You are on page 1of 23
appa osol Meg SAUDI ARAMCO: ‘Saudi aramco a FADHILI GAS PROJECTS DEPARTMENT FADHILI GAS INLET AND. TREATMENT & PROCESS UTILITIES FACILITIES SAPMT Site Office ‘Telephone No.: (013) 678-2925 July 12, 2018 EGITPU/IK-L-53974/2018 RICARDO J. MATEO, Contractor Representative TECNICAS REUNIDAS SAUDIA FOR SERVICES & CONTRACTING CO, LTD. GR, 2051051935 CoC No. 69345 P.O, Box 77076, Al-Khober 31952, Kingdom of Saudi Arabia 1k Contract Nos. 6600036250 / 6600036252 CONTRACTOR: QUALITY PROCEDURE FOR FIELD VALVE TEST PROCEDURE (10040-00-090- PD-0015 Rov.02) FOR APPROVAL, ‘Your reference: TRSA-SAF-L-54885 Pigase find attached COMPANY response to your submitted document CONTRACTOR: QUALITY PROCEDURE FOR FIELD VALVE TEST PROCEDURE (10040-00-090-PD-0015 Rev.02), Should you have other concems, please contact Abdulaziz F Hazzani, at Telephone No. 013 678-2560 or email via ni Mae Co: File: 811.226 ‘Atachment(s): YES Response required: NO a TEcmieas neuwoas FGP PROJECT RECEIVER L-S397) Upstream Projects inspection Division Fadhili Projects Inspection Section Fadhili Gas inlet and Treatment & Process Utlities Facilities Phone: Fa ‘Name: AHMED. AL-QANTANI Position: Sr. Projact Engineer ‘FGPD / Fadhiti Gas inlet and Treatment & Process Utilities Facilites +10-01900-8002/3, ‘QUALITY PROCEDURE FOR FIELD VALVE TEST PROCEDURE (20040-00-080-PD.0018 ForTPusic-T-o3e4s Rev.02) FOR APPROVAL, ‘QUALITY PROCEDURE FOR FEUD VALVE TEST PROCEDURE (x0090-00-090- PO-OO1S Rev.02) FOR APPROVAL. ‘-Aecpied 2-Acpad of ones Relea ail ARS RPO S-Radewed connor §-Nelewd/ comes Valve pressure tests shal be performed in accondance with API S98, 04 SAMS O48, SAEP 035 and SAES1 108. Vehesshet Jand seat is to be tested as applicable. Signs Mubarak J Al Harbi Unit Supervisor (A) Fadhili Gas Inlet & Treatment DOCUMENT CODE: 10040-00-090-PD-0015 aie comma FADHILI GAS PROGRAM (FGF) PROJECT PROJECT: 1040 FIELD VALVE TEST PROCEDURE PAGE 10F 7 ty FIELD VALVE TEST PROCEDURE MAIN DOCUMENT REV, DATE ISSUE CODE COMMENTS ~ 00 05-OCT-2016 Issued for Approval ot 06-Feb-2018 Issued for Approval 02 (05-Jun-2018 Issued for Approval ATTACHMENTS DOCUMENT CODE DES: ION REV. TRSA-SAF-L-00523, Revised List of Valves for Site Testing TEMPLATES > DOCUMENT CODE DESCRIPTION REV. Pressure Test Report (Valve Inspection " 2015.09.01 SATR-A-2001-V anaceue PREPARED: REVIEWED: APPROVED: CHECKED: M. Javeed Hugo Mario Romero | Ricardo J. Mateo _| Mauricio Valderrama er : ne This documents propa of UTE TR Fait Poot and TR SaucfrSances and Contracting Co Li. ie opetocio opr prmiign wing siya — ae coeeee cos reree FADHILI GAS PROGRAM (FGP) PROJECT PROJECT: 10040 FIELD VALVE TEST PROCEDURE Pace 20° #7 ti DOCUMENT CODE: 10040-00-090-PD-0015 a Tenet INDEX 4d 4.2 COMPANY REFERENCES. 5. RESPONSIBILITIES. 6. FIELD TESTING OF VALVES. 7. GENERAL REQUIREMENTS. 8. HYDRO TEST WATE) 9. SEAT TEST PRESSURE PROCEDURE AND EXECUTIO! 10, MULTIPLE VALVE TESTING PROCEDURE... 11. PRESSURE RECORD TEST & TRACEABILITY smu 12, VALVE REPAIR. 14, SAFETY PRECAUTIONS... 15. ATTACHMENTS.. 18.1 ATTACHMENT 15.2 ATTACHMENT -2, ‘This documents propery of UTE TR Fadhil Project and TR Seudia for Services and Contracting Co Lic Is reproduction without previous permassion in wt fs stn forbidden. oromco fal 'FADHILI GAS PROGRAM (FGP) PROVECT ‘COMMENT CONTROL SHEET [Pomewre coMROL SHEET Nas feossansanpoaoTe Ret mv becunet espn: CONTRACTOR: FED VANE TEST PROGEDURE a a aa TUR sar OF SSE WTO om eT Meh 201 [oer [ARoDUARA MAN HISSAN [CONTRACTOR to delete from the SCOPE: |All block valves [Paragraph 4: VALVE REPAIR: Ass note as follows: [Should a certain type of valve fail the Test at a rate exceeding 3% or 4) lvalves whichever is greater, then this type of valves shall be tosted at] 100% coverage. |Add the note in Paragraph 4 [Submit a marked up P&ID highlighting valves to be tested for review |Constractor Submit |Submit an excel sheet with all isolation valves statistics listing size and| |descriptio for final list refinement Proponent l2019 [CONTRACTOR shou prepare the ist of valves o be ld tested! an] the list should be approved by proponent (SAES-L~108 Para 4.7.2) PID |Constractor ~_Aeepted io frhar ation are equated + Aeceped with comments: CONTRACTOR shal review and incorporate the COMPANY comments (if appicele] in next sue. = Revs and resubmit CONTRACTOR shallreuse and resubra the document aap keeping the some issue purpose. ‘Saudi Aramco: Company General Use FADHILI GAS PROGRAM (FGP) PROJECT PROJECT: 10040 FIELD VALVE TEST PROCEDURE PAGE 308 17 ti TeQMcASREUDAS DOCUMENT CODE: 10040-00-090-PD-0015 Rev: 02 1. PURPOSE This procedure is to establish the minimum requirements to be followed for valve field testing activities by the CONTRACTOR Técnicas Reunidas Saudia for Services and Contracting Co Ltd. throughout the realization of the Contract EPC (Package 01 — Fadhili Gas Inlet and ‘Treatment Facilities & Package 02 — Fadhili Process Ultities and interconnecting Systems), for the Saudi Aramco - Fadhili Gas Program (FGP) Project, 2. SCOPE This test procedure specifies the testing and acceptance criteria for valves that requires field testing to ensure that they are free from any leaks before installation and that they are verified ‘and inspected in accordance with the applicable codes, standards and specifications, as required by COMPANY. Contractor chosen approved third party profile and procedure of valve testing will be sent for company approval Typical below listed valves will be field tested. * All valves for isolation service * All MOVs and their bypass valves on pumps and compressors and at plant isolation locations. * All ZVs and thelr bypass valves, ‘* All pressure control valves (PCVs) that are normally closed. * Allisolation valves for control valves and their bypass valves that are in process service (oil, gas and water; not utility service). + Allvalves designated as “TSO' (tight shut-off) on the P&IDS. 3, DEFINITIONS COMPANY: ‘Saudi Arabian Oil Company (Saudi Aramco) (IK). CONTRACTOR: Técnicas Reunidas Saudia for Services and Contracting Co Ltd. (ik). PROJECT: Fadhili Gas Program (FGP) Project Package 01 — Fadhili Gas Inlet and Treatment Facilities This document is propaty of UTE TR Fadhili Project and TR Saudia for Services and Contracting Co Lid, its reproduction without previous permission in wtng Is stil forbidden FADHILI GAS PROGRAM (FGP) PROJECT PROJECT: 0000 FIELD VALVE TEST PROCEDURE PAGE 40F 17 ti DOGUMENT CODE: 10040-00-090-PD-0015, Reveoe SUBCONTRACTOR INSPECTION ‘SAUDI ARAMCO INSPECTION CHECKLISTS (SAICS) SAUDI ARAMCO INSPECTION CHECKLISTS (SATIPS) Package 02 - Fadhili Process Utities and interconnecting ‘Systems Means a company authorized by CONTRACTOR and COMPANY for the performance of any portion of the WORKS. ‘An activity such as measuring, examining, testing or gauging ‘one or more characteristics of an entity and comparing the results with specified requirements in order to establish whether Conformity is achieved for each characteristic, ‘Saudi Aramco pre-approved Inspection Checklists form part of the SATIPs that identify the lists of PASS/FAIL Inspection Criteria, reference standards, re-inspection date and other Pertinent inspection details that are used for inspection of activities. ‘Saudi Aramco pre-approved Inspection and Test Plans (ITPs) that are generated by Saudi Aramco Inspection Department customized for use in Saudi Aramco-managed construction projects. mp Inspection and Test Plan. RFI Request For Inspection. 4. REFERENCES 41 Standard References API-S98 Valve Testing and Inspection ASME B16.34 Valves-fianged, threaded and welded end ASME 831.3 Process Piping The documents propenyof UTE TR Fadi Project nd TR Sau for Sices and Conecing Co Lid {trpracton witha presavsparmionn wnt i scty ooon, et FADHILI GAS PROGRAM (FGP) PROJECT PROJECT: 10040 FIELD VALVE TEST PROCEDURE aoe 6 oF 17 ty DOCUMENT CODE: 10040-00-090-PD-0015 Tae Neeser 4.2 Company References Geterece sane Quality Requirements of IK Contracts (n° 6600036250 & 6600036252) eine = Sheer of IK Contracts (n® 6600036250 & SAES-L-108 Selection of Valves SAES-A-004 General Requirements for Pressure Testing SAES-L-150 Pressure Testing of Plant Piping and Pipelines 04-SAMSS-048 Valve Testing and Inspection Requirements SAEP-035 Valves Handling, Hauling, Receipt Tests and Storage SAES-A-007 Hydrostatic Testing Fluids and Lay-Up Procedures G1-0002,102 Pressure Testing Safely Note: Should a certain type of valve fail the Test at a rate exceeding 3% or 4 valves whichever ie Greater, then this type of valves shall be tested at 100% coverage. 5, RESPONSIBILITIES The following personne! shall be involved and responsible for the activities incorporated in this Procedure and to ensure that all quality aspects are adhered to: * The Project Manager & Construction Managers are responsible for the proper implementation of this procedure. ‘This documents property of UTE TR Fadhil Project and TR Sauek for Sarices and Contracting Co Lia {ts reproduction without previous permission In wring is stetlyforidaen. FADHILI GAS PROGRAM (FGP) PROJECT PROVECT: 0040 FIELD VALVE TEST PROCEDURE Roe ear 17 th DOCUMENT CODE: 10040-00-090-PD-0015 ee Tenses ‘QA/QC Manager is responsible for the overall distribution and implementation of required quality control activities such as test and inspection for this particular job. QA/QC Inspectors: Responsible for inspection in accordance with specifications and Procedures of the Valve Installation, Testing and the compilation retention of OC reports and records, Project Engineer: Responsible to ensure that this procedure is understood and is being implemented by his subordinates. Piping superintendent is responsible to manage the day to day field activities and co- ordination proceedings required with the HSE department to ensure that proper safety implementation respective to personnel, equipment and environment are strictly adhered. Testing supervisor is responsible to monitor day to day field activities, assuring that implementation is as per this procedure and relevant referenced standards and as per HSE policy manual, Safety Manager/Supervisor will make sure that the safety requirements are fulfilled before/during the testing. Job Safety Analysis/Safety Task Assignments will be strictly implemented. 6. FIELD TESTING OF VALVES Testing location will be specified by CONTRACTOR. The specified test location shall be evaluated and approved by Inspection Department through a formal assessment. The test location conditions shall be maintained throughout the testing period. Subcontractor chosen facility at site and personnel for field valve testing will be offered for ‘company assessment and approval. Al new valves designated for isolation service (as specified by the CONTRACTOR in Technical Query “TRFG-AOC-TQ-QUA-00001") will be subjected to a high pressure hydrostatic seat test prior to installation in the line. This document is proparty of UTE TR Fach Project and TR Saudia for Sorvcas and Contracting Go Lia Its reproduction without previous permission in wring fs scl forbidden. FADHILI GAS PROGRAM (FGP) PROJECT PROJECT: 10040 FIELD VALVE TEST PROCEDURE Pace 70°17 ti DOCUMENT CODE: 10040-00-090-PD.0015 ee “ota The high pressure hydrostatic seat test for flare system valves will be substituted by a low Pressure pneumatic seat test at 35 kPa (5 psig), Butt-weld and socket-weld end valves in nominal pipe size (NPS) 2 inches and smaller are ‘exempt from the above field testing requirements. ‘Test procedures, pressures, durations, and leakage acceptance criteria will be the same 2s those defined by the valves manufacturer. The use of ANSI FCI 70.2 to specify seat leakage criteria is not permitted without the specific approval of the Chairman of the Valves Standards Committee. All resilient (soft) seated isolation valves shall have zero leakage. 7, GENERAL REQUIREMENTS. Valve testing pump shall be verified prior to start the valve testing activities. Two (2) calibrated pressure gauges are required for test and calibrated by independent testing laboratories with maximum one (1) month validity. All gauges should have a range such that the test pressure is within 30% to 80% of the full range of the gauge. Their accuracy shall be withit 5% of one to another. ‘An isolation valve shall be provided between the pressure testing manifold and system being tested. The isolation valve shall be rated for the manifold test pressure when in the closed Position. All manifold shall be tested and certified by approved third party agency. Pressure testing ‘manifold shall be separately pressure tested at least 1.2 times the system test pressure but not less than the discharge pressure of the pump used for pressure testing. All blind flanges shall be standard blind flanges and they shall be the same class rating of the ‘system or may be fabricated based on appropriate calculation. All required equipment and instruments for the hydro test such as hydro test pump, pressure ‘gauge, and relief valves shall be inspected prior to hidrotest. Relief Valve should be calibrated by independent laboratories with maximum 1 week validity with sot prossure 105% of Test pressure. This documents propery of UTE TR Fadhil Project and TR Sauala for Services ard Contracting Co Lid. its reproduction without previous permission in wring fs stl forbidden. FADHILI GAS PROGRAM (FGP) PROJECT PROJECT: 10040 FIELD VALVE TEST PROCEDURE PAGE BOF 17 ti DOCUMENT CODE: 10040-00-090-PD-0015 be Reve0a Personnel involved with the inspection & testing shall be competent for the required task 8. HYDRO TEST WATER The water used for testing shall be clean and free from suspended matter. Prior to hydro test water sample shall be taken to determine the specific requirement of water quality as per SAES- ‘A.007. Stainless steel! material shall be hydro tested with water containing chloride content less than 50pm. Water test certificates from independent third party lab meeting testing requirement will be submitted for review. 9, SEAT TEST PRESSURE PROCEDURE AND EXECUTION. Make sure that the seat of the valve is clean thoroughly Ensure that the valve is properly supported prior to the filing and pressurization process. The valve shall be at the fully closed position. Install one blanking flange at one end of the valve(The other end shall not be blinded. ) Fill the system with approved test water until if flows out from the highest vent point. Close the highest vent when all trapped air has been released. Gradually pressurize the system until reaching the test pressure. Allow the pressure and temperature of the test water to reach equilibrium. Pressure test will comply with ASME B 16.34 for gate valves, globe valves and check valves CLASS ASME B 16.34 150 | 300 | 600 soo | 1500 | 2800 | 4500 TEST PRESSURE 201925 | 58/825 | +16/1658 | 18012288 | 281/4125 | a8z/6875 | 884712375, BarlPsi “This documents property of UTE TR Fea Project nd TR Sauda fr Services and Contracting Co Lt. id rproavcton watt previo prmssson win ese oaden FADHILI GAS PROGRAM (FGP) PROJECT PROJEOT: 10040 FIELD VALVE TEST PROCEDURE xo oF 17 ty DOCUMENT CODE: 10040-00-090-PD-0015 are Testes ‘Test Duration as per API 598 ‘Minimum Test Duration (Seconds) * (evans, | Slosure DN NPS Shell ‘with ieenag cess Backseat Valves Other Valves Feature) | (AP1 884) <@) 6510150 | (2t2106) 60 60 60 60 (8 to 12) 2(14) }* The test duration Is the period of inspection afler the valve is fully prepared and i under full pressure. Test Pressure as per API 598 Table 3—Shell Test Pressures ‘Shell Test Pressure (ainimum Clase Pounds per BarGauge | Squareinch Gauge (psig) 73 = 400 300 oe 5 125 DN 5010 360 (NPS at 12) 2 360 DN 850 1900 (NPS 14 12 48) @ 205 cast ion DN 5016 900 (WPS 10 12) 250 a as DN 350 19 600 (NPS 14 to 28) a 25 seat | tansea Tab 1 3500 butt weld 150 to 4500 = 300 = threaded ® and socket wold e TSE B16 bla eae and vation Clans 2500 ard ower > Per ASME B16.24, Je For cias 600 salve, sho est presse shal be += tee the presi ing at 38°C (109°F- rounded orto the rentigher bm (2 pg) fae iso APL. ‘This document is property of UTE TR Fadhil Project and TR Sauela fer Services and Contracting Co Ltd its rproduaton wiheut previous poisson in wring le stclyfrbiddon. FADHILI GAS PROGRAM (FGP) PROJECT PROJECT: 10080 FIELD VALVE TEST PROCEDURE PAGE 100F17 ty Tecacas eumoas DOCUMENT CODE: 10040-00-090-PD-0015, Valves Except Buttery high-pressure closure and backseat © B é low-pressure closure and backseat ® 4107 6010 100 Buttery Valve high-pressure cosure é > low-pressure closure 4107 60 to 100 (Check Valve high-pressure closure lass 125 (cast iron) DN 50 to 300 (NPS 2'to 12) 4 200 DN 360 to 1200 (NPS 14 to 48) 1 150 Class 260 (cast ron) DN 50 to 300 (NPS 2 to 12) 35 00 DN 350 to 600 (NPS 14 to 24) 21 300 las 160 (ductile iron) 7 250 Glass 300 (ductile ren) “4 040 carbon, alloy, stainless steel, and special alloys 6 ca low-pressure closure (eee Table 1 and Table 2) 4107 6010 100 [= The backseat tests required forall valves that have this feature, > 110 % of maximum allowable pressure at 38 °C (100 °F) in accordance with the applicable purchese| speciication. }© 110 % of design differential pressure at 38 °C (100 °F) in accordance with the applicable purchase| spectcation. }4 Single values shown are minimum test pressures. A range of values indicates both minimum end] ‘maximum test pressures. a Examine the valve for possible leakages at the seat. When test pressure is reached close test isolation valve and disconnect the pressure hose. Observe gauges (a minimum of two) constantly during test. Access to depressurizing valve in This document is property of UTE TR Fadhil Project and TR Saudia fer Sorvioos and Contracting Co Ltd Ins reproducton without previous permlsion In writing le tril forbid, FADHILI GAS PROGRAM (FGP) PROJECT PROJECT: 0040 FIELD VALVE TEST PROCEDURE PAGE 11 0F «7 ti DOCUMENT CODE: 10040-00-090-PD-0015 “tea Rev 02 case of thermal expansion is essential. Pressure gauges shall be within 5% of each other when iin use. Duration of test shall be a minimum as required to determine compliance with acceptable criteria / standards. Obtain TRG OC Inspection approval and acceptance prior to depressurization of the system. Open the depressurizing valve gradually in such a way as not to cause vacuum and collapse during draining. Open the highest vent point after initial pressure release before draining. Ensure that the valve body is thoroughly drained through its drain valve. All hydro test water shall be drained, valve internals shall be fully dried and the machined areas shall be coated with a light film of high viscosity rust inhibiting oil. Unbolt the blanking flange and relocate to the opposite end. Close the valve. The other side shall not be blinded. Repeat the previous sequence. Unbolt the blanking flange clean & dry. Ensure that the flange temporary protectors are refastened. ‘This document is propery of UTE TR Fadhill Project and TR Sauda for Services and Contracting Co Ltd its reproduction without previous pormssion in wring is slit forbidden. ‘uapeaioy Aros 8 Bug ux voreeuued snemend joy voronporde! i) “p17 29 Buypenueg pue seoHes 2} BNeS YL pu Fell INE a LN,P Aveda] woLUnDop SH vero tm pssoeds raul ona | ene sau eRe 0788.04 veya pegs ena a ame op ce B® 9 AH ponds mun 8 BE LE BML se2081 ubempbe pompous ef em eRbNe eS zu woz ooh zor 96 0 sy _| ooz £9 ou sz sa) 8 o zr _| oso 09 81 oz oat og o or | oo +s istb 80 ooh zu o ge | 006 oy e's 96 sz ¥9 o ze_| 08 sy 92's 06 ozs 09 0 os | ose zy gus v8 zu 96 o ez_| oo ee 60's 82 vor zs o 9z_| 099 se bob ze 96 or. o +z _| 009 oe v8'0 09 08 or 0 oz_| 00s 4 2'o vs ze 9 o ei _| oop ve 290 8 +9 ze o at | oo» iz es'0 ee 95 8% o vt | ose 8 oso 9 8 ve. o zi_| ove su zo of ov oe o or | ose, Zz #e'0 % ze ov o s_| o0z 6 sz’o a ve zs ° o | os sz vo si oz ou 0 s | sa 9 20 zu 1 8 o y | oor st evo 6 zu o e | of sue wo se ov o |ez| so e 200 9 qo ao o zs _| oss (weu) (uew) (uruyoo) | (ujus /sejqqnq) | (ujus /sdosp) senren | (ui) | (um) sseiseo | iseisep | werpmbm | ssorsep | .sse.pinbry | Pevees | saN| NG aed juaInsoy pase omaaane nes dooxa senjen peseos jeiow ty | SmeeNrA “Bupsey pure uoysedsuy enje, B6S-Id¥ 409 21921 Jad se oq |J1m soyes eBeyeo] eIqemony 20a on $100-Gd-060-00-09001 :3000 1NaNndoa i, cisaziisoea BUNGIOONd 1831 SATA GIA ‘001 -uoaroud 4ogroud (d94) NVuOOud Sv MIHGVS FADHIL! GAS PROGRAM (FGP) PROJECT PROJECT: 10040 FIELD VALVE TEST PROCEDURE PAGE 130F17 ty DOCUMENT CODE: 10040-00-090-PD-0015 aoe REV: 02 10. MULTIPLE VALVE TESTING PROCEDURE. Install valves in series and blind at both ends and fil the system with water. Close the last valve of the system and remove the blind. Verify the closure test as per paragraph 9. Later the test, release the pressure, close the next valve and unbolt the union between these two valves, Repeat the cycle until the remaining valves in the series passed the required test pressure Any valve leaking shall be removed from the series of valves and resume testing. 11, PRESSURE RECORD TEST & TRACEABILITY One time the test will be finished template SATR-A-2001-V will be fill and signed, Contractor will keep a tracking log of fled valve testing with all the data of acceptance, rejection, and repairs. The log will be shared with company as per the agreed frequency with inspection department. Color tags are to be utlized for better identification’ indication of valve acceptance status (Green- Accepted- Red- Rejected — Blue - On Hold) 12, VALVE REPAIR Any repairs will be notified to company and valves shall be repaired by approved Vendor and shall be retested as per this procedure and ITP. Valve can be repaired with authorization from manufacturer and consent from CONTRACTOR based on the extent of the damage. 13. STORAGE AND PRESERVATION OF VALVES AFTER TESTING Valves storage area for before and after field testing storage shall be assessed and approved by Inspection department. ‘hie documents propery of UTE TR Fadhil Project and TR Seuula for Services and Contracting Co Li. iis reproduction witout previous permission in writing is str foridden, FADHILI GAS PROGRAM (FGP) PROJECT PROJECT: 1040 FIELD VALVE TEST PROCEDURE PAGE 14 0F 17 ty ‘TEDNCAS REUNDAS DOCUMENT CODE: 10040-00-090-PD-0015, Contractor shall plan for regular periodic inspection of valves during storage in order to verify integrity of the covers, caps, grease and ather visible conditions Long-term storing after test will lead to re-testing of valves, in order to avoid retesting contractor is advised to plan for testing as close as reasonable to installation. Any storage longer than 3 months shall be considered as long term. Refer to SAEP-35 para. 103 Critical assembly such as Valve ends ports, valve stem, actuators, gear box shall be protected. Valves shall not be laid directly on ground, use pallets, timber bases If the valve is equipped with sealant injectors, inject a sufficient amount of light lubricant in order to push out any remaining moisture in the seat pocket area and replace it with the fresh lubricant 14, SAFETY PRECAUTIONS Valve testing facility needs to be approved by COMPANY prior to use. Since the pressure test is higher than normal operating conditions, safely precautions must be taken. No personnel other than the testing crew shall be allowed near the valves being tested the hydro test is in-progress. The inspectors/ testing crew shall be located at a safe distance, away from the valves being tested, while building-up the pressure. Close visual inspection for leakage during the test shall be made with safe precaution. The area shall be barricaded with waming signs and cleared off all unauthorized personnel during the testing. Safety barricade and sign boards need to be posted in all direction. This document is propoty of UTE TR Fadil Projet and TR Sauda for Services and Contracting Co Ld, iis reproduction without previous permission in wring ssc forbiiden. FADHILI GAS PROGRAM (FGP) PROJECT PROJECT: 10080 FIELD VALVE TEST PROCEDURE PAGE 180 17 DOCUMENT CODE: 10040-00-090-PD-0015 Revs02 TECHICAS REUNDAS 45. ATTACHMENTS This document is propery of UTE TR Fedhil Project and TR Sautts for Services and Contracting Co Lid. its reproduction without provious permission in wing ssc foridden. FADHIL! GAS PROGRAM (FGP) PROJECT PROJECT: 1040 FIELD VALVE TEST PROCEDURE PAGE 160F 17 DOCUMENT CODE: 10040-00-090-PD-0015, nara ti mee 15.1 ATTACHMENT 4; ‘Schematic arrangement - Valve testing in Series for hydro testing of Valves This document is property of UTE TR Facil Project and TR Saucla for Senices and Contracting Co Lid its reproduation wiheut previous permission in vnting is stretyforbdzen. FADHILI GAS PROGRAM (FGP) PROJECT PROJECT: 10040 FIELD VALVE TEST PROCEDURE PACE 17 OF ty DOCUMENT CODE: 10040-00-090-PD-0015 ena “toast 152 ATTACHMENT-2 ‘Schematic arrangement — Single Valve testing for hydro testing of Valves o o rer cK or a { auras Peer ‘The document ie propery of UTE TR Fadhil Project and TR Sauela for Sonoes and Contracting Co Ltd its ropreduoton without previous permiseion in wring i sot foridden, ‘U1 ACO IBID Dan 201 -REV. 20156901 Sc CA Sapoer 205) ____ ev 250801 ss918 [SAUDI ARAMCO TEST REPORT cs es | oe ee ae Pressure Test Report (Valve Inspection & Field Testing) | SATR-A-2001-V | 24-Mar-16 |S TarrsoWIBER ——JCOWTRACTOR SUBCONTRAGTOR ————} fcourmer wo nomsens |ecurwenr oescraeron fesrsrsreu navrestrane. pant no, [ris NONSER PBIRST TRB (PRESSURE TEST ORR FATOREOF TEST WORE PEROT REI [ScREDUED TEST ORTET THE = Pon TERTORTER TA ICOCATON OF TEST PANT AWE WOT [>TO ATRONEER STE — Fara Nea g SHEN Rejection Detale Repair Disposition Witness: Repair Dat [Repair Accopiod (Ataahed Ropar EDR. Preservation afr Testing: State fype reservalion Chock DaleMNotes) nae poe Testntuments [pep Pe Seger c ‘Sarial NalTag No- a “ =e =e : : Ne > = aia ae = meet - Roca Due bse Tt Deseo oT TER PORES ce Ne. | _(Complete Applicable Data EntryPriorto Tos) __| Actual | Pass | Fall Remark ‘Test Medium Type/Quality (haat metod of veaner ean A |Remats Fd yon, ph, SRB court, Oz Scavenga 8 _|SystemTemperature attest: Wave Bay: a = © [Test Pressure: | Test Durato: | a 2 D_ fTest Pressure: Test Duraton: = te SaaTOF E [Test Pressure: Tost Duration: nner ——— F [Tost Prossure: Test Duration: G | catLeakage Ooserved : @ API 598 (Orops or Bubboa!Min) 1H [Method of teak detection (visual rect, arti) . | Valve Test Accepted. ag [Bt reasons in [TEST RESULTS: |,cricawy Test TAPE To THs RePoRT(resTevbencey CL] _| 1 Relested Framers Secon TT TEPER Saud Arameo lesan Rae PT Representative = eel Tao ia veges TaN [eR [as [ec Tnspector —]Pib Representative = aT — RT Taras |r nun [LSS a ania er Dole: oO J ow foe supe? = facet am Ta Raa od O.Ba.7976, lobar 1852 if UTM ge ‘Saad aa Spa epal gut Deonsunis ——Gagdall Naty las pagal oli wi USG AS ITMURTL gt anne, aa TECNICAS REUNIDAS SAUDIA FOR SERVICES & CONTRACTING CO. LTD. Ceres ul Capital 36.5 elton Sud Riyal CR. 2051051935 CoC No.69345 FADHILI GAS PROGRAM (FGP) PROJECT Contract No.: 6600036250 6600036252 SAUDI ARABIAN OIL COMPANY Attention to: Company Representative Fadhili Gas Projects Department Site Office. Madrid, June 04%, 2018 (Our Ref, No.: TRSA-SAF-1-00623 You're Ref. No: N/A. OurRef.No: NIA. Subject: REVISED LIST OF VALVES FOR SITE TESTING. Dear Sir, CONTRACTOR has proceeded to update the documentation related to the subject and the below listed documents are being submitted for COMPANY final acceptance. Markup P&iDs: ae eee D42-MEG PIDs Valve for Site Testing Rev.2 42-200 PIDs Valve for Site Testing Rev.2 1D43-510-PIDs Valve for Site Testing Rev.2 D43-960-PIDs Valve for Site Testing Rev.2 ° (D46 PIDs Valve for Site Testing Rev-2 1047 Pils Valve for Site Testing-Rev-2 List of Valves: PPA ETA ens (042-MEG List of Instrument Valves Site Test Rev.2 (1D42-MEG List of Mech Valves Site Test Rev.3 (042-200 List of Instrument Valves Site Test Rev.2 (042-200 List of Mech Valves Site Test Rev.3 ‘D43-List of Instrument Valves Site Test Rev.2 1D43-List of Mech Valves Site Test Rev.3 (D46-List of Instr Valves Site Test Rev-2 D46-List of Mech Valves Site Test Rev-2 D47-List of Mech Valves Site Test Rev-3 Page 1 of 2 (20,800, 710%, Alibaba 31852, Sad eaia Whee 8M a6e Baysall CAsLALy cLasall dyagsall olagigy MiSs Sh eT UMtgAe fc 966 13NEGL AM AME ANTN AS ore TECNICAS REUNIDAS SAUDIA FOR SERVICES & CONTRACTING CO. LTD, soar TUAW age apna yall AG ‘orale Capa 365 ion Sud yt GR. 2051051935 CoC No.68345 Pee Tope 0 Do not hesitate to contact us in case of any clarification you might require. ‘Yours faithfully, CONTRACTOR Representative EMiws Attachment(s): Yes Reply Required: Yes aeoniens feunroas FGP PROJECT 4 JUN 2018 FGITPU 04 JUN 208 RECEIVED ISSUED Page 2 of 2

You might also like