NO. Department Current Man Power Current Working System Proposed Working System Construction
NO. Department Current Man Power Current Working System Proposed Working System Construction
DEPARTMENT Current Man Power Current Working System Proposed Working System
1. Construction 58 - Because of increased - Supervisor will create shifts to
workload, lunch hour allow workers have an hour for
reduced to 30 minutes. lunch.
2 Packaging 1
5. Quality Control 7 employees per shift - There is a 1:1 on the working - To have an hour for
Phase 2. station between employee lunch/supper requires additional
and machine. man power
- Have 30 minutes lunch.
1
6. Kiln 1 10 employees per shift - Tile Receivers do swap and - Needs one specific employee to
rest. clean and maintain machine like
- Tile Receivers do have 1hr in the past months.
lunch.
- Other have 30 minutes
lunch.
7. Gas 7 employees per shift. - At times, have rest time - Current system is manageable.
Have both day and night during working hours.
shifts. - Have an hour for
lunch/supper
8. Warehouse 11 employees in day and - At times, they are able to - Current system is manageable.
3 operators in night. rest when there is less work.
- 1hr lunch/supper
2
9. Box Making 10 employees per shift - Current work force is ok. - Current system is manageable.
- Have resting time during
working hours.
- Have an hour for lunch.
10. Loading - Loads at least 9 trucks per - Will start to each other turns to
days. rest and have lunch for an hour.
- At times manages to have an
hour for lunch and supper
for operators.
11. Press 1and 2 6 employees per shift in - Usually have too much work - Current system is manageable.
day and night. when there is a machine
breakdown or during routine
maintenance.
- 30 minutes lunch/supper
breaks
3
4
5
6