Project Design Field Investigation

A figure below shows the factors being


considered in designing the project study.
Surveying of the River

Design
Layout of the Data Gathering
Concrete
Dam

Hydraulic Analysis
Height of the Spillway size
Dam and Location

Design of the Spillway


DAM
Concrete Dam
Geology and
Earthquake
Foundation Zone
Conditions
Design of the Open Channel
emergency spillway
Hydraulic
Analysis
Distribution System Layout

Figure 2. Factors Considered in Project Figure 3. Block Diagram of the Project


Designing
With the permission of the Manager of
A water source is located at Palo Doce Water District in San Jose Dinagat Island, field
in Sitio Manoligao which is the Manoligao investigation is then started. The researchers
Spring. Normal flow of the river will be then decided to have a hydrographic survey of
subjected to hydraulic analysis in order to the Manoligao Dam itself and the Manoligao
determine if its water flow is capable in Springs and rivers from the Water District in
providing water supply in the entire barangay of order to get the old data from the dam. The
San Jose Dinagat Island and if it’s not enough to researchers also ask some of the persons present
provide the said municipality, an increase of in the site and also interviewed an engineer who
height in the development of the dam will be is an expertise in hydraulic engineering. Data
designed then additional springs will be gathering will follow using floating method
provided to increase the volume capacity of the which will give the researchers the average
dam. In such way, the discharge will be lesser velocity of the actual flow of the water in the
and the inflow will increase and the water will river. Part of the data gathering is the measuring
be stored which will be enough for a of the dam for the purpose of layouting the new
consumption of everyday used. improved design and the spillways. The gathered
data from the floating method will be subjected
Project Development to hydraulic analysis trough manual calculation
The project development is to improve in order to determine if the calculated data can
the performance of the dam to support all types provide a bigger amount of water than the usual.
of needs in terms of water supply consumptions After that, the results attained will be the basis in
like agricultural, daily needs of a person and designing a newly developed dam which will be
such. Providing hydraulic analysis will be a used to distribute a greater supply of water.
great contributions in terms of improving the
dam.
Nowadays, there is a sudden change in
Precipitation and thereby run-off due to
aberration in climate. To combat the sudden
drought due to low precipitation it was proposed
to construct such structure which will
automatically close and open at time of need and
cost prohibitive in comparison to any concrete
dam. For this, the rainfall was analysed on
probabilistic basis and run-off was calculated
using curve number technique. The water level
and velocity of the stream was recorded and
helped in optimum design of check dam.