 4 5 720 cft
Total 6866 cft
Street C-10
1 St C-10 CB3-MH 1 9 1 109 3 2.083 4.16 3.122 1020.731 cft

Qty=No*L*W*H
2 St C-10 MH 1-MH 2 9 1 97 3 4.16 4 4.080 1187.28 cft
3 St C-10 MH 2-MH 3 9 1 51.5 3 4 5.083 4.542 701.6618 cft
4 St C-10 MH 3-MH 4 9 1 52 3 5.083 5 5.042 786.474 cft
5 St C-10 MH 4-MH 5 9 1 48 3 5 4.583 4.792 689.976 cft
6 St C-10 MH 5-CB3.1 9 1 44 3 4.583 3.25 3.917 516.978 cft
Total 4903.1 cft
Road-15
1 Road-15 MH 1-MH 2 9 1 44 4 4.16 732.16 cft
2 Road-15 MH 2-MH 3 9 1 44 4 3.58 630.08 cft

Qty=No*L*W*H
3 Road-15 MH 3-MH 4 9 1 49 4 4.75 931 cft
4 Road-15 MH 4-MH 5 9 1 49 4 5 980 cft
5 Road-15 MH 5-MH 6 9 1 49 4 4.16 815.36 cft
6 Road-15 MH 6-MH 7 9 1 50 4 4 800 cft
7 Road-15 MH 7-MH 8 9 1 93 4 5 1860 cft
8 Road-15 MH 8-MH-MR 9 1 105 4 3.66 1537.2 cft
Total 8285.8 cft
Excavation for House connection pipe 6" Dia
street C-7
1 st C-7 MH 1 6 2 3 4 4.5 108 cft
2 st C-7 MH 2 6 2 3 4 3.75 90 cft

*H
3 st C-7 MH 3 6 2 3 4 3.75 90 cft

W
* L*
No
y=
Qt
4 st C-7 MH 4 6 2 3 4 4 96 cft
5 st C-7 MH 5 6 2 3 4 4 96 cft
6 st C-7 MH 6 6 2 3 4 3.75 90 cft
Total 570 cft
street C-8
1 stC-8 MH 1 6 2 3 4 4.5 108 cft
2 stC-8 MH 2 6 2 3 4 4.42 106.08 cft
3 stC-8 MH 3 6 2 3 4 4.17 100.08 cft
4 stC-8 MH 4 6 2 3 4 5 120 cft

*H
W
5 stC-8 MH 5 6 2 3 4 4.42 106.08 cft

* L*
6 stC-8 MH 6 6 2 3 4 4.33 103.92 cft

No
y=
7 stC-8 MH 7 6 2 3 4 4.5 108 cft

Qt
8 stC-8 MH 8 6 2 3 4 4.75 114 cft
9 stC-8 MH 9 6 2 3 4 5 120 cft
Total 986.16 cft
street C-9
1 stC-9 MH MR 6 2 3 4 3.5 84 cft
2 stC-9 MH 1 6 2 3 4 3.5 84 cft
3 stC-9 MH 2 6 2 3 4 3.5 84 cft

*H
4 stC-9 MH 3 6 2 3 4 3.5 84 cft

W
L*
5 stC-9 MH 4 6 2 3 4 3.5 84 cft

*
No
6 stC-9 MH 5 6 2 3 4 3.5 84 cft

y=
Qt
7 stC-9 MH 6 6 2 3 4 4.5 108 cft
8 stC-9 MH 7 6 2 3 4 3.5 84 cft
Total 696 cft
street C-6
1 stC-6 MH 1 6 2 3 4 3.5 84 cft
2 stC-6 MH 2 6 2 3 4 3.5 84 cft
3 stC-6 MH 3 6 2 3 4 3.5 84 cft

*H
W
4 stC-6 MH 4 6 2 3 4 3.5 84 cft

L**
5 stC-6 MH 5 6 2 3 4 3.5 84 cft

No
y=
6 stC-6 MH 6 6 2 3 4 3.5 84 cft

Qt
7 stC-6 MH 7 6 2 3 4 4.5 108 cft
Total 612 cft
Street C-10
1 St C-10 CB3 6 2 3 3 3.92 70.56 cft
2 St C-10 MH 1 6 2 3 3 3.75 67.5 cft
3 St C-10 MH 2 6 2 3 3 4.83 86.94 cft

*H
W
4 St C-10 MH 3 6 2 3 3 4.75 85.5 cft

* L*
5 St C-10 MH 4 6 2 3 3 4.42 79.56 cft

No
y=
6 St C-10 MH 5 6 2 3 3 3 54 cft

Qt
7 St C-10 CB3.1 6 2 3 3 4.83 86.94 cft
Total 531 cft
Road-15
1 Road-15 MH 1 6 2 3 3 3.92 70.56 cft
2 Road-15 MH 2 6 2 3 3 3.33 59.94 cft
3 Road-15 MH 3 6 2 3 3 4.5 81 cft

*H
4 Road-15 MH 4 6 2 3 3 4.75 85.5 cft

W
L*
5 Road-15 MH 5 6 2 3 3 3.92 70.56 cft

*
No
6 Road-15 MH 6 6 2 3 3 3.75 67.5 cft

y=
Qt
7 Road-15 MH 7 6 2 3 3 4.75 85.5 cft
8 Road-15 MH 8 6 2 3 3 3.42 61.56 cft
Total 582.12 cft
ROAD CROSSES Trench Excavation
Street C-8
1 St C-8 MH 1 Cross 9 1 37 3 4.83 536.13 cft
2 St C-8 MH 2 Cross 9 1 23 3 4.75 327.75 cft

Qty=No*L*W*H
3 St C-8 MH 3 Cross 9 1 22 3 4.5 297 cft
4 St C-8 MH 4 Cross 9 1 22 3 5.33 351.78 cft
5 St C-8 MH 5 Cross 9 1 22 3 4.75 313.5 cft
6 St C-8 MH 6 Cross 9 1 22 3 4.66 307.56 cft
7 St C-8 MH 7 Cross 9 1 23 3 4.83 333.27 cft
Total 2466.99 cft
ROAD CROSSES Excavation for House Connection Pipe 6" Dia
Street C-8
1 St C-8 MH 1 Cross 6 2 3 3 3.66 65.88 cft

*H
L *W
o*
=N
2 St C-8 MH 2 Cross 6 2 3 3 3.583 64.494 cft
3 St C-8 MH 3 Cross 6 2 3 3 3.33 59.94 cft
4 St C-8 MH 4 Cross 6 2 3 3 4.16 74.88 cft
5 St C-8 MH 5 Cross 6 2 3 3 3.583 64.494 cft
6 St C-8 MH 6 Cross 6 2 3 3 3.5 63 cft
7 St C-8 MH 7 Cross 6 2 3 3 3.66 65.88 cft
Total 458.568 cft
Excavation for Manhole
street C-7
1 st C-7 MH 1 9 1 8 8 6.75 6.75 432 cft

Qty=No*L*W*H
2 st C-7 MH 2 9 1 8 8 6 6 384 cft
3 st C-7 MH 3 9 1 8 8 6 6 384 cft
4 st C-7 MH 4 9 1 8 8 6.25 6.25 400 cft
5 st C-7 MH 5 9 1 8 8 6.25 6.25 400 cft
6 st C-7 MH 6 9 1 8 8 6 6 384 cft
Total 2384 cft
street C-8
1 stC-8 MH 1 9 1 8 8 6.75 6.75 432 cft
2 stC-8 MH 2 9 1 8 8 6.67 6.67 426.88 cft
3 stC-8 MH 3 9 1 8 8 6.42 6.42 410.88 cft

Qty=No*L*W*H
4 stC-8 MH 4 9 1 8 8 7.25 7.25 464 cft
5 stC-8 MH 5 9 1 8 8 6.67 6.67 426.88 cft
6 stC-8 MH 6 9 1 8 8 6.58 6.58 421.12 cft
7 stC-8 MH 7 9 1 8 8 6.75 6.75 432 cft
8 stC-8 MH 8 9 1 8 8 7 7 448 cft
9 stC-8 MH 9 9 1 8 8 7.25 7.25 464 cft
Total 3925.76 cft
street C-9
1 stC-9 MH MR 9 1 8 8 5.75 5.75 368 cft
2 stC-9 MH 1 9 1 8 8 5.75 5.75 368 cft

Qty=No*L*W*H
3 stC-9 MH 2 9 1 8 8 5.75 5.75 368 cft
4 stC-9 MH 3 9 1 8 8 5.75 5.75 368 cft
5 stC-9 MH 4 9 1 8 8 5.75 5.75 368 cft
Qty=No*L*W*H
6 stC-9 MH 5 9 1 8 8 5.75 5.75 368 cft
7 stC-9 MH 6 9 1 8 8 6.75 6.75 432 cft
8 stC-9 MH 7 9 1 8 8 5.75 5.75 368 cft
Total 3008 cft
street C-6
1 st C-6 MH 1 9 1 8 8 5.75 368 cft
2 st C-6 MH 2 9 1 8 8 5.75 368 cft

Qty=No*L*W*H
3 st C-6 MH 3 9 1 8 8 6.25 400 cft
4 st C-6 MH 4 9 1 8 8 6.25 400 cft
5 st C-6 MH 5 9 1 8 8 6.25 400 cft
6 st C-6 MH 6 9 1 8 8 6.25 400 cft
7 st C-6 MH 7 9 1 8 8 6.25 400 cft
Total 2736 cft
Street C-10
1 St C-10 CB3 9 1 8 8 5.42 346.88 cft
2 St C-10 MH 1 9 1 8 8 5.25 336 cft

Qty=No*L*W*H
3 St C-10 MH 2 9 1 8 8 6.33 405.12 cft
4 St C-10 MH 3 9 1 8 8 6.25 400 cft
5 St C-10 MH 4 9 1 8 8 5.92 378.88 cft
6 St C-10 MH 5 9 1 8 8 4.5 288 cft
7 St C-10 CB3.1 9 1 8 8 6.33 405.12 cft
Total 2560 cft
Road-15
1 Road-15 MH 1 9 1 8 8 5.42 346.88 cft
2 Road-15 MH 2 9 1 8 8 4.83 309.12 cft

Qty=No*L*W*H
3 Road-15 MH 3 9 1 8 8 6 384 cft
4 Road-15 MH 4 9 1 8 8 6.25 400 cft
5 Road-15 MH 5 9 1 8 8 5.42 346.88 cft
6 Road-15 MH 6 9 1 8 8 5.25 336 cft
7 Road-15 MH 7 9 1 8 8 6.25 400 cft
8 Road-15 MH 8 9 1 8 8 4.92 314.88 cft
Total 2837.76 cft
ROAD CROSSES Excavation for Manhole
Street C-8
1 St C-8 MH 1 Cross 9 1 8 8 5.16 330.24 cft
2 St C-8 MH 2 Cross 9 1 8 8 5.083 325.312 cft

Qty=No*L*W*H
3 St C-8 MH 3 Cross 9 1 8 8 4.83 309.12 cft
4 St C-8 MH 4 Cross 9 1 8 8 5.66 362.24 cft
5 St C-8 MH 5 Cross 9 1 8 8 5.083 325.312 cft
6 St C-8 MH 6 Cross 9 1 8 8 5 320 cft
7 St C-8 MH 7 Cross 9 1 8 8 5.16 330.24 cft
Total 2302.464 cft

Details of Measurements & Calcuation of Quantities for the Excavation of E Sector


Excavation for Trench
Street E-1
1 St E-1 MH 1-MH 2 9 1 92.5 4 4.16 1539.2 cft

Qty=No*L*W*H
2 St E-1 MH 2-MH 3 9 1 93.5 4 4.16 1555.84 cft
3 St E-1 MH 3-MH 4 9 1 93 4 5.16 1919.52 cft
4 St E-1 MH 4-MH 5 9 1 92.75 4 5 1855 cft
5 St E-1 MH 5-MH 6 9 1 92 4 4.75 1748 cft
Total 8617.56 cft
Street E-2
1 St E-2 MH 3-MH 4 9 1 93 4 5.08 1889.76 cft

Qty=No*L*W*H
2 St E-2 MH 4-MH 5 9 1 93 4 4.16 1547.52 cft
3 St E-2 MH 5-MH 6 9 1 94 4 4 1504 cft
4 St E-2 MH 6-MH 7 9 1 93 4 3.75 1395 cft
Total 6336.28 cft
Excavation for House Connection Pipe 6" Dia
Street E-1
1 St E-1 MH 1 6 2 3 3 3.92 70.56 cft
2 St E-1 MH 2 6 2 3 3 3.92 70.56 cft

*H
3 St E-1 MH 3 6 2 3 3 4.92 88.56 cft

W
L*
4 St E-1 MH 4 6 2 3 3 4.75 85.5 cft

*
No
5 St E-1 MH 5 6 2 3 3 4 72 cft

y=
Qt
6 St E-1 MH 6 6 2 3 3 4.83 86.94 cft
Total 474.12 cft
Street E-2
1 St E-2 MH 3 6 2 3 3 4.83 86.94 cft
2 St E-2 MH 4 6 2 3 3 3.92 70.56 cft
3 St E-2 MH 5 6 2 3 3 3.75 67.5 cft

*H
W
4 St E-2 MH 6 6 2 3 3 3.5 63 cft

L**
No
5 St E-2 MH 7 6 2 3 3 2.75 49.5 cft

y=
Total 337.5 cft

Qt
Excavation for Manhole
Street E-1
1 St E-1 MH 1 9 1 8 8 5.42 346.88 cft

Qty=No*L*W*H
2 St E-1 MH 2 9 1 8 8 5.42 346.88 cft
3 St E-1 MH 3 9 1 8 8 6.42 410.88 cft
4 St E-1 MH 4 9 1 8 8 6.25 400 cft
5 St E-1 MH 5 9 1 8 8 5.5 352 cft
6 St E-1 MH 6 9 1 8 8 6.33 405.12 cft
Total 2261.76 cft
Street E-2
1 St E-2 MH 3 9 1 8 8 6.33 405.12 cft
2 St E-2 MH 4 9 1 8 8 5.42 346.88 cft

Qty=No*L*W*H
3 St E-2 MH 5 9 1 8 8 5.25 336 cft
4 St E-2 MH 6 9 1 8 8 5 320 cft
5 St E-2 MH 7 9 1 8 8 4.25 272 cft
Total 1680 cft

Details of Measurements & Calcuation of Quantities for the Excavation of Main Boulevard
Excavation for Trench
1 M.blvrd 32+50 MH 1 24 1 36 4 4.25 612 cft
2 M.blvrd 34+30 MH 2 24 1 171 4 4.25 2907 cft
3 M.blvrd 36+50 MH 3 24 1 197 4 4 3152 cft

*H
*W
4 M.blvrd 38+50 MH 4 24 1 194 4 4 3104 cft

L
o*
5 M.blvrd 38+50 MH 5 24 1 89 4 4 1424 cft

N
y=
6 M.blvrd 40+00 MH 6 24 1 139 4 4 2224 cft

Qt
7 M.blvrd 41+50 MH 7 24 1 146 4 4 2336 cft
Total 15759 cft
Excavation for Manhole
1 M.blvrd 32+50 MH 1 24 1 8 8 6.5 416 cft
2 M.blvrd 34+30 MH 2 24 1 8 8 5.5 352 cft
3 M.blvrd 36+50 MH 3 24 1 8 8 5.5 352 cft

*H
*W
4 M.blvrd 38+50 MH 4 24 1 8 8 5.33 341.12 cft

L
o*
5 M.blvrd 38+50 MH 5 24 1 8 8 5.33 341.12 cft

N
y=
6 M.blvrd 40+00 MH 6 24 1 8 8 5.33 341.12 cft

Qt
7 M.blvrd 41+50 MH 7 24 1 8 8 5.33 341.12 cft
Total 2484.48 cft
Main Boulevard C Sector
1 RD MH 7-MH 6 15 1 94 4 4 1504 cft
2 MH 6-MH 5 15 1 93 4 5 1860 cft
3 MH 5-MH 4 15 1 94 4 5 1880 cft
4 MH 4-MH 3 15 1 94.75 4 5 1895 cft
5 MH 3-MH 2 15 1 99 4 5 1980 cft

Qty=No*L*W*H
6 MH 2-MH 1 15 1 97 4 5 1940 cft
7 MH 1-CB5 15 1 148 4 5 2960 cft
8 CB5-MH 1 15 1 92 4 4.5 1656 cft
9 MH 1-CB4 15 1 122 4 4.083 1992.504 cft
10 CB4-MH 1 15 1 95 4 3.583 1361.54 cft
11 MH 1-CB3 15 1 120 4 4 1920 cft
12 CB3-MH 2 18 1 89 4 3 1068 cft
13 MH 2-MH 1 18 1 91 4 5.083 1850.212 cft
14 MH 1-CB2 18 1 126 4 3.42 1723.68 cft
Total 14019 cft
Main Boulevard Near B1
1 RD MH B1-MH 1 12 1 102 3 5 1530 cft

Qty=No*L*W*H
2 MH 1-MH 2 12 1 103 3 4 1236 cft
3 MH 2-MH 3 12 1 81 3 3.66 889.38 cft
4 MH 3-B2(Shahid) 12 1 128 3 4.5 1728 cft
Total 5383.38 cft
Main Boulevard
1 RD MHOld- MH(shahid 18 1 135 4 5 2700 cft

Qty=No*L*W*H
2 MH CA-MH 1 18 1 138.5 4 4.16 2304.64 cft
3 MH 1-MH 3 18 1 140 4 4.16 2329.6 cft
4 MH 3-MH 4 18 1 116 4 4.16 1930.24 cft
5 MH4-MHCA1(shahi 18 1 52 4 5.16 1073.28 cft
Total 10337.76 cft
Excavation for House Connection Pipe 6" Dia
Main Boulevard C Sector
1 RD MH 7 6 2 3 3 5.5 99 cft
2 MH 6 6 2 3 3 5.5 99 cft
3 MH 5 6 2 3 3 5.5 99 cft
4 MH 4 6 2 3 3 5.5 99 cft
5 MH 3 6 2 3 3 5.5 99 cft
6 MH 2 6 2 3 3 5.5 99 cft
7 MH 1 6 2 3 3 5.5 99 cft

*H
W
8 CB5 6 2 3 3 5.25 94.5 cft

L**
9 MH 1 6 2 3 3 6.66 119.88 cft

No
y=
10 CB4 6 2 3 3 6.5 117 cft

Qt
11 MH 1 6 2 3 3 6.083 109.494 cft
12 CB3 6 2 3 3 5.92 106.56 cft
13 MH 2 6 2 3 3 5.66 101.88 cft
14 MH 1 6 2 3 3 7.16 128.88 cft
15 CB2 6 2 3 3 5.083 91.494 cft
Total 1562.69 cft
Main Boulevard Near B1
1 RD MH B1 6 2 3 3 4.5 81 cft

*H
2 MH 1 6 2 3 3 3.33 59.94 cft

W
L*
3 MH 2 6 2 3 3 3 54 cft

*
No
4 MH 3 6 2 3 3 3.92 70.56 cft

y=
Qt
Total 265.5 cft
Main Boulevard
1 RD MHOld 6 2 3 3 3.5 63 cft

*H
L *W
o*
N
y=
Qt
2 MH CA 6 2 3 3 2.66 47.88 cft
3 MH 1 6 2 3 3 2.66 47.88 cft
4 MH 3 6 2 3 3 2.66 47.88 cft
5 MH4- 6 2 3 3 3.66 65.88 cft
Total 272.52 cft
Excavation for Manhole
Main Boulevard C Sector
1 RD MH 7 15 1 9 9 7 567 cft
2 MH 6 15 1 9 9 7 567 cft
3 MH 5 15 1 9 9 7 567 cft
4 MH 4 15 1 9 9 7 567 cft
5 MH 3 15 1 9 9 7 567 cft
6 MH 2 15 1 9 9 7 567 cft

Qty=No*L*W*H
7 MH 1 15 1 9 9 7 567 cft
8 CB5 15 1 9 9 6.75 546.75 cft
9 MH 1 15 1 9 9 8.16 660.96 cft
10 CB4 15 1 9 9 8 648 cft
11 MH 1 15 1 9 9 7.583 614.223 cft
12 CB3 18 1 10 10 7.42 742 cft
13 MH 2 18 1 10 10 7.16 716 cft
14 MH 1 18 1 10 10 8.66 866 cft
15 CB2 18 1 10 10 6.583 658.3 cft
Total 3969 cft
Main Boulevard Near B1

Qty=No*L*W*H
1 RD MH B1 12 1 8 8 6 384 cft
2 MH 1 12 1 8 8 4.83 309.12 cft
3 MH 2 12 1 8 8 4.5 288 cft
4 MH 3 12 1 8 8 5.42 346.88 cft
Total 1328 cft
Main Boulevard
1 RD MHOld 18 1 10 10 5 500 cft

Qty=No*L*W*H
2 MH CA 18 1 10 10 4.16 416 cft
3 MH 1 18 1 10 10 4.16 416 cft
Qty=No*L*W*H
4 MH 3 18 1 10 10 4.16 416 cft
5 MH4 18 1 10 10 5.16 516 cft
Total 2264 cft
Details of Measurements & Calculation of Quantities for the Crushed Stone of A Sector
StreetA-2
Pipe Quantity Crushed stone Including Pipe Crushed stone
Line Pipe Vol of
S.No Location From-To dia(inch) Area Length pipe Length Width Height Quantity Net Quantity Units Remarks
1 st A-2 MH Old-MH 1 9 0.442 136.5 30.137 136.5 4 1.02 556.92 526.783 cft

Net Qty=Qty-
2 st A-2 MH 1-MH 2 9 0.442 38.5 8.500 38.5 4 1.02 157.08 148.580 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 st A-2 MH 2-MH 3 9 0.442 32.5 7.175 32.5 4 1.02 132.6 125.425 cft

P.Vol
4 st A-2 MH 3-MH 4 9 0.442 106.5 23.513 106.5 4 1.02 434.52 411.007 cft
5 st A-2 MH 4-MH 5 9 0.442 94.5 20.864 94.5 4 1.02 385.56 364.696 cft
6 st A-2 MH 5-MH 6 9 0.442 96.5 21.305 96.5 4 1.02 393.72 372.415 cft
Total 1948.905 cft
StreetA-5
1 st A-5 MH N1-MH N2 9 0.442 49.5 10.929 49.5 4 1.02 201.96 191.031 cft

Net Qty=Qty-
P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
2 st A-5 MH N2-MH A4 9 0.442 37.5 8.279 37.5 4 1.02 153 144.721 cft
3 st A-5 MH A4-MH 1 9 0.442 103.5 22.851 103.5 4 1.02 422.28 399.429 cft

P.Vol
4 st A-5 MH 1-MH 2 9 0.442 93.5 20.643 93.5 4 1.02 381.48 360.837 cft
5 st A-5 MH 2-MH 3 9 0.442 95.5 21.085 95.5 4 1.02 389.64 368.555 cft
Total 1464.574 cft
StreetA-6
1 st A-6 MH Old-MH 1 9 0.442 54.5 12.033 54.5 4 1.02 222.36 210.327 cft

Net Qty=Qty-
P.Vol=(P.Area*L/2)
2 st A-6 MH 1-MH 2 9 0.442 97.5 21.526 97.5 4 1.02 397.8 376.274 cft

P.Area=3.14*d^2
3 st A-6 MH 2-MH 3 9 0.442 95.5 21.085 95.5 4 1.02 389.64 368.555 cft
4 st A-6 MH 3-MH 4 9 0.442 94 20.753 94 4 1.02 383.52 362.767 cft

P.Vol
Total 1317.923 cft
Street A-4
1 St A-4 MH 1-MH 2 9 0.442 79 17.442 79 3 0.83 196.71 179.268 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2

Qty=Qty-P.Vol
2 St A-4 MH 2-MH 3 9 0.442 80 17.663 80 3 0.83 199.2 181.538 cft

Net
3 St A-4 MH 3-MH 4 9 0.442 79 17.442 79 3 0.83 196.71 179.268 cft
4 St A-4 MH 4-MH 5 9 0.442 88 19.429 88 3 0.83 219.12 199.691 cft
5 St A-4 MH 5-MH A7.1 9 0.442 97 21.416 97 3 0.83 241.53 220.114 cft
Total 959.880 cft
Street A-7
1 St A-7 MH 3-MH 4 9 0.442 87 19.208 87 3 0.83 216.63 197.422 cft
2 St A-7 MH 4-MH 5 9 0.442 87 19.208 87 3 0.83 216.63 197.422 cft

Net Qty=Qty-P.Vol
3 St A-7 MH 5-MH 6 9 0.442 88 19.429 88 3 0.83 219.12 199.691 cft

P.Area=3.14*d^2
P.Vol=(P.Area*L/2)
4 St A-7 MH 6-MH 7 9 0.442 88 19.429 88 3 0.83 219.12 199.691 cft
5 St A-7 MH 7-MH 8 9 0.442 87 19.208 87 3 0.83 216.63 197.422 cft
6 St A-7 MH 8-MH 9 9 0.442 87 19.208 87 3 0.83 216.63 197.422 cft
7 St A-7 MH 9-MH 10 9 0.442 96.5 21.305 96.5 3 0.83 240.285 218.980 cft
8 St A-7 MH 10-MH A7.2 9 0.442 48 10.598 48 3 0.83 119.52 108.923 cft
Total 1516.973 cft
ROAD CROSSES Trench Crushed Stone
Street A-4
1 St A-4 MH 1 Cross 6 0.196 24.5 4.808 24.5 3 0.75 55.125 50.317 cft

Net Qty=Qty-
2 St A-4 MH 2 Cross 6 0.196 24.5 4.808 24.5 3 0.75 55.125 50.317 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 St A-4 MH 3 Cross 6 0.196 24.25 4.759 24.25 3 0.75 54.563 49.803 cft

P.Vol
4 St A-4 MH 4 Cross 6 0.196 24.75 4.857 24.75 3 0.75 55.688 50.830 cft
5 St A-4 MH 5 Cross 6 0.196 25 4.906 25 3 0.75 56.250 51.344 cft
6 St A-4 MH A-7.1 Cross 6 0.196 24.25 4.759 24.25 3 0.75 54.563 49.803 cft
Total 302.415 cft
Street A-5
1 St A-5 MH A-4 Cross 9 0.196 32 6.280 32 3 0.75 72 65.720 cft
2 St A-5 MH 1 Cross 9 0.196 25 4.906 25 3 0.75 56.25 51.344 cft same as
3 St A-5 MH 2 Cross 9 0.196 25 4.906 25 3 0.75 56.25 51.344 cft above
Total 168.408 cft
Street A-7
1 St A-7 MH 3 Cross 6 0.196 31 6.084 31 3 0.75 69.750 63.666 cft
2 St A-7 MH 4 Cross 6 0.196 25.92 5.087 25.92 3 0.75 58.320 53.233 cft
3 St A-7 MH 5 Cross 6 0.196 24.75 4.857 24.75 3 0.75 55.688 50.830 cft

Net Qty=Qty-P.Vol
P.Area=3.14*d^2
4 St A-7 MH 6 Cross 6 0.196 24.75 4.857 24.75 3 0.75 55.688 50.830 cft

P.Vol=(P.Area*L/2)
5 St A-7 MH 7 Cross 6 0.196 24.75 4.857 24.75 3 0.75 55.688 50.830 cft
6 St A-7 MH 8 Cross 6 0.196 24.25 4.759 24.25 3 0.75 54.563 49.803 cft
7 St A-7 MH 9 Cross 6 0.196 25 4.906 25 3 0.75 56.250 51.344 cft
8 St A-7 MH 10 Cross 6 0.196 25 4.906 25 3 0.75 56.250 51.344 cft
P.Vol=(P.Area*L/
Net Qty=Q
P.Area=3.1
9 St A-7 MH A7.2 Cross 6 0.196 24.83 4.873 24.83 3 0.75 55.868 50.995 cft
Total 472.876 cft

Details of Measurements & Calculation of Quantities for the Crushed Stone of B Sector
Trench Crushed stone
Street B1&B2
1 st B1& B2 MH Old-MH 1 9 0.442 98.5 21.747 98.5 4 1.02 401.88 380.133 cft

Net Qty=Qty-P.Vol
2 st B1& B2 MH 1-MH 2 9 0.442 90.5 19.981 90.5 4 1.02 369.24 349.259 cft

P.Area=3.14*d^2
3 st B1& B2 MH 2-MH 3 9 0.442 100.5 22.189 100.5 4 1.02 410.04 387.851 cft

P.Vol=(P.Area*L/2)
4 st B1& B2 MH 3-MH 4 9 0.442 95.5 21.085 95.5 4 1.02 389.64 368.555 cft
5 st B1& B2 MH 4-MH 5 9 0.442 96 21.195 96 4 1.02 391.68 370.485 cft
6 st B1& B2 MH 5-MH 6 9 0.442 94.5 20.864 94.5 4 1.02 385.56 364.696 cft
7 st B1& B2 MH 6-MH 7 9 0.442 95.5 21.085 95.5 4 1.02 389.64 368.555 cft
Total 2589.536 cft
ROAD CROSSES Trench Crushed Stone
Street B1& B2
1 St B1& B2 MH 1 Cross 9 0.442 25 11.039 25 3 0.75 56.250 45.211 cft

Net Qty=Qty-
2 St B1& B3 MH 2 Cross 9 0.442 25 11.039 25 3 0.75 56.250 45.211 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 St B1& B4 MH 3 Cross 9 0.442 25 11.039 25 3 0.75 56.250 45.211 cft

P.Vol
4 St B1& B5 MH 4 Cross 9 0.442 25 11.039 25 3 0.75 56.250 45.211 cft
5 St B1& B6 MH 5 Cross 9 0.442 25 11.039 25 3 0.75 56.250 45.211 cft
6 St B1& B7 MH 6 Cross 9 0.442 25 11.039 25 3 0.75 56.250 45.211 cft
Total 271.266 cft

Details of Measurements & Calculation of Quantities for the Crushed Stone of C Sector
Trench Crushed stone
Street C-7
1 st C-7 MH C9-6-MH 1 9 0.442 34.5 7.617 34.5 4 1.02 140.76 133.143 cft

Net Qty=Qty-
2 st C-7 MH 1-MH 2 9 0.442 88.5 19.539 88.5 4 1.02 361.08 341.541 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 st C-7 MH 2-MH 3 9 0.442 91.5 20.201 91.5 4 1.02 373.32 353.119 cft

P.Vol
4 st C-7 MH 3-MH 4 9 0.442 95.5 21.085 95.5 4 1.02 389.64 368.555 cft
5 st C-7 MH 4-MH 5 9 0.442 95.5 21.085 95.5 4 1.02 389.64 368.555 cft
6 st C-7 MH 5-MH 6 9 0.442 96.5 21.305 96.5 4 1.02 393.72 372.415 cft
P.Vol=(P.Area*
P.Area=3.14*

Net Qt
P.Vol
Total 1937.328 cft
Street C-8
1 st C-8 MH C9-2-MH 1 9 0.442 67.5 14.903 67.5 4 1.02 275.4 260.497 cft
2 st C-8 MH 1-MH 2 9 0.442 95.5 21.085 95.5 4 1.02 389.64 368.555 cft
3 st C-8 MH 2-MH 3 9 0.442 90.5 19.981 90.5 4 1.02 369.24 349.259 cft

Net Qty=Qty-P.Vol
P.Area=3.14*d^2
4 st C-8 MH 3-MH 4 9 0.442 95.5 21.085 95.5 4 1.02 389.64 368.555 cft

P.Vol=(P.Area*L/2)
5 st C-8 MH 4-MH 5 9 0.442 93.5 20.643 93.5 4 1.02 381.48 360.837 cft
6 st C-8 MH 5-MH 6 9 0.442 96.5 21.305 96.5 4 1.02 393.72 372.415 cft
7 st C-8 MH 6-MH 7 9 0.442 95.5 21.085 95.5 4 1.02 389.64 368.555 cft
8 st C-8 MH 7-MH 8 9 0.442 33.5 7.396 33.5 4 1.02 136.68 129.284 cft
9 st C-8 MH 8-MH 9 9 0.442 55 12.143 55 4 1.02 224.4 212.257 cft
Total 2790.215 cft
Street C-9
1 st C-9 MH MR-MH 1 9 0.442 102.5 22.630 102.5 4 1.02 418.2 395.570 cft

Net Qty=Qty-P.Vol
2 st C-9 MH 1-MH 2 9 0.442 91.5 20.201 91.5 4 1.02 373.32 353.119 cft

P.Area=3.14*d^2
3 st C-9 MH 2-MH 3 9 0.442 57.5 12.695 57.5 4 1.02 234.6 221.905 cft

P.Vol=(P.Area*L/2)
4 st C-9 MH 3-MH 4 9 0.442 45.5 10.046 45.5 4 1.02 185.64 175.594 cft
5 st C-9 MH 4-MH 5 9 0.442 50.5 11.149 50.5 4 1.02 206.04 194.891 cft
6 st C-9 MH 5-MH 6 9 0.442 49.5 10.929 49.5 4 1.02 201.96 191.031 cft
7 st C-9 MH 6-MH 7 9 0.442 102 22.520 102 4 1.02 416.16 393.640 cft
Total 1925.750 cft
Street C-6
1 st C-6 MH Old-MH 1 9 0.442 37 8.169 37 4 1 148 139.831 cft

Net Qty=Qty-P.Vol
2 st C-6 MH 1-MH 2 9 0.442 33 7.286 33 4 1 132 124.714 cft

P.Area=3.14*d^2
3 st C-6 MH 2-MH 3 9 0.442 96 21.195 96 4 1 384 362.805 cft

P.Vol=(P.Area*L/2)
4 st C-6 MH 3-MH 4 9 0.442 91 20.091 91 4 1 364 343.909 cft
5 st C-6 MH 4-MH 5 9 0.442 33 7.286 33 4 1 132 124.714 cft
6 st C-6 MH 5-MH 6 9 0.442 27 5.961 27 4 1 108 102.039 cft
7 st C-6 MH 6-MH 7 9 0.442 36 7.948 36 4 1 144 136.052 cft
Total 1334.064 cft
Street C-10
1 St C-10 CB3-MH 1 9 0.442 112 24.728 112 3 0.83 278.88 254.153 cft

Net Qty=Qty-
2 St C-10 MH 1-MH 2 9 0.442 100 22.078 100 3 0.83 249 226.922 cft

ol=(P.Area*L/2)
.Area=3.14*d^2

P.Vol
Net Qty=Qty-
P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 St C-10 MH 2-MH 3 9 0.442 54.5 12.033 54.5 3 0.83 135.705 123.672 cft

P.Vol
4 St C-10 MH 3-MH 4 9 0.442 55 12.143 55 3 0.83 136.95 124.807 cft
5 St C-10 MH 4-MH 5 9 0.442 51 11.260 51 3 0.83 126.99 115.730 cft
6 St C-10 MH 5-CB3.1 9 0.442 47 10.377 47 3 0.83 117.03 106.653 cft
Total 951.937 cft
Road-15
1 Road-15 MH 1-MH 2 9 0.442 47.5 10.487 47.5 4 0.83 157.7 147.213 cft
2 Road-15 MH 2-MH 3 9 0.442 47.5 10.487 47.5 4 0.83 157.7 147.213 cft

Net Qty=Qty-P.Vol
3 Road-15 MH 3-MH 4 9 0.442 52.5 11.591 52.5 4 0.83 174.3 162.709 cft

P.Area=3.14*d^2
P.Vol=(P.Area*L/2)
4 Road-15 MH 4-MH 5 9 0.442 52.5 11.591 52.5 4 0.83 174.3 162.709 cft
5 Road-15 MH 5-MH 6 9 0.442 52.5 11.591 52.5 4 0.83 174.3 162.709 cft
6 Road-15 MH 6-MH 7 9 0.442 53.5 11.812 53.5 4 0.83 177.62 165.808 cft
7 Road-15 MH 7-MH 8 9 0.442 96.5 21.305 96.5 4 0.83 320.38 299.075 cft
8 Road-15 MH 8-MH-MR 9 0.442 108.5 23.955 108.5 4 0.83 360.22 336.265 cft
Total 1583.701 cft
ROAD CROSSES Trench Crushed Stone
Street C-8
1 St C-8 MH 1 Cross 9 0.442 40 17.663 40 3 0.75 90 72.338 cft

Net Qty=Qty-P.Vol
2 St C-8 MH 2 Cross 9 0.442 26 11.481 26 3 0.75 58.5 47.019 cft
3 St C-8 MH 3 Cross 9 0.442 25 11.039 25 3 0.75 56.25 45.211 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
4 St C-8 MH 4 Cross 9 0.442 25 11.039 25 3 0.75 56.25 45.211 cft
5 St C-8 MH 5 Cross 9 0.442 25 11.039 25 3 0.75 56.25 45.211 cft
6 St C-8 MH 6 Cross 9 0.442 25 11.039 25 3 0.75 56.25 45.211 cft
7 St C-8 MH 7 Cross 9 0.442 26 11.481 26 3 0.75 58.5 47.019 cft
Total 347.220 cft

Details of Measurements & Calculation of Quantities for the Crushed Stone of E Sector
Trench Crushed stone
Street E-1
1 St E-1 MH 1-MH 2 9 0.442 96 21.195 96 4 0.83 318.72 297.525 cft

Net Qty=Qty-
P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
2 St E-1 MH 2-MH 3 9 0.442 97 21.416 97 4 0.83 322.04 300.624 cft
3 St E-1 MH 3-MH 4 9 0.442 96.5 21.305 96.5 4 0.83 320.38 299.075 cft

P.Vol
4 St E-1 MH 4-MH 5 9 0.442 96.25 21.250 96.25 4 0.83 319.55 298.300 cft
Net Qty=Qty
P.Vol=(P.Area*L/2)
P.Area=3.14*d^2

P.Vol
5 St E-1 MH 5-MH 6 9 0.442 95.5 21.085 95.5 4 0.83 317.06 295.975 cft
Total 1491.499 cft
Street E-2
1 St E-2 MH 3-MH 4 9 0.442 96.5 21.305 96.5 4 0.83 320.38 299.075 cft

Net Qty=Qty-
P.Vol=(P.Area*L/2)
2 St E-2 MH 4-MH 5 9 0.442 96.5 21.305 96.5 4 0.83 320.38 299.075 cft

P.Area=3.14*d^2
3 St E-2 MH 5-MH 6 9 0.442 97.5 21.526 97.5 4 0.83 323.7 302.174 cft
4 St E-2 MH 6-MH 7 9 0.442 96.5 21.305 96.5 4 0.83 320.38 299.075 cft

P.Vol
Total 1199.398 cft

Details of Measurements & Calculation of Quantities for the Crushed Stone of Main Boulevard
Trench Crushed stone
Main Boulevard C sector
1 RD MH 7-MH 6 15 1.227 97 59.488 97 4 1.16 450.08 390.592 cft
2 MH 6-MH 5 15 1.227 96 58.875 96 4 1.16 445.44 386.565 cft

P.Area=3.14*d^2 P.Vol=(P.Area*L/2)
3 MH 5-MH 4 15 1.227 97 59.488 97 4 1.16 450.08 390.592 cft
4 MH 4-MH 3 15 1.227 97.75 59.948 97.75 4 1.16 453.56 393.612 cft

Net Qty=Qty-P.Vol
5 MH 3-MH 2 15 1.227 102 62.555 102 4 1.16 473.28 410.725 cft
6 MH 2-MH 1 15 1.227 100 61.328 100 4 1.16 464 402.672 cft
7 MH 1-CB5 15 1.227 151 92.605 151 4 1.16 700.64 608.035 cft
8 CB5-MH 1 15 1.227 95 58.262 95 4 1.16 440.8 382.538 cft
9 MH 1-CB4 15 1.227 125 76.660 125 4 1.16 580 503.340 cft
10 CB4-MH 1 15 1.227 98 60.102 98 4 1.16 454.72 394.618 cft
11 MH 1-CB3 15 1.227 123 75.434 123 4 1.16 570.72 495.286 cft
12 CB3-MH 2 18 1.766 92 81.248 92 4 1.25 460 378.753 cft
13 MH 2-MH 1 18 1.766 94 83.014 94 4 1.25 470 386.986 cft
14 MH 1-CB2 18 1.766 129 113.923 129 4 1.25 645 531.077 cft
Total 6055.391 cft
Main Boulevard Near B1
1 RD MH B1-MH 1 12 0.785 106 41.605 106 3 1 318 276.395 cft

Net Qty=Qty-
P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
2 MH 1-MH 2 12 0.785 107 41.998 107 3 1 321 279.003 cft

P.Vol
3 MH 2-MH 3 12 0.785 85 33.363 85 3 1 255 221.638 cft
4 MH 3-B2(Shahid) 12 0.785 132 51.810 132 3 1 396 344.190 cft
Total 1121.225 cft
Main Boulevard
1 RD MHOld- MH(shahid) 18 1.766 137 120.988 137 4 1.25 685 564.012 cft

Net Qty=Qty-P.Vol
2 MH CA-MH 1 18 1.766 142.5 125.845 142.5 4 1.25 712.5 586.655 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 MH 1-MH 3 18 1.766 144 127.170 144 4 1.25 720 592.830 cft
4 MH 3-MH 4 18 1.766 120 105.975 120 4 1.25 600 494.025 cft
5 MH4-MHCA1(shahid) 18 1.766 56 49.455 56 4 1.25 280 230.545 cft
Total 2468.067 cft
Main Boulevard
1 32+50 ST.PT-MH 1 24 3.14 40 62.8 36 4 1.75 252 189.2 cft
2 34+30 MH 1-MH 2 24 3.14 173 271.61 173 4 1.75 1211 939.39 cft

Net Qty=Qty-P.Vol
P.Area=3.14*d^2
P.Vol=(P.Area*L/2)
3 36+50 MH 2-MH 3 24 3.14 199 312.43 199 4 1.75 1393 1080.57 cft
4 38+50 MH 3-MH 4 24 3.14 196 307.72 196 4 1.75 1372 1064.28 cft
5 38+50 MH 4-MH 5 24 3.14 91 142.87 91 4 1.75 637 494.13 cft
6 40+00 MH 5-MH 6 24 3.14 141 221.37 141 4 1.75 987 765.63 cft
7 41+50 MH 6-MH 7 24 3.14 149 233.93 146 4 1.75 1022 788.07 cft
Total 5321.27 cft
Details of Measurements & Calculation of Quantities for the Sand Cushion of A Sector
Trench Sand Cushion
StreetA-2
Pipe Quantity Sand Cushion Including Pipe Sand Cushion
Line Pipe Vol of
S.No Location From-To dia(inch) Area Length pipe Length Width Height Quantity Net Quantity Units Remarks
1 st A-2 MH Old-MH 1 9 0.442 136.5 30.137 136.5 4 1.52 829.92 799.783 cft

Net Qty=Qty-
2 st A-2 MH 1-MH 2 9 0.442 38.5 8.500 38.5 4 1.52 234.08 225.580 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 st A-2 MH 2-MH 3 9 0.442 32.5 7.175 32.5 4 1.52 197.6 190.425 cft

P.Vol
4 st A-2 MH 3-MH 4 9 0.442 106.5 23.513 106.5 4 1.52 647.52 624.007 cft
5 st A-2 MH 4-MH 5 9 0.442 94.5 20.864 94.5 4 1.52 574.56 553.696 cft
6 st A-2 MH 5-MH 6 9 0.442 96.5 21.305 96.5 4 1.52 586.72 565.415 cft
Total 2958.905 cft
StreetA-5
1 st A-5 MH N-MH N2 9 0.442 49.5 10.929 49.5 4 1.52 300.96 290.031 cft

P.Vol=(P.Area*L/2)
2 st A-5 MH N2-MH A4 9 0.442 37.5 8.279 37.5 4 1.52 228 219.721 cft

P.Area=3.14*d^2
Net
Qty=Qty-P.Vol
3 st A-5 MH A4-MH 1 9 0.442 103.5 22.851 103.5 4 1.52 629.28 606.429 cft
4 st A-5 MH 1-MH 2 9 0.442 93.5 20.643 93.5 4 1.52 568.48 547.837 cft
5 st A-5 MH 2-MH 3 9 0.442 95.5 21.085 95.5 4 1.52 580.64 559.555 cft
Total 2223.574 cft
StreetA-6
1 stA-6 MH Old-MH 1 9 0.442 54.5 12.033 54.5 4 1.52 331.36 319.327 cft

P.Vol=(P.Area*L/2)
2 stA-6 MH 1-MH 2 9 0.442 97.5 21.526 97.5 4 1.52 592.8 571.274 cft

P.Area=3.14*d^2

Net
Qty=Qty-P.Vol
3 stA-6 MH 2-MH 3 9 0.442 95.5 21.085 95.5 4 1.52 580.64 559.555 cft
4 stA-6 MH 3-MH 4 9 0.442 94 20.753 94 4 1.52 571.52 550.767 cft
Total 2000.923 cft
Street A-4
1 St A-4 MH 1-MH 2 9 0.442 79 17.442 79 3 1.583 375.171 357.729 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2

Qty=Qty-P.Vol
2 St A-4 MH 2-MH 3 9 0.442 80 17.663 80 3 1.583 379.92 362.258 cft

Net
3 St A-4 MH 3-MH 4 9 0.442 79 17.442 79 3 1.583 375.171 357.729 cft
4 St A-4 MH 4-MH 5 9 0.442 88 19.429 88 3 1.583 417.912 398.483 cft
5 St A-4 MH 5-MH A7.1 9 0.442 97 21.416 97 3 1.583 460.653 439.237 cft
P.Area=3.14*d^
Ne
P.Vol=(P.Area*L

Qty=Qty-P.V
Total 1915.437 cft
Street A-7
1 St A-7 MH 3-MH 4 9 0.442 87 19.208 87 3 1.583 413.163 393.955 cft
2 St A-7 MH 4-MH 5 9 0.442 87 19.208 87 3 1.583 413.163 393.955 cft

Net Qty=Qty-P.Vol
3 St A-7 MH 5-MH 6 9 0.442 88 19.429 88 3 1.583 417.912 398.483 cft

P.Area=3.14*d^2
P.Vol=(P.Area*L/2)
4 St A-7 MH 6-MH 7 9 0.442 88 19.429 88 3 1.583 417.912 398.483 cft
5 St A-7 MH 7-MH 8 9 0.442 87 19.208 87 3 1.583 413.163 393.955 cft
6 St A-7 MH 8-MH 9 9 0.442 87 19.208 87 3 1.583 413.163 393.955 cft
7 St A-7 MH 9-MH 10 9 0.442 96.5 21.305 96.5 3 1.583 458.2785 436.973 cft
8 St A-7 MH 10-MH A7.2 9 0.442 48 10.598 48 3 1.583 227.952 217.355 cft
Total 3027.114 cft
ROAD CROSSES Trench Sand Cushion
Street A-4
1 St A-4 MH 1 Cross 6 0.196 24.5 4.808 24.5 3 1.5 110.250 105.442 cft

Net Qty=Qty-
2 St A-4 MH 2 Cross 6 0.196 24.5 4.808 24.5 3 1.5 110.250 105.442 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 St A-4 MH 3 Cross 6 0.196 24.25 4.759 24.25 3 1.5 109.125 104.366 cft

P.Vol
4 St A-4 MH 4 Cross 6 0.196 24.75 4.857 24.75 3 1.5 111.375 106.518 cft
5 St A-4 MH 5 Cross 6 0.196 25 4.906 25 3 1.5 112.500 107.594 cft
6 St A-4 MH A-7.1 Cross 6 0.196 24.25 4.759 24.25 3 1.5 109.125 104.366 cft
Total 633.727 cft
Street A-5
1 St A-5 MH A-4 Cross 9 0.196 32 6.280 32 3 1.583 151.968 145.688 cft
2 St A-5 MH 1 Cross 9 0.196 25 4.906 25 3 1.583 118.725 113.819 cft same as
3 St A-5 MH 2 Cross 9 0.196 25 4.906 25 3 1.583 118.725 113.819 cft above
Total 373.326 cft
Street A-7
1 St A-7 MH 3 Cross 6 0.196 31 6.084 31 3 1.5 139.500 133.416 cft
2 St A-7 MH 4 Cross 6 0.196 25.92 5.087 25.92 3 1.5 116.640 111.553 cft
3 St A-7 MH 5 Cross 6 0.196 24.75 4.857 24.75 3 1.5 111.375 106.518 cft

Net Qty=Qty-P.Vol
P.Area=3.14*d^2
4 St A-7 MH 6 Cross 6 0.196 24.75 4.857 24.75 3 1.5 111.375 106.518 cft

P.Vol=(P.Area*L/2)
5 St A-7 MH 7 Cross 6 0.196 24.75 4.857 24.75 3 1.5 111.375 106.518 cft
6 St A-7 MH 8 Cross 6 0.196 24.25 4.759 24.25 3 1.5 109.125 104.366 cft
7 St A-7 MH 9 Cross 6 0.196 25 4.906 25 3 1.5 112.500 107.594 cft
P.Area=3.14*d

Net Qty=Qty-
P.Vol=(P.Area*L/2)
8 St A-7 MH 10 Cross 6 0.196 25 4.906 25 3 1.5 112.500 107.594 cft
9 St A-7 MH A7.2 Cross 6 0.196 24.83 4.873 24.83 3 1.5 111.735 106.862 cft
Total 990.938 cft

Details of Measurements & Calculation of Quantities for the Sand Cushion of B Sector
Trench Sand Cushion
Street B1&B2
1 st B1& B2 MH Old-MH 1 9 0.442 98.5 21.747 98.5 4 1.52 598.88 577.133 cft

Net Qty=Qty-
2 st B1& B2 MH 1-MH 2 9 0.442 90.5 19.981 90.5 4 1.52 550.24 530.259 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 st B1& B2 MH 2-MH 3 9 0.442 100.5 22.189 100.5 4 1.52 611.04 588.851 cft

P.Vol
4 st B1& B2 MH 3-MH 4 9 0.442 95.5 21.085 95.5 4 1.52 580.64 559.555 cft
5 st B1& B2 MH 4-MH 5 9 0.442 96 21.195 96 4 1.52 583.68 562.485 cft
6 st B1& B2 MH 5-MH 6 9 0.442 94.5 20.864 94.5 4 1.52 574.56 553.696 cft
7 st B1& B2 MH 6-MH 7 9 0.442 95.5 21.085 95.5 4 1.52 580.64 559.555 cft
ROAD CROSSES Trench Sand Cushion
Street B1& B2
1 St B1& B2 MH 1 Cross 9 0.442 25 11.039 25 3 1.583 118.725 107.686 cft

Net Qty=Qty-
2 St B1& B3 MH 2 Cross 9 0.442 25 11.039 25 3 1.583 118.725 107.686 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 St B1& B4 MH 3 Cross 9 0.442 25 11.039 25 3 1.583 118.725 107.686 cft

P.Vol
4 St B1& B5 MH 4 Cross 9 0.442 25 11.039 25 3 1.583 118.725 107.686 cft
5 St B1& B6 MH 5 Cross 9 0.442 25 11.039 25 3 1.583 118.725 107.686 cft
6 St B1& B7 MH 6 Cross 9 0.442 25 11.039 25 3 1.583 118.725 107.686 cft
Total 646.116 cft

Details of Measurements & Calculation of Quantities for the Sand Cushion of C Sector
Trench Sand Cushion
Street C-7
1 st C-7 MH C9-6-MH 1 9 0.442 34.5 7.617 34.5 4 1.52 209.76 202.143 cft

Net Qty=Qty-
2 st C-7 MH 1-MH 2 9 0.442 88.5 19.539 88.5 4 1.52 538.08 518.541 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 st C-7 MH 2-MH 3 9 0.442 91.5 20.201 91.5 4 1.52 556.32 536.119 cft

P.Vol
4 st C-7 MH 3-MH 4 9 0.442 95.5 21.085 95.5 4 1.52 580.64 559.555 cft
5 st C-7 MH 4-MH 5 9 0.442 95.5 21.085 95.5 4 1.52 580.64 559.555 cft
6 st C-7 MH 5-MH 6 9 0.442 96.5 21.305 96.5 4 1.52 586.72 565.415 cft
P.Vol=(P.Area*
P.Area=3.14*

Net Q
P.Vol
Total 2941.328 cft
Street C-8
1 st C-8 MH C9-2-MH 1 9 0.442 67.5 14.903 67.5 4 1.52 410.4 395.497 cft
2 st C-8 MH 1-MH 2 9 0.442 95.5 21.085 95.5 4 1.52 580.64 559.555 cft
3 st C-8 MH 2-MH 3 9 0.442 90.5 19.981 90.5 4 1.52 550.24 530.259 cft

Net Qty=Qty-P.Vol
P.Area=3.14*d^2
4 st C-8 MH 3-MH 4 9 0.442 95.5 21.085 95.5 4 1.52 580.64 559.555 cft

P.Vol=(P.Area*L/2)
5 st C-8 MH 4-MH 5 9 0.442 93.5 20.643 93.5 4 1.52 568.48 547.837 cft
6 st C-8 MH 5-MH 6 9 0.442 96.5 21.305 96.5 4 1.52 586.72 565.415 cft
7 st C-8 MH 6-MH 7 9 0.442 95.5 21.085 95.5 4 1.52 580.64 559.555 cft
8 st C-8 MH 7-MH 8 9 0.442 33.5 7.396 33.5 4 1.52 203.68 196.284 cft
9 st C-8 MH 8-MH 9 9 0.442 55 12.143 55 4 1.52 334.4 322.257 cft
Total 4236.215 cft
Street C-9
1 st C-9 MH MR-MH 1 9 0.442 102.5 22.630 102.5 4 1.52 623.2 600.570 cft

Net Qty=Qty-P.Vol
2 st C-9 MH 1-MH 2 9 0.442 91.5 20.201 91.5 4 1.52 556.32 536.119 cft

P.Area=3.14*d^2
3 st C-9 MH 2-MH 3 9 0.442 57.5 12.695 57.5 4 1.52 349.6 336.905 cft

P.Vol=(P.Area*L/2)
4 st C-9 MH 3-MH 4 9 0.442 45.5 10.046 45.5 4 1.52 276.64 266.594 cft
5 st C-9 MH 4-MH 5 9 0.442 50.5 11.149 50.5 4 1.52 307.04 295.891 cft
6 st C-9 MH 5-MH 6 9 0.442 49.5 10.929 49.5 4 1.52 300.96 290.031 cft
7 st C-9 MH 6-MH 7 9 0.442 102 22.520 102 4 1.52 620.16 597.640 cft
Total 2923.750 cft
Street C-6
1 st C-6 MH Old-MH 1 9 0.442 37 8.169 37 4 1.33 196.84 188.671 cft

Net Qty=Qty-P.Vol
2 st C-6 MH 1-MH 2 9 0.442 33 7.286 33 4 1.33 175.56 168.274 cft

P.Area=3.14*d^2
3 st C-6 MH 2-MH 3 9 0.442 96 21.195 96 4 1.33 510.72 489.525 cft

P.Vol=(P.Area*L/2)
4 st C-6 MH 3-MH 4 9 0.442 91 20.091 91 4 1.33 484.12 464.029 cft
5 st C-6 MH 4-MH 5 9 0.442 33 7.286 33 4 1.33 175.56 168.274 cft
6 st C-6 MH 5-MH 6 9 0.442 27 5.961 27 4 1.33 143.64 137.679 cft
7 st C-6 MH 6-MH 7 9 0.442 36 7.948 36 4 1.33 191.52 183.572 cft
Total 1800.024 cft
Street C-10
1 St C-10 CB3-MH 1 9 0.442 112 24.728 112 3 1.583 531.888 507.161 cft

Net Qty=Qty-
2 St C-10 MH 1-MH 2 9 0.442 100 22.078 100 3 1.583 474.9 452.822 cft

ol=(P.Area*L/2)
.Area=3.14*d^2

P.Vol
Net Qty=Qty-
P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 St C-10 MH 2-MH 3 9 0.442 54.5 12.033 54.5 3 1.583 258.8205 246.788 cft

P.Vol
4 St C-10 MH 3-MH 4 9 0.442 55 12.143 55 3 1.583 261.195 249.052 cft
5 St C-10 MH 4-MH 5 9 0.442 51 11.260 51 3 1.583 242.199 230.939 cft
6 St C-10 MH 5-CB3.1 9 0.442 47 10.377 47 3 1.583 223.203 212.826 cft
Total 1899.588 cft
Road-15
1 Road-15 MH 1-MH 2 9 0.442 47.5 10.487 47.5 4 1.583 300.77 290.283 cft
2 Road-15 MH 2-MH 3 9 0.442 47.5 10.487 47.5 4 1.583 300.77 290.283 cft

Net Qty=Qty-P.Vol
3 Road-15 MH 3-MH 4 9 0.442 52.5 11.591 52.5 4 1.583 332.43 320.839 cft

P.Area=3.14*d^2
P.Vol=(P.Area*L/2)
4 Road-15 MH 4-MH 5 9 0.442 52.5 11.591 52.5 4 1.583 332.43 320.839 cft
5 Road-15 MH 5-MH 6 9 0.442 52.5 11.591 52.5 4 1.583 332.43 320.839 cft
6 Road-15 MH 6-MH 7 9 0.442 53.5 11.812 53.5 4 1.583 338.762 326.950 cft
7 Road-15 MH 7-MH 8 9 0.442 96.5 21.305 96.5 4 1.583 611.038 589.733 cft
8 Road-15 MH 8-MH-MR 9 0.442 108.5 23.955 108.5 4 1.583 687.022 663.067 cft
Total 3122.833 cft
ROAD CROSSES Trench Sand Cushion
Street C-8
1 St C-8 MH 1 Cross 9 0.442 40 17.663 40 3 1.583 189.96 172.298 cft

Net Qty=Qty-P.Vol
2 St C-8 MH 2 Cross 9 0.442 26 11.481 26 3 1.583 123.474 111.993 cft
3 St C-8 MH 3 Cross 9 0.442 25 11.039 25 3 1.583 118.725 107.686 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
4 St C-8 MH 4 Cross 9 0.442 25 11.039 25 3 1.583 118.725 107.686 cft
5 St C-8 MH 5 Cross 9 0.442 25 11.039 25 3 1.583 118.725 107.686 cft
6 St C-8 MH 6 Cross 9 0.442 25 11.039 25 3 1.583 118.725 107.686 cft
7 St C-8 MH 7 Cross 9 0.442 26 11.481 26 3 1.583 123.474 111.993 cft
Total 827.028 cft

Details of Measurements & Calculation of Quantities for the Sand Cushion of E Sector
Trench Sand Cushion
Street E-1
1 St E-1 MH 1-MH 2 9 0.442 96 21.195 96 4 1.583 607.872 586.677 cft

Net Qty=Qty-
P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
2 St E-1 MH 2-MH 3 9 0.442 97 21.416 97 4 1.583 614.204 592.788 cft
3 St E-1 MH 3-MH 4 9 0.442 96.5 21.305 96.5 4 1.583 611.038 589.733 cft

P.Vol
4 St E-1 MH 4-MH 5 9 0.442 96.25 21.250 96.25 4 1.583 609.455 588.205 cft
Net Qty=Qty
P.Vol=(P.Area*L/2)
P.Area=3.14*d^2

P.Vol
5 St E-1 MH 5-MH 6 9 0.442 95.5 21.085 95.5 4 1.583 604.706 583.621 cft
Total 2941.024 cft
Street E-2
1 St E-2 MH 3-MH 4 9 0.442 96.5 21.305 96.5 4 1.583 611.038 589.733 cft

Net Qty=Qty-
P.Vol=(P.Area*L/2)
2 St E-2 MH 4-MH 5 9 0.442 96.5 21.305 96.5 4 1.583 611.038 589.733 cft

P.Area=3.14*d^2
3 St E-2 MH 5-MH 6 9 0.442 97.5 21.526 97.5 4 1.583 617.37 595.844 cft
4 St E-2 MH 6-MH 7 9 0.442 96.5 21.305 96.5 4 1.583 611.038 589.733 cft

P.Vol
Total 2365.042 cft

Details of Measurements & Calculation of Quantities for the Sand Cushion of Main Boulevard
Trench Sand Cushion
Main Boulevard C sector
1 RD MH 7-MH 6 15 1.227 97 59.488 97 4 1.75 679 619.512 cft
2 MH 6-MH 5 15 1.227 96 58.875 96 4 1.75 672 613.125 cft

P.Area=3.14*d^2 P.Vol=(P.Area*L/2)
3 MH 5-MH 4 15 1.227 97 59.488 97 4 1.75 679 619.512 cft
4 MH 4-MH 3 15 1.227 97.75 59.948 97.75 4 1.75 684.25 624.302 cft

Net Qty=Qty-P.Vol
5 MH 3-MH 2 15 1.227 102 62.555 102 4 1.75 714 651.445 cft
6 MH 2-MH 1 15 1.227 100 61.328 100 4 1.75 700 638.672 cft
7 MH 1-CB5 15 1.227 151 92.605 151 4 1.75 1057 964.395 cft
8 CB5-MH 1 15 1.227 95 58.262 95 4 1.75 665 606.738 cft
9 MH 1-CB4 15 1.227 125 76.660 125 4 1.75 875 798.340 cft
10 CB4-MH 1 15 1.227 98 60.102 98 4 1.75 686 625.898 cft
11 MH 1-CB3 15 1.227 123 75.434 123 4 1.75 861 785.566 cft
12 CB3-MH 2 18 1.766 92 81.248 92 4 2 736 654.753 cft
13 MH 2-MH 1 18 1.766 94 83.014 94 4 2 752 668.986 cft
14 MH 1-CB2 18 1.766 129 113.923 129 4 2 1032 918.077 cft
Total 9789.321 cft
Main Boulevard Near B1
1 RD MH B1-MH 1 12 0.785 106 41.605 106 3 1.66 527.88 486.275 cft

Net Qty=Qty-
P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
2 MH 1-MH 2 12 0.785 107 41.998 107 3 1.66 532.86 490.863 cft

P.Vol
3 MH 2-MH 3 12 0.785 85 33.363 85 3 1.66 423.3 389.938 cft
4 MH 3-B2(Shahid) 12 0.785 132 51.810 132 3 1.66 657.36 605.550 cft
Total 1972.625 cft
Main Boulevard
1 RD MHOld- MH(shah 18 1.766 137 120.988 137 4 2 1096 975.012 cft

Net Qty=Qty-P.Vol
2 MH CA-MH 1 18 1.766 142.5 125.845 142.5 4 2 1140 1014.155 cft

P.Vol=(P.Area*L/2)
P.Area=3.14*d^2
3 MH 1-MH 3 18 1.766 144 127.170 144 4 2 1152 1024.830 cft
4 MH 3-MH 4 18 1.766 120 105.975 120 4 2 960 854.025 cft
5 MH4-MHCA1(sha 18 1.766 56 49.455 56 4 2 448 398.545 cft
Total 4266.567 cft
Main Boulevard
1 32+50 St Pt-MH 1 24 3.14 40 62.8 36 4 2.25 324 261.2 cft
2 34+30 MH 1-MH 2 24 3.14 173 271.61 173 4 2.25 1557 1285.39 cft

Net Qty=Qty-P.Vol
P.Area=3.14*d^2
P.Vol=(P.Area*L/2)
3 36+50 MH 2-MH 3 24 3.14 199 312.43 199 4 2.25 1791 1478.57 cft
4 38+50 MH 3-MH 4 24 3.14 196 307.72 196 4 2.25 1764 1456.28 cft
5 38+50 MH 4-MH 5 24 3.14 91 142.87 91 4 2.25 819 676.13 cft
6 40+00 MH 5-MH 6 24 3.14 141 221.37 141 4 2.25 1269 1047.63 cft
7 41+50 MH 6-MH 7 20 3.14 149 233.93 146 4 2.25 1314 1080.07 cft
Total 7285.27 cft
Details of Measurements & calculation of Quantities for the Length of RCC Pipe of A Sector
Pipe for Trench
StreetA-2
Pipe Dimensions in feets
S.No Location From-To dia(Inch) No Length Width Height Quantity Units Remarks
1 street A-2 MH Old-MH 1 9 1 138 - - 138 Rft
2 street A-2 MH 1-MH 2 9 1 40 - - 40 Rft
3 street A-2 MH 2-MH 3 9 1 34 - - 34 Rft

L
o*
4 street A-2 MH 3-MH 4 9 1 108 - - 108 Rft

N
y=
Qt
5 street A-2 MH 4-MH 5 9 1 96 - - 96 Rft
6 street A-2 MH 5-MH 6 9 1 98 - - 98 Rft
Total 514 Rft
StreetA-5
1 street A-5 MH N1-MH N2 9 1 51 - - 51 Rft
2 street A-5 MH N2-MH A4 9 1 39 - - 39 Rft

L
3 street A-5 MH A4-MH 1 9 1 105 - - 105 Rft

o*
N
y=
4 street A-5 MH 1-MH 2 9 1 95 - - 95 Rft

Qt
5 street A-5 MH 2-MH 3 9 1 97 - - 97 Rft
Total 387 Rft
StreetA-6
1 street A-6 MH Old-MH 1 9 1 56 - - 56 Rft
2 street A-6 MH 1-MH 2 9 1 99 - - 99 Rft

L *
No
3 street A-6 MH 2-MH 3 9 1 97 - - 97 Rft

y=
Qt
4 street A-6 MH 3-MH 4 9 1 95.5 - - 95.5 Rft
Total 347.5 Rft
Street A-4
1 St A-4 MH 1-MH 2 9 1 79 - - 79 Rft
2 St A-4 MH 2-MH 3 9 1 80 - - 80 Rft

Qty=No*L
3 St A-4 MH 3-MH 4 9 1 79 - - 79 Rft
4 St A-4 MH 4-MH 5 9 1 88 - - 88 Rft
5 St A-4 MH 5-MH A7.1 9 1 97 - - 97 Rft
Total 423 Rft
Street A-7
1 St A-7 MH 3-MH 4 9 1 87 - - 87 Rft
2 St A-7 MH 4-MH 5 9 1 87 - - 87 Rft
3 St A-7 MH 5-MH 6 9 1 88 - - 88 Rft

Qty=No*L
4 St A-7 MH 6-MH 7 9 1 88 - - 88 Rft
5 St A-7 MH 7-MH 8 9 1 87 - - 87 Rft
6 St A-7 MH 8-MH 9 9 1 87 - - 87 Rft
7 St A-7 MH 9-MH 10 9 1 96.5 - - 96.5 Rft
8 St A-7 MH 10-MH A7.2 9 1 48 - - 48 Rft
Total 668.5 Rft
House Connection Pipe 6" Dia
street A-2
Pipe Dimensions in feets
S.No Location From-To dia(Inch) No Length Width Height Quantity Units Remarks
1 street A-2 MH 1 6 2 6 - - 12 Rft
2 street A-2 MH 2 6 2 6 - - 12 Rft
3 street A-2 MH 3 6 2 6 - - 12 Rft

L
*
No
4 street A-2 MH 4 6 2 6 - - 12 Rft

y=
Qt
5 street A-2 MH 5 6 2 6 - - 12 Rft
6 street A-2 MH 6 6 2 6 - - 12 Rft
Total 72 Rft
street A-5
1 street A-5 MH New1 6 2 6 - - 12 Rft
2 street A-5 MH New2 6 2 6 - - 12 Rft
3 street A-5 MH A4 6 2 6 - - 12 Rft

L
*
No
4 street A-5 MH 1 6 2 6 - - 12 Rft

y=
Qt
5 street A-5 MH 2 6 2 6 - - 12 Rft
6 street A-5 MH 3 6 2 6 - - 12 Rft
Total 72 Rft
street A-6
1 street A-6 MH 1 6 2 6 - - 12 Rft
2 street A-6 MH 2 6 2 6 - - 12 Rft

L *
No
3 street A-6 MH 3 6 2 6 - - 12 Rft

y=
Qt
4 street A-6 MH 4 6 2 6 - - 12 Rft
Total 48 Rft
Street A-4
1 St A-4 MH 1 6 2 6 - - 12 Rft
2 St A-4 MH 2 6 2 6 - - 12 Rft
3 St A-4 MH 3 6 2 6 - - 12 Rft

L *
No
4 St A-4 MH 4 6 2 6 - - 12 Rft

y=
12 Rft

Qt
5 St A-4 MH 5 6 2 6 - -
6 St A-4 MH A7.1 6 2 6 - - 12 Rft
Total 72 Rft
Street A-7
1 St A-7 MH 3 6 2 6 - - 12 Rft
2 St A-7 MH 4 6 2 6 - - 12 Rft
3 St A-7 MH 5 6 2 6 - - 12 Rft
4 St A-7 MH 6 6 2 6 - - 12 Rft

L
5 St A-7 MH 7 6 2 6 - - 12 Rft

*
No
12 Rft

y=
6 St A-7 MH 8 6 2 6 - -

Qt
7 St A-7 MH 9 6 2 6 - - 12 Rft
8 St A-7 MH 10 6 2 6 - - 12 Rft
9 St A-7 MH A7.2 6 2 6 - - 12 Rft
Total 108 Rft
ROAD CROSSES Pipe for Trench
Street A-4
1 St A-4 MH 1 Cross 6 1 24.5 - - 24.5 Rft
2 St A-4 MH 2 Cross 6 1 24.5 - - 24.5 Rft

Qty=No*L
3 St A-4 MH 3 Cross 6 1 24.25 - - 24.25 Rft
4 St A-4 MH 4 Cross 6 1 24.75 - - 24.75 Rft
5 St A-4 MH 5 Cross 6 1 25 - - 25 Rft
6 St A-4 MH A-7.1 Cross 6 1 24.25 - - 24.25 Rft
Total 147.25 Rft
Street A-5
1 St A-5 MH A-4 Cross 9 1 32 - - 32 Rft

Qty=No*L
2 St A-5 MH 1 Cross 9 1 25 - - 25 Rft
Qty=No*L
3 St A-5 MH 2 Cross 9 1 25 - - 25 Rft
Total 82 Rft
Street A-7
1 St A-7 MH 3 Cross 6 1 31 - - 31 Rft
2 St A-7 MH 4 Cross 6 1 25.92 - - 25.92 Rft
3 St A-7 MH 5 Cross 6 1 24.75 - - 24.75 Rft
4 St A-7 MH 6 Cross 6 1 24.75 - - 24.75 Rft

Qty=No*L
5 St A-7 MH 7 Cross 6 1 24.75 - - 24.75 Rft
6 St A-7 MH 8 Cross 6 1 24.25 - - 24.25 Rft
7 St A-7 MH 9 Cross 6 1 25 - - 25 Rft
8 St A-7 MH 10 Cross 6 1 25 - - 25 Rft
9 St A-7 MH A7.2 Cross 6 1 24.83 - - 24.83 Rft
Total 230.25 Rft
ROAD CROSSES Pipe for House Connection 6" Dia
Street A-4
1 St A-4 MH 1 Cross 6 2 6 - - 12 Rft
2 St A-4 MH 2 Cross 6 2 6 - - 12 Rft
3 St A-4 MH 3 Cross 6 2 6 - - 12 Rft

L*
No
4 St A-4 MH 4 Cross 6 2 6 - - 12 Rft

y=
12 Rft

Qt
5 St A-4 MH 5 Cross 6 2 6 - -
6 St A-4 MH A-7.1 Cross 6 2 6 - - 12 Rft
Total 72 Rft
Street A-5
1 St A-5 MH A-4 Cross 6 2 6 - - 12 Rft

L
2 St A-5 MH 1 Cross 6 2 6 - - 12 Rft

o*
N
12 Rft

y=
3 St A-5 MH 2 Cross 6 2 6 - -

Qt
Total 36 Rft
Street A-7
1 St A-7 MH 3 Cross 6 2 6 - - 12 Rft
2 St A-7 MH 4 Cross 6 2 6 - - 12 Rft
3 St A-7 MH 5 Cross 6 2 6 - - 12 Rft
4 St A-7 MH 6 Cross 6 2 6 - - 12 Rft

L
5 St A-7 MH 7 Cross 6 2 6 - - 12 Rft

o*
N
y=
Qt
6 St A-7 MH 8 Cross 6 2 6 - - 12 Rft
7 St A-7 MH 9 Cross 6 2 6 - - 12 Rft
8 St A-7 MH 10 Cross 6 2 6 - - 12 Rft
9 St A-7 MH A7.2 Cross 6 2 6 - - 12 Rft
Total 108 Rft

Details of Measurements & calculation of Quantities for the Length of RCC Pipe of B Sector
Pipe for Trench
StreetB1 &B2
1 street B-1& B-2 MH Old-MH 1 9 1 100 - - 100 Rft
2 street B-1& B-2 MH 1-MH 2 9 1 92 - - 92 Rft
3 street B-1& B-2 MH 2-MH 3 9 1 102 - - 102 Rft

L
4 street B-1& B-2 MH 3-MH 4 9 1 97 - - 97 Rft

o*
N
y=
5 street B-1& B-2 MH 4-MH 5 9 1 97.5 - - 97.5 Rft

Qt
6 street B-1& B-2 MH 5-MH 6 9 1 96 - - 96 Rft
7 street B-1& B-2 MH 6-MH 7 9 1 97 - - 97 Rft
Total 681.5 Rft
House Connection Pipe 6" Dia
street B1 &B2
1 street B-1& B-2 6 2 6 - - 12 Rft
2 street B-1& B-2 MH 1 6 2 6 - - 12 Rft
3 street B-1& B-2 MH 2 6 2 6 - - 12 Rft
4 street B-1& B-2 MH 3 6 2 6 - - 12 Rft

L
*
No
5 street B-1& B-2 MH 4 6 2 6 - - 12 Rft

y=
Qt
6 street B-1& B-2 MH 5 6 2 6 - - 12 Rft
7 street B-1& B-2 MH 6 6 2 6 - - 12 Rft
8 street B-1& B-2 MH 7 6 2 6 - - 12 Rft
Total 84 Rft
ROAD CROSSES Pipe for Trench
Street B1 & B2
1 St B1& B2 MH 1 Cross 9 1 25 - - 25 Rft
2 St B1& B3 MH 2 Cross 9 1 25 - - 25 Rft

Qty=No*L
3 St B1& B4 MH 3 Cross 9 1 25 - - 25 Rft
Qty=No*L
4 St B1& B5 MH 4 Cross 9 1 25 - - 25 Rft
5 St B1& B6 MH 5 Cross 9 1 25 - - 25 Rft
6 St B1& B7 MH 6 Cross 9 1 25 - - 25 Rft
Total 150 Rft
ROAD CROSSES Pipe for House Connection 6" Dia
Street B1 & B2
1 St B1& B2 MH 1 Cross 6 2 6 - - 12 Rft
2 St B1& B3 MH 2 Cross 6 2 6 - - 12 Rft
3 St B1& B4 MH 3 Cross 6 2 6 - - 12 Rft

L
o*
4 St B1& B5 MH 4 Cross 6 2 6 - - 12 Rft

N
y=
12 Rft

Qt
5 St B1& B6 MH 5 Cross 6 2 6 - -
6 St B1& B7 MH 6 Cross 6 2 6 - - 12 Rft
Total 72 Rft

Details of Measurements & calculation of Quantities for the Length of RCC Pipe of C Sector
Pipe for Trench
Street C-7
1 street C-7 MH C9-6-MH 1 9 1 36 - - 36 Rft
2 street C-7 MH 1-MH 2 9 1 90 - - 90 Rft
3 street C-7 MH 2-MH 3 9 1 93 - - 93 Rft

L
o*
4 street C-7 MH 3-MH 4 9 1 97 - - 97 Rft

N
y=
Qt
5 street C-7 MH 4-MH 5 9 1 97 - - 97 Rft
6 street C-7 MH 5-MH 6 9 1 98 - - 98 Rft
Total 511 Rft
Street C-8
1 street C-8 MH C9-2-MH 1 9 1 69 - - 69 Rft
2 street C-8 MH 1-MH 2 9 1 97 - - 97 Rft
3 street C-8 MH 2-MH 3 9 1 92 - - 92 Rft
4 street C-8 MH 3-MH 4 9 1 97 - - 97 Rft

L
5 street C-8 MH 4-MH 5 9 1 95 - - 95 Rft

*
No
y=
6 street C-8 MH 5-MH 6 9 1 98 - - 98 Rft

Qt
7 street C-8 MH 6-MH 7 9 1 97 - - 97 Rft
8 street C-8 MH 7-MH 8 9 1 35 - - 35 Rft
9 street C-8 MH 8-MH 9 9 1 56.5 - - 56.5 Rft
Total 736.5 Rft
Street C-9
1 street C-9 MH MR-MH 1 9 1 104 - - 104 Rft
2 street C-9 MH 1-MH 2 9 1 93 - - 93 Rft
3 street C-9 MH 2-MH 3 9 1 59 - - 59 Rft

L
4 street C-9 MH 3-MH 4 9 1 47 - - 47 Rft

*
No
y=
5 street C-9 MH 4-MH 5 9 1 52 - - 52 Rft

Qt
6 street C-9 MH 5-MH 6 9 1 51 - - 51 Rft
7 street C-9 MH 6-MH 7 9 1 103.5 - - 103.5 Rft
Total 509.5 Rft
Street C-6
1 street C-6 MH Old-MH 1 9 1 37 - - 37 Rft
2 street C-6 MH 1-MH 2 9 1 36 - - 36 Rft
3 street C-6 MH 2-MH 3 9 1 99.5 - - 99.5 Rft

L
4 street C-6 MH 3-MH 4 9 1 95 - - 95 Rft

*
No
y=
5 street C-6 MH 4-MH 5 9 1 36.5 - - 36.5 Rft

Qt
6 street C-6 MH 5-MH 6 9 1 30.5 - - 30.5 Rft
7 street C-6 MH 6-MH 7 9 1 40 - - 40 Rft
Total 374.5 Rft
Street C-10
1 St C-10 CB3-MH 1 9 1 112 - - 112 Rft
2 St C-10 MH 1-MH 2 9 1 100 - - 100 Rft

Qty=No*L
3 St C-10 MH 2-MH 3 9 1 54.5 - - 54.5 Rft
4 St C-10 MH 3-MH 4 9 1 55 - - 55 Rft
5 St C-10 MH 4-MH 5 9 1 51 - - 51 Rft
6 St C-10 MH 5-CB3.1 9 1 47 - - 47 Rft
Total 419.5 Rft
Road-15
1 Road-15 MH 1-MH 2 9 1 47.5 - - 47.5 Rft
2 Road-15 MH 2-MH 3 9 1 47.5 - - 47.5 Rft
3 Road-15 MH 3-MH 4 9 1 52.5 - - 52.5 Rft
4 Road-15 MH 4-MH 5 9 1 52.5 - - 52.5 Rft

* L
No
y=
Qt
5 Road-15 MH 5-MH 6 9 1 52.5 - - 52.5 Rft
6 Road-15 MH 6-MH 7 9 1 53.5 - - 53.5 Rft
7 Road-15 MH 7-MH 8 9 1 96.5 - - 96.5 Rft
8 Road-15 MH 8-MH-MR 9 1 108.5 - - 108.5 Rft
Total 511 Rft
House Connection Pipe 6" Dia
street C-7
1 street C-7 MH 1 6 2 6 - - 12 Rft
2 street C-7 MH 2 6 2 6 - - 12 Rft
3 street C-7 MH 3 6 2 6 - - 12 Rft

L *
No
4 street C-7 MH 4 6 2 6 - - 12 Rft

y=
Qt
5 street C-7 MH 5 6 2 6 - - 12 Rft
6 street C-7 MH 6 6 2 6 - - 12 Rft
Total 72 Rft
street C-8
1 street C-8 MH 1 6 2 6 - - 12 Rft
2 street C-8 MH 2 6 2 6 - - 12 Rft
3 street C-8 MH 3 6 2 6 - - 12 Rft
4 street C-8 MH 4 6 2 6 - - 12 Rft

L
5 street C-8 MH 5 6 2 6 - - 12 Rft

*
No
y=
6 street C-8 MH 6 6 2 6 - - 12 Rft

Qt
7 street C-8 MH 7 6 2 6 - - 12 Rft
8 street C-8 MH 8 6 2 6 - - 12 Rft
9 street C-8 MH 9 6 2 6 - - 12 Rft
Total 108 Rft
street C-9
1 street C-9 MH MR 6 2 6 - - 12 Rft
2 street C-9 MH 1 6 2 6 - - 12 Rft
3 street C-9 MH 2 6 2 6 - - 12 Rft
4 street C-9 MH 3 6 2 6 - - 12 Rft

L
o*
5 street C-9 MH 4 6 2 6 - - 12 Rft

N
y=
Qt
6 street C-9 MH 5 6 2 6 - - 12 Rft
7 street C-9 MH 6 6 2 6 - - 12 Rft
8 street C-9 MH 7 6 2 6 - - 12 Rft
Total 96 Rft
Street C-6
1 street C-6 MH 1 6 2 6 - - 12 Rft
2 street C-6 MH 2 6 2 6 - - 12 Rft
3 street C-6 MH 3 6 2 6 - - 12 Rft

L
4 street C-6 MH 4 6 2 6 - - 12 Rft

*
No
y=
5 street C-6 MH 5 6 2 6 - - 12 Rft

Qt
6 street C-6 MH 6 6 2 6 - - 12 Rft
7 street C-6 MH 7 6 2 6 - - 12 Rft
Total 84 Rft
Street C-10
1 St C-10 CB3 6 2 6 - - 12 Rft
2 St C-10 MH 1 6 2 6 - - 12 Rft
3 St C-10 MH 2 6 2 6 - - 12 Rft

L
4 St C-10 MH 3 6 2 6 - - 12 Rft

*
No
12 Rft

y=
5 St C-10 MH 4 6 2 6 - -

Qt
6 St C-10 MH 5 6 2 6 - - 12 Rft
7 St C-10 CB3.1 6 2 6 - - 12 Rft
Total 84 Rft
Road-15
1 Road-15 MH 1 6 2 6 - - 12 Rft
2 Road-15 MH 2 6 2 6 - - 12 Rft
3 Road-15 MH 3 6 2 6 - - 12 Rft
4 Road-15 MH 4 6 2 6 - - 12 Rft

* L
No
5 Road-15 MH 5 6 2 6 - - 12 Rft

y=
12 Rft

Qt
6 Road-15 MH 6 6 2 6 - -
7 Road-15 MH 7 6 2 6 - - 12 Rft
8 Road-15 MH 8 6 2 6 - - 12 Rft
Total 96 Rft
ROAD CROSSES Pipe for Trench
Street C-8
1 St C-8 MH 1 Cross 9 1 40 - - 40 Rft

ty=No*L
2 St C-8 MH 2 Cross 9 1 26 - - 26 Rft
3 St C-8 MH 3 Cross 9 1 25 - - 25 Rft

Qty=No*L
4 St C-8 MH 4 Cross 9 1 25 - - 25 Rft
5 St C-8 MH 5 Cross 9 1 25 - - 25 Rft
6 St C-8 MH 6 Cross 9 1 25 - - 25 Rft
7 St C-8 MH 7 Cross 9 1 26 - - 26 Rft
Total 192 Rft
House Connection Pipe 6" Dia
Street C-8
1 St C-8 MH 1 Cross 6 2 6 - - 12 Rft
2 St C-8 MH 2 Cross 6 2 6 - - 12 Rft
3 St C-8 MH 3 Cross 6 2 6 - - 12 Rft

L
4 St C-8 MH 4 Cross 6 2 6 - - 12 Rft

No*
y=
5 St C-8 MH 5 Cross 6 2 6 - - 12 Rft

Qt
6 St C-8 MH 6 Cross 6 2 6 - - 12 Rft
7 St C-8 MH 7 Cross 6 2 6 - - 12 Rft
Total 84 Rft

Details of Measurements & calculation of Quantities for the Length of RCC Pipe of E Sector
Pipe for Trench
Street E-1
1 St E-1 MH 1-MH 2 9 1 96 - - 96 Rft
2 St E-1 MH 2-MH 3 9 1 97 - - 97 Rft

L
3 St E-1 MH 3-MH 4 9 1 96.5 - - 96.5 Rft

N o*
y=
4 St E-1 MH 4-MH 5 9 1 96.25 - - 96.25 Rft

Qt
5 St E-1 MH 5-MH 6 9 1 95.5 - - 95.5 Rft
Total 481.25 Rft
Street E-2
1 St E-2 MH 3-MH 4 9 1 96.5 - - 96.5 Rft
2 St E-2 MH 4-MH 5 9 1 96.5 - - 96.5 Rft

L
o*
3 St E-2 MH 5-MH 6 9 1 97.5 - - 97.5 Rft

N
y=
Qt
4 St E-2 MH 6-MH 7 9 1 96.5 - - 96.5 Rft
Total 387 Rft
Pipe for House Connection 6" Dia
Street E-1
1 St E-1 MH 1 6 2 6 - - 12 Rft
2 St E-1 MH 2 6 2 6 - - 12 Rft

Qty=No*L
3 St E-1 MH 3 6 2 6 - - 12 Rft
4 St E-1 MH 4 6 2 6 - - 12 Rft
5 St E-1 MH 5 6 2 6 - - 12 Rft
6 St E-1 MH 6 6 2 6 - - 12 Rft
Total 72 Rft
Street E-2
1 St E-2 MH 3 6 2 6 - - 12 Rft
2 St E-2 MH 4 6 2 6 - - 12 Rft

L
3 St E-2 MH 5 6 2 6 - - 12 Rft

*
No
y=
4 St E-2 MH 6 6 2 6 - - 12 Rft

Qt
5 St E-2 MH 7 6 2 6 - - 12 Rft
Total 60 Rft

Details of Measurements & calculation of Quantities for the Length of RCC Pipe of Main Boulevard
Pipe for Trench
Main Boulevard C Sector
1 RD MH 7-MH 6 15 1 97 - - 97 Rft
2 MH 6-MH 5 15 1 96 - - 96 Rft
3 MH 5-MH 4 15 1 97 - - 97 Rft
4 MH 4-MH 3 15 1 97.75 - - 97.75 Rft
5 MH 3-MH 2 15 1 102 - - 102 Rft
6 MH 2-MH 1 15 1 100 - - 100 Rft

Qty=No*L
7 MH 1-CB5 15 1 151 - - 151 Rft
8 CB5-MH 1 15 1 95 - - 95 Rft
9 MH 1-CB4 15 1 125 - - 125 Rft
10 CB4-MH 1 15 1 98 - - 98 Rft
11 MH 1-CB3 15 1 123 - - 123 Rft
12 CB3-MH 2 18 1 92 - - 92 Rft
13 MH 2-MH 1 18 1 94 - - 94 Rft
14 MH 1-CB2 18 1 129 - - 129 Rft
Total 1496.75 Rft
Main Boulevard Near B1
1 RD MH B1-MH 1 12 1 106 - - 106 Rft

Qty=No*L
2 MH 1-MH 2 12 1 107 - - 107 Rft
3 MH 2-MH 3 12 1 85 - - 85 Rft
4 MH 3-B2(Shahid) 12 1 132 - - 132 Rft
Total 430 Rft
Main Boulevard
1 RD MHOld- MH(shahid) 18 1 137 - - 137 Rft
2 MH CA-MH 1 18 1 142.5 - - 142.5 Rft

Qty=No*L
3 MH 1-MH 3 18 1 144 - - 144 Rft
4 MH 3-MH 4 18 1 120 - - 120 Rft
5 MH4-MHCA1(shahid) 18 1 56 - - 56 cft
Total 599.5 cft
Main Boulevard
1 32+50 ST.PT-MH 1 24 1 40 - - 40 Rft
2 34+30 MH 1-MH 2 24 1 173 - - 173 Rft
3 36+50 MH 2-MH 3 24 1 199 - - 199 Rft

L
4 38+50 MH 3-MH 4 24 1 196 - - 196 Rft

o*
N
y=
5 38+50 MH 4-MH 5 24 1 91 - - 91 Rft

Qt
6 40+00 MH 5-MH 6 24 1 141 - - 141 Rft
7 41+50 MH 6-MH 7 24 1 149 - - 149 Rft
Total 989 Rft
Pipe for House Connection 6" Dia
Main Boulevard C Sector
1 RD MH 7 6 2 6 - - 12 Rft
2 MH 6 6 2 6 - - 12 Rft
3 MH 5 6 2 6 - - 12 Rft
4 MH 4 6 2 6 - - 12 Rft
5 MH 3 6 2 6 - - 12 Rft
6 MH 2 6 2 6 - - 12 Rft
7 MH 1 6 2 6 - - 12 Rft

L *
No
y=
Qt
8 CB5 6 2 6 - - 12 Rft
9 MH 1 6 2 6 - - 12 Rft
10 CB4 6 2 6 - - 12 Rft
11 MH 1 6 2 6 - - 12 Rft
12 CB3 6 2 6 - - 12 Rft
13 MH 2 6 2 6 - - 12 Rft
14 MH 1 6 2 6 - - 12 Rft
15 CB2 6 2 6 - - 12 Rft
Total 180 Rft
Main Boulevard Near B1
1 RD MH B1 6 2 6 - - 12 Rft
2 MH 1 6 2 6 - - 12 Rft

L *
No
3 MH 2 6 2 6 - - 12 Rft

y=
12 Rft

Qt
4 MH 3 6 2 6 - -
Total 48 Rft
Main Boulevard
1 RD MHOld 6 2 6 - - 12 Rft
2 MH CA 6 2 6 - - 12 Rft

L
3 MH 1 6 2 6 - - 12 Rft

o*
N
12 Rft

y=
4 MH 3 6 2 6 - -

Qt
5 MH4 6 2 6 - - 12 Rft
Total 60 Rft
Main Boulevard
1 32+50 MH 1 24 2 6 - - 12 Rft
2 34+30 MH 2 24 2 6 - - 12 Rft
3 36+50 MH 3 24 2 6 - - 12 Rft

L
4 38+50 MH 4 24 2 6 - - 12 Rft

*
No
y=
5 38+50 MH 5 24 2 6 - - 12 Rft

Qt
6 40+00 MH 6 24 2 6 - - 12 Rft
7 41+50 MH 7 24 2 6 - - 12 Rft
Total 84 Rft
Details of Measurements & calculation of Quantities for Bed Crushed Stone
Sector A
Dimensions in feets

B course B course
S.No Location Nos dia radius Height Quantity Units Remarks
1 st A-2 6 7.5 3.75 0.5 132.469 cft
2 st A-5 6 7.5 3.75 0.5 132.469 cft
3 stA-6 4 7.5 3.75 0.5 88.313 cft

/4
4 St A-4 6 7.5 3.75 0.5 132.469 cft

2
*H d^
5 St A-7 9 7.5 3.75 0.5 198.703 cft

ea 4*
Ar 1
S. =3.
6 St A-4 Road Cross 6 6 3 0.33 55.955 cft

se ea
7 St A-5 Road Cross 3 6 3 0.33 27.977 cft

B a Ar
y= S.
8 St A-7 Road Cross 9 6 3 0.33 83.932 cft

Qt ase
B
Total 49 852.286 cft
Sector B

e 4
as 2/
1 st B1&B2 7 7.5 3.75 0.5 154.547 cft

= B d^
*H ty 4*
2 St B1& B2 Road Cross 6 6 3 0.33 55.955 cft

ea Q 3.1
=
S. ase
ea
Ar
B
13

Ar
Total 210.502 cft

S.
Sector C
1 stC-7 6 7.5 3.75 0.5 132.469 cft
2 stC-8 9 7.5 3.75 0.5 198.703 cft

/4
3 st C-9 8 7.5 3.75 0.5 176.625 cft

2
*H d^
4 st C-6 7 7.5 3.75 0.5 154.547 cft

ea 4*
Ar 1
S. =3.
5 Road-15 8 7.5 3.75 0.5 176.625 cft

se ea
6 St C-10 7 7.5 3.75 0.5 154.547 cft

B a Ar
y= S.
7 St C-8 Road Cross 7 6 3 0.33 65.281 cft

Qt ase
B
Total 52 662.344 cft
Sector E
1 St E-1 6 7.5 3.75 0.5 132.469 cft
Base S.Area=3.14*d^2/4
Qty=Base S.Area*H
2 St E-2 5 7.5 3.75 0.5 110.391 cft Base S.Area=3.14*d^2/4
Total 11 242.859 cft Qty=Base S.Area*H
Main Boulevard
1 M.Blvrd C sector 11 8 4 0.5 276.320 cft
2 M.Blvrd C sector 4 8 4 0.5 100.480 cft
3 M.Blvrd Near B1 4 7 3.5 0.5 76.930 cft
4 M.Blvrd 5 8 4 0.5 125.600 cft
5 M.Blvrd 7 8 4 0.5 579.330 cft Base S.Area=3.14*d^2/4
Total 31 579.330 cft Qty=Base S.Area*H

Details of Measurements & calculation of Quantities for PCC (1:4:8)


Sector A
Number
of Dimensions in feets
S.No Location Manholes Bed Dia Bed Radius Height Quantity Units Remarks
1 st A-2 6 6.5 3.25 0.75 149.248 cft
2 st A-5 6 6.5 3.25 0.75 149.248 cft
3 stA-6 4 6.5 3.25 0.75 99.499 cft
4 St A-4 6 6.5 3.25 0.75 149.248 cft

/4
2
*H d^
5 St A-7 9 6.5 3.25 0.75 223.872 cft

ea 4*
Ar 1
6 St A-4 Road Cross 6 5 2.5 0.33 38.858 cft

S. 3.
d a=
7 St A-5 Road Cross 3 6 3 0.33 27.977 cft

Be re
y= S.A
8 St A-7 Road Cross 9 5 2.5 0.33 58.286 cft

Qt ed
B
Total 896.236 cft
Sector B
1 st B1&B2 7 7 3.5 0.75 201.941 cft
2 St B1& B2 Road Cross 6 6 3 0.33 55.955 cft Bed S.Area=3.14*d^2/4
Total 257.896 cft Qty=Bed S.Area*H
Sector C
1 stC-7 6 7 3.5 0.75 173.093 cft
2 stC-8 9 7 3.5 0.75 259.639 cft
3 st C-9 8 7 3.5 0.75 230.790 cft
4 st C-6 7 7 3.5 0.75 201.941 cft Bed S.Area=3.14*d^2/4
5 Road-15 8 6.5 3.25 0.75 198.998 cft Qty=Bed S.Area*H
Bed S.Area=3.14*d^2/4
Qty=Bed S.Area*H
6 St C-10 7 6.5 3.25 0.75 174.123 cft
7 St C-8 Road Cross 7 6 3 0.33 65.281 cft
Total 1303.863 cft
Sector E
1 St E-1 6 6.5 3.25 0.75 149.248 cft
2 St E-2 5 6.5 3.25 0.75 124.373 cft Bed S.Area=3.14*d^2/4
Total 273.622 cft Qty=Bed S.Area*H
Main Boulevard
1 M.Blvrd C sector 11 7.5 3.75 0.75 364.289 cft
2 M.Blvrd C sector 4 7.5 3.75 0.75 132.469 cft
3 M.Blvrd Near B1 4 6.5 3.25 0.75 99.499 cft Bed S.Area=3.14*d^2/4
4 M.Blvrd 5 7.5 3.75 0.75 165.586 cft Qty=Bed S.Area*H
5 M.Blvrd 7 7.5 3.75 0.75 231.820 cft
Total 993.663 cft

Details of Measurements & calculation of Quantities for PCC Benching (1:2:4)


Sector A
Dimensions in feets
No of Benching Benching
S.No Location Manholes Dia Radius Height Quantity Units Remarks
1 st A-2 6 4 2 0.75 56.520 cft
2 st A-5 6 4 2 0.75 56.520 cft
3 stA-6 4 4 2 0.75 37.680 cft
4 St A-4 6 4 2 0.75 56.520 cft
Bench S.Area=3.14*d^2/4
5 St A-7 9 4 2 0.75 84.780 cft Qty=Bench S.Area*H
6 St A-4 Road Cross 6 2.5 1.25 0.75 22.078 cft
7 St A-5 Road Cross 3 2.5 1.25 0.75 11.039 cft
8 St A-7 Road Cross 9 2.5 1.25 0.75 33.117 cft
Total 358.254 cft
Sector B
1 st B1&B2 7 4 2 0.75 65.940 cft
Bench S.Area=3.14*d^2/4
2 St B1& B2 Road Cross 6 2.5 1.25 0.75 22.078 cft Qty=Bench S.Area*H
Total 88.018 cft
Sector C
1 stC-7 6 4 2 0.75 56.520 cft
2 stC-8 9 4 2 0.75 84.780 cft
3 st C-9 8 4 2 0.75 75.360 cft
4 st C-6 7 4 2 0.75 65.940 cft Bench S.Area=3.14*d^2/4
5 Road-15 8 4 2 0.75 75.360 cft Qty=Bench S.Area*H
6 St C-10 7 4 2 0.75 65.940 cft
7 St C-8 Road Cross 7 2.5 1.25 0.75 25.758 cft
Total 449.658 cft
Sector E
1 St E-1 6 4 2 0.75 56.520 cft
Bench S.Area=3.14*d^2/4
2 St E-2 5 4 2 0.75 47.100 cft Qty=Bench S.Area*H
Total 103.620 cft
Main Boulevard
1 M.Blvrd C sector 11 4 2 1.25 172.700 cft
2 M.Blvrd C sector 4 5 2.5 1.25 98.125 cft
3 M.Blvrd Near B1 4 4 2 1.25 62.800 cft Bench S.Area=3.14*d^2/4
4 M.Blvrd 5 5 2.5 1.25 122.656 cft Qty=Bench S.Area*H
5 M.Blvrd 7 5 2.5 1.25 171.719 cft
Total 628.000 cft
GHULAM HUSSAIN CONSTRUCTION COMPANY ( PVT ) LTD
Abstract of Cost for Sewerage Works
IPC 1 for Sector A,B,C,E & Main Boulevard
Excavation
S.No Location Pipe Dia (inches) Quantity Unit Rate/Unit Cost
1 Sector A 67734.9 Cft 11 745083.9
2 Sector B 22170.192 Cft 11 243872.112
3 Sector C 81101.732 Cft 11 892119.052
4 Sector E 19233.1 Cft 11 211564.1
5 Main Boulevard 57645.328 Cft 11 634098.608
Total 2726737.772
Crushed Stone
1 Sector A 9004.24 Cft 75 675318
2 Sector B 3071.304 Cft 75 230347.8
3 Sector C 11532.559 Cft 75 864941.925
4 Sector E 2933.7562 Cft 75 220031.715
5 Main Boulevard 15545.283 Cft 75 1165896.225
Total 3156535.665
Sand Cushion
1 Sector A 14123.944 Cft 35 494338.04
2 Sector B 1205.671 Cft 35 42198.485
3 Sector C 17750.766 Cft 35 621276.81
4 Sector E 5306.066 Cft 35 185712.31
5 Main Boulevard 2313.783 Cft 35 80982.405
Total 1424508.05
Rcc Pipe
1 Sector A 9 2422 Rft 530 1283660
Sector A 6 965.5 Rft 310 299305
2 Sector B 9 831.5 Rft 530 440695
Sector B 6 156 Rft 310 48360
3 Sector C 9 3253.65 Rft 530 1724434.5
Sector C 6 624 Rft 310 193440
4 Sector E 9 868.25 Rft 530 460172.5
Sector E 6 132 Rft 310 40920
5 Main Boulevard 24 989 Rft 1800 1780200
Main Boulevard 18 914.5 Rft 1300 1188850
Main Boulevard 15 1181.75 Rft 1100 1299925
Main Boulevard 12 430 Rft 800 344000
Main Boulevard 6 372 Rft 310 115320
Total 9219282
PCC (1:4:8)
1 Sector A 896.236 Cft 250 224059
2 Sector B 257.896 Cft 250 64474
3 Sector C 1303.863 Cft 250 325965.75
4 Sector E 273.622 Cft 250 68405.5
5 Main Boulevard 993.663 Cft 250 248415.75
Total 931320
PCC (1:2:4)
1 Sector A 358.254 Cft 320 114641.28
2 Sector B 88.018 Cft 320 28165.76
3 Sector C 449.658 Cft 320 143890.56
4 Sector E 103.62 Cft 320 33158.4
5 Main Boulevard 628 Cft 320 200960
Total 520816
Backfill
1 Sector A 32234.317 Cft 7 225640.219
2 Sector B 11551.53 Cft 7 80860.71
3 Sector C 39037.742 Cft 7 273264.194
4 Sector E 7849.171 Cft 7 54944.197
5 Main Boulevard 21208.445 Cft 7 148459.115
Total 783168.435
ManHole
1 Sector A Nos
4 ft dia 6 ft Height 21 Nos 45000 945000
4 ft dia 8 ft Height 10 Nos 55000 550000
5 ft dia 6 ft Height Nos
5 ft dia 8 ft Height Nos
House connection 18 Nos 35000 630000
2 Sector B Nos
4 ft dia 6 ft Height 7 Nos 45000 315000
4 ft dia 8 ft Height Nos
5 ft dia 6 ft Height Nos
5 ft dia 8 ft Height Nos
House connection 6 Nos 35000 210000
3 Sector C Nos
4 ft dia 6 ft Height 31 Nos 45000 1395000
4 ft dia 8 ft Height 14 Nos 55000 770000
5 ft dia 6 ft Height Nos
5 ft dia 8 ft Height Nos
House connection 7 Nos 35000 245000
4 Sector E Nos
4 ft dia 6 ft Height 7 Nos 45000 315000
4 ft dia 8 ft Height 4 Nos 55000 220000
5 ft dia 6 ft Height Nos
5 ft dia 8 ft Height Nos
House connection Nos
5 Main Boulevard Nos
4 ft dia 6 ft Height 8 Nos 45000 360000
4 ft dia 8 ft Height 6 Nos 55000 330000
5 ft dia 6 ft Height 9 Nos 45000 405000
5 ft dia 8 ft Height 9 Nos 55000 495000
House connection Nos
Total 7185000
Grand Total 25947367.9
Details of Measurements & calculation of Quantities of Back fill for 24 Inch dia pipe
Trench Backfill
Line Dimensions in feets
S.No Location RD From-To dia No Length Width Height Quantity Units Remarks
1 M blvrd 32+50 ST.PT-MH 24 1 36 4 1 144 cft
2 M blvrd 34+30 MH 1-MH 24 1 171 4 1 684 cft
3 M blvrd 36+50 MH 2-MH 24 1 197 4 1 788 cft

*H
W
4 M blvrd 38+50 MH 3-MH 24 1 194 4 1 776 cft

L**
5 M blvrd 38+50 MH 4-MH 24 1 89 4 1 356 cft

No
y=
6 M blvrd 40+00 MH 5-MH 24 1 139 4 1 556 cft

Qt
7 M blvrd 41+50 MH 6-MH 24 1 146 4 1 584 cft
Total 3888 cft
Manhole Backfill
Manhole
Identity Line Excavation for Manhole MH Voume Back fill
S.No Location RD No dia No Length Width Height Quantity MH Dia MH rad MH vol quantity Units Remarks
1 M blvrd 32+50 MH 1 24 1 8 8 6.5 416 5.5 2.75 154.35 261.65 cft
2 M blvrd 34+30 MH 2 24 1 8 8 5.5 352 5.5 2.75 130.60 221.40 cft
3 M blvrd 36+50 MH 3 24 1 8 8 5.5 352 5.5 2.75 130.60 221.40 cft

v=3.14*r^2*h
4 M blvrd 38+50 MH 4 24 1 8 8 5.33 341.12 5.5 2.75 126.57 214.55 cft
5 M blvrd 38+50 MH 5 24 1 8 8 5.33 341.12 5.5 2.75 126.57 214.55 cft
6 M blvrd 40+00 MH 6 24 1 8 8 5.33 341.12 5.5 2.75 126.57 214.55 cft
7 M blvrd 41+50 MH 7 24 1 8 8 5.33 341.12 5.5 2.75 126.57 214.55 cft
Total 1562.651 cft
Total Backfill for 24 inch dia pipe(Trench Backfill+Manhole Backfill) 5450.651 cft
Details of Measurements & Calculation of Quantities for A House
Long Wall-Short Wall Method
Dimensions in meters
S.No Particulars/Description No Length Width Height Quantity Units
Excavation of foundations
Long walls of 2 room 2 9.5 0.9 0.6 10.26 m3
Short walls of 2 room 3 3.4 0.9 0.6 5.508 m3
Long wall of kitchen,hall & verandah 1 9.5 0.9 0.6 5.13 m3
Short wall of kitchen,hall & verandah 4 2.4 0.9 0.6 5.184 m3
26.082 m3
Cement Concrete in foundation
Long walls of 2 room 2 9.5 0.9 0.2 3.42 m3
Short walls of 2 room 3 3.4 0.9 0.2 1.836 m3
Long wall of kitchen,hall & verandah 1 9.5 0.9 0.2 1.71 m3
Short wall of kitchen,hall & verandah 4 2.4 0.9 0.2 1.728 m3
8.694 m3
Brickwork in foundation & Plinth
Ist Step
Long walls of 2 room 2 9.2 0.6 0.2 2.208 m3
Short walls of 2 room 3 3.7 0.6 0.2 1.332 m3
Long wall of kitchen,hall & verandah 1 9.2 0.6 0.2 1.104 m3
Short wall of kitchen,hall & verandah 4 2.7 0.6 0.2 1.296 m3
2nd Step 0
Long walls of 2 room 2 9.1 0.5 0.2 1.82 m3
Short walls of 2 room 3 3.8 0.5 0.2 1.14 m3
Long wall of kitchen,hall & verandah 1 9.1 0.5 0.2 0.91 m3
Short wall of kitchen,hall & verandah 4 2.8 0.5 0.2 1.12 m3
Plinth Wall 0
Long walls of 2 room 2 9 0.4 0.4 2.88 m3
Short walls of 2 room 3 3.9 0.4 0.4 1.872 m3
Long wall of kitchen,hall & verandah 1 9 0.4 0.4 1.44 m3
Short wall of kitchen,hall & verandah 4 2.9 0.4 0.4 1.856 m3
18.978 m3
Brickwork above Plinth
Long walls of 2 room 2 8.9 0.3 3 16.02 m3
Short walls of 2 room 3 4 0.3 3 10.8 m3
Long wall of kitchen,hall & verandah 1 8.9 0.3 3 8.01 m3
short wall of kitchen,hall & verandah 3 3 0.3 3 8.1 m3
42.93 m3
Deductions for doors
Long walls of 2 room 2 1.1 2.1 0.300 1.386 m3
Short walls of 2 room 0.000
Long wall of kitchen,hall & verandah 0.000
short wall of kitchen,hall & verandah 2 1.1 2.1 0.300 1.386 m3
Deductions for windows 0.000
Long walls of 2 room 1 1.2 1.4 0.3 0.504 m3
Short walls of 2 room 1 1.2 1.4 0.3 0.504 m3
Long wall of kitchen,hall & verandah 1 1.2 1.4 0.3 0.504 m3
short wall of kitchen,hall & verandah 0.000
4.284 m3
Brick work above plinth after deductio 38.646 m3

Straight wall(6m long) -Will be solved by Long Wall-Short Wall Method


Dimensions in meters
S.No Particulars/Description No Length Width Height Quantity Units
1 Excavation 1 6.4 0.7 0.5 2.24 m3
2 P.C.C (1:4:8) 1 6.4 0.7 0.3 1.344 m3
3 Brickwork in foundation & plinth 0
Ist step 1 6.2 0.5 0.2 0.62 m3
2nd Step 1 6.1 0.4 0.6 1.464 m3
2.084 m3
4 D.P.C (1:2:4) 4cm thick 1 6 0.4 2.4 m2
5 Brickwork in Superstructure 1 6 0.3 1 1.8 m3
6 Plaster(1:3) 2.5cm thick 0
Front & Back 2 6 1 12 m2
sides 2 0.3 1 0.6 m2
top 1 6 0.3 1.8 m2
14.4 m2
7 white wash As per item #6 14.4 m2
se

Remarks/Notes Excavation
length of long wall=out to out length of long wall+(2*half projection)
length of long wall=8.9+(2*0.3)=9.5
Qty=No*L*W*H

length of short wall=In to in length of short wall-(2*half projection)


length of short wall=4-(2*0.3)=3.4
half projection=(breadth of item-thickness of wall above plinth/2)

half projection=(0.9-0.3/2)=0.6/2=0.3
Concrete
length of long wall=8.9+(2*0.3)=9.5
length of short wall=4-(2*0.3)=3.4
Qty=No*L*W*H

half projection=(0.9-0.3/2)=0.6/2=0.3

Brick work
Ist Step
length of long wall=8.9+(2*0.15)=9.2
length of short wall=4-(2*0.15)=3.7
half projection=(0.6-0.3/2)=0.3/2=0.15
2nd Step
Qty=No*L*W*H

length of long wall=8.9+(2*0.1)=9.1


length of short wall=4-(2*0.1)=3.8
half projection=(0.5-0.3/2)=0.2/2=0.1
Plinth Wall
Qty=No*L*W*H

length of long wall=8.9+(2*0.05)=9


length of short wall=4-(2*0.05)=3.9
half projection=(0.4-0.3/2)=0.1/2=0.05

Brick work Above Plinth

length of long wall=8.9+(2*0)=8.9


length of short wall=4-(2*0.)=4
half projection=(0.3-0.3/2)=0.1/2=0
Qty=No*L*W*H

Door & window volume


1.1 2.1 0.3 0.693 door
1.2 1.4 0.3 0.504 window
Qty=N

Remarks/Notes Excavation
length of long wall=out to out length of long wall+(2*half projection)
length of long wall=6+(2*0.2)=6.4
half projection=(breadth of item-thickness of wall above plinth/2)
half projection=(0.7-0.3/2)=0.4/2=0.3
ist step=6+(2*0.1)=6.2 half projection=(0.5-0.3/2)=0.2/2=0.1
Qty=No*L*W*H

2nd step=6+(2*0.05)=6.1 half projection=(0.4-0.3/2)=0.1/2=0.05