BUREAU VERITAS PROJECT : RFX-2121900085 INTEGRITY INSPECTION
FOR FUEL SYSTEMS AT ‘H’ STATION PHASE II PO BOX: 9110, Dubai, UAE CONTRACT NO.: DBA.4.19.970 REPORT NO. : BV/DEWA/AWEER/UTG-008 DATE:-21.10.2020 PAGE NO: 1 OF 3 ULTRASONIC THICKNESS GAUGING REPORT SITE : AL AWEER POWER STATION ,DUBAI DRAWING NO. :CNE/121/2004-U-09-M-R23050 2 of 6 SPECIFICATION : NA EQUIPMENT : CYGNUS1 SR NO: 7535 PROCEDURE NO: BV/DEWA/UTG-001 REV-0 CALIBRATION: DUE DATE DEC-20 MATERIAL: A106 Gr. B CALIBRATON BLOCK :15 mm Block THICKNESS: VARIOUS COUPLANT : Cellulose Paste SURFACE CONDITION : AS SMOOTH CONDITION EQUIPMENT TAG /LINE NO : Mention Below Line ITP Observed Thickness( mm) Remarks Sch./WT No/Tag No NO. Location (mm) A B C D
Qualification : NDT Level II Signature : Signature :
Date : 21.10.2020 Date: Date :
Documents No: BV /UTG-001 Rev-0
CLIENT : DUBAI ELECTRIC & WATER AUTHORIY BUREAU VERITAS PROJECT : RFX-2121900085 INTEGRITY INSPECTION FOR FUEL SYSTEMS AT ‘H’ STATION PHASE II PO BOX: 9110, Dubai, UAE CONTRACT NO.: DBA.4.19.970 REPORT NO. : BV/DEWA/AWEER/UTG-008 DATE:-21.10.2020 PAGE NO: 2 OF 3 ULTRASONIC THICKNESS GAUGING REPORT Line ITP Observed Thickness( mm) Remarks Sch./WT No/Tag No NO. Location (mm) A B C D
Qualification : NDT Level II Signature : Signature :
Date : 21.10.2020 Date: Date :
CLIENT : DUBAI ELECTRIC & WATER AUTHORIY
Documents No: BV /UTG-001 Rev-0
PROJECT : RFX-2121900085 INTEGRITY INSPECTION BUREAU VERITAS FOR FUEL SYSTEMS AT ‘H’ STATION PHASE II CONTRACT NO.: DBA.4.19.970 PO BOX: 9110, Dubai, UAE REPORT NO. : BV/DEWA/AWEER/UTG-008 DATE:-21.10.2020 PAGE NO: 3 OF 3
ULTRASONIC THICKNESS GAUGING REPORT
Line ITP Observed Thickness( mm) Remarks Sch./WT No/Tag No NO. Location (mm) A B C D