MAXIMUM
FLASHER—TYPE
BARRICADE
euLONG
SIDEWALK AREA SHALL
BE KEPT CLEAR
ORANAGE' PIPE
1. WHERE CURB PARKING IS RESTRICTED OR PROHIBITED, MATERIALS SHALL NOT BE STORED IN THE
ROADWAY DURING THE HOURS OF RESTRICTION.
2. BUILDING MATERIALS MAY INCLUDE SAND, GRAVEL, LUMBER, SOIL, OR ANY OTHER MATERIALS USED IN
CONSTRUCTION, AS WELL AS CONSTRUCTION EQUIPMENT.
3. DRAINAGE SHALL BE MAINTAINED BY PLACING A PIPE OF 4” MINIMUM DIAMETER AND A 2x12" BOARD
KS SHOWN ON THIS DIAGRAM,
4. THE SIDEWALK AREA AND JOB SITE SHALL BE KEPT CLEAN OF ALL RUBBISH AND DEBRIS, AND THE
SITE SHALL BE CLEANED PROMPTLY WHEN SO NOTIFIED BY THE CITY.
5. DURING CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE TYPE II FLASHER BARRICADES AS DIRECTED
BY THE ENGINEER OR HIS’ AGENT.
6. FAILURE TO COMPLY WITH ANY OF THE CONDITIONS DEPICTED ON THIS STANDARD MAY RESULT INTHE
CITY IMPOUNDING SAID MATERIALS AND/OR EQUIPMENT, OR CAUSING THE AREA TO BE CLEARED AT THE
CONTRACTOR'S. EXPENSE.
7. MATERIAL STORED ON THE STREET MUST COMPLY WITH NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM (NPDES) PERMIT REQUIREMENTS.
roan Be David Funk 17-08 CITY OF MANHATTAN BEACH
DEPARTMENT OF PUBLIC WORKS
STANDARD STREET ENCROACHMENT DIAGRAM
ST=8
_————— —