CLIENT : DUBAI ELECTRIC & WATER AUTHORIY

BUREAU VERITAS PROJECT : RFX-2121900085 INTEGRITY INSPECTION


FOR FUEL SYSTEMS AT ‘H’ STATION PHASE II
PO BOX: 9110, Dubai, UAE CONTRACT NO.: DBA.4.19.970
REPORT NO.: BV/DEWA/AWEER/UTG-011 DATE:- 18.10.2020
PAGE NO: 1 OF 2
ULTRASONIC THICKNESS GAUGING REPORT
SITE : AL AWEER POWER STATION ,DUBAI DRAWING NO. : CNE121/2004-U-09-M-R23050
SPECIFICATION : NA EQUIPMENT : CYGNUS1 SR NO: 7535
PROCEDURE NO: BV/DEWA/UTG-014 REV-0 CALIBRATION: DUE DATE DEC-20
MATERIAL: A106 Gr.B CALIBRATON BLOCK :15 mm Block
THICKNESS: VARIOUS COUPLANT : Cellulose Paste
SURFACE CONDITION : AS SMOOTH CONDITION EQUIPMENT TAG /LINE NO : Mention Below
Line No/Tag ITP Observed Thickness( mm) Remarks
Sch./WT
No NO. Location
(mm) A B C D
LOCATION-1 5.8 5.9 6.0 6.1
DN-150-FO- LOCATION-2 6.3 6.2 6.0 5.9
40EGD01- LOCATION-3 REDUCER 6.9 6.9 7.4 7.5
01 7.11
BR-001
CS-AG LOCATION-4 7.4 6.9 7.7 7.6
LOCATION-5 7.4 7.3 7.3 7.2
LOCATION-1 REDUCER
6.9 7.0 7.1 7.2
LOCATION-2 REDUCER
6.9 7.0 7.0 7.0
LOCATION-3(ELBOW) 6.8 7.2 7.4 7.5
LOCATION-4 7.7 7.1 6.9 7.2
LOCATION-5(ELBOW) 6.9 7.4 7.3 7.6
DN-150-FO-
40EGD01- LOCATION-6 7.2 7.2 7.4 7.4
02 LOCATION-7 REDUCER 7.11 7.6 8.1 7.7 8.2
BR-002
CS-AG LOCATION-8 REDUCER 7.6 7.0 7.1 6.8
LOCATION-9 7.2 7.4 7.5 7.6
LOCATION-10 7.2 7.3 6.9 7.1
LOCATION-11(ELBOW) 7.2 7.3 6.7 7.7
LOCATION-12 7.4 7.3 6.5 7.0
LOCATION-13(ELBOW) 7.6 7.3 7.2 7.7
LOCATION-14 6.9 6.1 7.1 7.3
LOCATION-1(SS) 4.5 4.6 4.5 4.6
DN-150-FO- SS-TANK-(S) 2.6 2.6 x X
40EGD01- SS-TANK-(N) 2.6 2.6 X X
02 7.11
BR-002 SS-TANK-(W) 2.6 2.6 X X
CS-AG SS-TANK-(E) 2.6 2.6 X X
SS-TANK-(BOTTOM) 2.6 2.6 x X
NDT INSPECTOR CLIENT TPI
Name : SANTOSH SINGH Company : Company :
Signature : Name : Name :
Qualification : NDT Level II Signature : Signature :

Date : 18.10.2020 Date: Date :