ACHIEVEMENTS

All area Managers please provide feedback in a paragraph form regarding their mentioned
achievements

Installation of new BM Filters. ZK

No major rain related instrument breakdown QAB

Highest Ever Production of Dense Ash, with minimum breakdowns in May HK

No electrical breakdown on DA during first 6 months. YJK

Tower rings problem resolved. ZK

Kiln FD fan auto-tripping stopped. QAB

Erratic weight trucks problem resolved.

TG-3 Washing arrangement improved causing saving. IA

PCD panels rain water problem resolved. RAz

Calciner-3 return water pumps eliminated. Panels relocated. New panel functions merged in old one. ZK/ RAz

Moisture in top/bottom entry gases improved.

Booster station pending 50 KTPA work performed. YJK

Screw compressors buffer pump installed to assist in leaking seals problem. Resulting in seal water savings. IA

Screw-8 Overhauled. HK

Screw-7 bearing replaced by local repair in just 3 days. KM/ IA

Screw Compressor 7 chinese lube oil pump auto change level system redesigned. RAz

Draw-main leakages reduced to zero. ZK/ MS

Plate cooler booster pumps one rerouted. To SS-3-50 KTPA job improved.

MIT plate and fire problem resolved.

Moberies of screw compressor Improved. QAB

NAWH conveyers control system improved. QAB

Calciner-3 BM Filter control re-routed. RAz

New wheel loaders inventory maintained. SMz


Plant optimized after TG-4 failure without any production loss. RAz