Manual 37615B SPM-D2-10 - Synchronizing Unit

Control Outputs
≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡≡
Synchronization pulse: Energizing this relay will close the CB. The relay de-energizes after the clos-
Command: Close CB Singschließen
pulse is issued. Exception: Synch-check operation mode.
Terminals 14/15

Ready for operation The contact assembly is closed when the unit is ready for operation. The relay
Terminals 18/19 will de-energize if the following occurs:
a) The internal self-monitoring system has detected an alarm condition.
Trouble-free operation of the unit cannot be guaranteed and appropriate
corrective measures must be taken.
b) The synchronization time monitoring system is enabled and the config-
ured time has expired before synchronization has occurred.

NOTE
Alarm conditions must be assessed externally from the controller (i.e. a latching circuit connected with
the circuit breaker control circuit).
The mains monitoring operates independently from the state of the generator circuit breaker. The cir-
cuit breaker must be blocked externally from operating (e.g. in the event of a stationary engine) when
the corresponding alarm condition is detected.