You are on page 1of 4

PROJECT

1) BRICK- 8"X4", FIRST CLASS BRICK


2) SAND-FREE FROM ORGANIC COMPOUND AND EARTHY MATTER
3) CEMENT - ULTRA TECH /Birla Uttam / Coromandal/JK Super/ Wonder
4) STEEL-MOURYA or Anant WITH ISI MARK

PLUMBING

1) ALL PIPE ARE USE IN CPVC MATERIAL OF AASHIRWAAD/KISANBRAND/ ASTRAL

SANITARY FIITING AND INSTALLATION

INCLUDES PROVISION OF BEST QUALITY OF MATERIAL


WALLS, MIXTURE, TRAPS, GULLIES WITH COVER SUPPORT
WASHBASIN, ANGLE COCKS, BEEP COCKS ETC ARE USED
(PARRYWARE, PLUMBER OR ESSCO BRAND) basic range with costing of wall mixer rs.3000-4000

ELECTRIC GOODS

MODULAR SWITCHES, MODULAR BOX, MODULAR PLATE IS USED


(ANCHOR/WESTERN BRAND) basic range with costing of switch rs.15-20
ELECTRIC WIRE-POLYCAB/RR CABLE BRAND WITH ISI MARK

WINDOW

18 GAGE ALUMINIUM MATERIALS WITH POWDER COATING 3 TRACKS


WITH GRILL 12MM BRIGHT BAR AS PER DRAWING

DOOR

FLASH DOORTHICKNESS
32MM
BEND PROOF
WATER PROOF
TERMITE PROOF
BOTH SIDE MICA & 120 RS. PER/SQFT DOOR
DOOR ACCESSORIES

MAIN DOOR-GODREJ LOCK WITH ROSE HANDLE


INNER DOORS WITH SS WHOLE DROP SET AND MORTISE HANDEL LOCK WITH CYLINDER
PAINT

BIRLA PUTTY UNTILE IS COMPLETE PROVIDE FINISH


2 COAT ASIAN PLASTIC PAINT TRACTOR EMULSION
EXTERIOR PAINT APEX ULTIMA-(ASIAN PAINT) ANTI ALGAL
HIGH PERFORMANCE EXTERIOR WALL FINISH

FLOORING

BEST QUALITY WORKMANSHIP


TILES 50 SQ FEET 32” X 32”
WALL TILES 50 SQ FEET 4’ X 2’

BATHROOM

ALL BATHROOM TILES HEIGHT TO 7’, WASH AREA, BALCONY IS


WATER PROOF.

KITCHEN

WITH KOTA STAND AND JET BLACK GRANITE TOP 125/- SQ FEET
SS SINK 16"X20"

STAIRCASE

RALLING -202 SS MATERIAL


GRANITE TOP WITH MOULDING AND POLISH

ELEVATION

AS PER DRAWING
SHUTTERS OF 18 GAUGE PROVIDED FOR ALL SHUTTER
RATE

1170/- RS PER SQUARE FEET.

Including Under Water Tank & Sintex Water Tank on Roof

Please note : The given rates are approx, as soon we get the actual drawing sheet from your side, we
will discuss and finalize everything.

➢ Electric and water arrangement by owner


➢ Chowkidar arrangement by builder
➢ Borewell shall be provided at an extra actual cost.
➢ Extra work will be charge extra.
➢ Construction work will take 7-8 month and depends upon payment condition.
➢ After completion of the building work, final settlement as per the measurement.
➢ All design and material check my engineer Shailendra goyal and final settlement will be
done my engineer as per measurement.
Mode of payment

1ST STEP ADVANCE

2ND STEP PLINTH

3RD STEP 1ST FLOOR SLAB

4TH STEP 2ND FLOOR SLAB

5TH STEP 3RD FLOOR SLAB

6TH STEP BRCIK WORK START

7th STEP PLASTER WORK

8TH STEP TILES WORK

9TH STEP PLUMBER WORK

10TH STEP FINISHING

Signature owner Signature builder