Daily Progress Welding Joint Report

Wharf Boat Landing Upper Structure

Date : 03-10-2020

No Name Requirement Previous Today

1 Pile to Baseplate 18 18 0
2 Rib to Baseplate 18 11 4
3 Baseplate to Beam (Wf 400) 18 16 0
4 Beam (Wf 400) to Beam (Wf 400) 32 28 0
5 Beam (Wf 300) to Beam (Wf 400) 48 42 0
6 Beam (Wf 150) to Beam (Wf 400) 30 26 0
7 Beam (Wf 150) to Beam (Wf 300) 30 26 0

Manpower : Jumlah
1 Welder 3
2 Fitter 0
3 Helper 1
4 SPV 1
5 Koordinator 1
6 Operator Genset 1
Total 7

Consumable & Tools Status


1 Electrode(Kawat Las) Cukup
2 Oksigen Cukup
3 LPG Cukup
4 Solar Cukup
5 Grinder Cukup
6 Cutting Torch Cukup
7 Stang las Cukup
8 Trafo Las Cukup
9 Batu Grinder Cukup

*Note
: Requirement berubah mengikuti kontrak yang real dan aktual dilapangan
t Report
tructure

Total Progress Remaining


Numbers % Numbers %
18 100% 0 0%
15 83% 3 17%
16 88.89 2 11.11
28 87.5 4 12.50
42 87.5 6 13%
26 86.7 4 13%
26 86.7 4 13%