• Structure :Port House

• Location: Antwerp, Belgium


• Architect: Zaha Hadid New Headquarter

• Completion Year: 2016

• Total Floor Area: 12,800 sq m


• No of Floors: 8
• Client: Port of Antwerp
• Building Type: Office Building

• Materials: Steel structure , Glass

• The new Port House in Antwerp repurposes, renovates


and extends a derelict fire station into a new Existing fire station

headquarters for the port – bringing together the


port’s 500 staff that previously worked in separate
buildings around the city.
History and Designing Ideas:

Existing Structure is Former fire station

Port Of Antwerp Elevation Of Fire Station


Planning:

Ground Floor Plan Seventh Floor Plan


114 mtrs
46 mtrs

Longitudinal section
Stage Of Construction:

Framing Of Foundation Concrete Tower & Bridge Placement of steel frame

Installation of composite floor deck Installation of triangle glass facade