Professional Documents
Culture Documents
NOTES:
1CC1B01 1CC1P27
48 48
R420-D-2115 N RLL
FREE DRAINING
6
7
0
46
DESIGN TEMPERATURE: 5/115 °C 46 2"-N-R420-7100-1CC1P01-NI 4"-G-R420-1047-1CC1B01-PP 46 (NON ZLSO), THE SAFETY INTERLOCK IS ENERGIZED AND STOPS THE PUMPS.
MATERIAL: CS 13
3 - DELETED.
INSULATION: PP
4 - DELETED.
45
1" 45
STEAM OUT: YES
7
5 - DELETED.
TRIM LINE: VT-R420-1051-3CC1B01-PP 1
NOTE
6 - DELETED.
VT-R420-1475-1CC1B01-PP 1N
44 1 44 7 - DRAIN TO BE DISPOSED TO THE CLOSED DRAIN SYSTEM THROUGH A
PV
D
D 1152 TEMPORARY HOSE CONNECTED TO THE NEAREST CONNECTION POINT
2"x1•" 1M ON THE COLLECTION HEADER.
A 4"x2"
43 43
3 SPLIT-RANGE
1•"-300#RF 8 - DELETED.
AFC
AFC
B PY PY D B
4 9 - DELETED.
1152 1152
42 3 42
1N A B 4"x2" 3" 10 - STRAIGHT RUN OF FIVE (5) PUMP NOZZLE DIAMETERS BEFORE PUMP
7
14
2"x1•" D SUCTION NOZZLE AND AFTER REDUCER.
PV
NOTE
41
3"x2" 1M D 41 11 - REFER TO PUMP SEAL PLAN ON DWG: D-EP-R400-1225-1019.
NOTE
1152
1 12 - REFER TO INSTRUMENTS ON MOTOR ON DWG:D-EP-R400-1225-1026.
1 B
2"-150#RF 3"
13 - HALF SLOT PIPE- OPEN PATH.
40 40
DRAINING
1CC1P01
14 - CV OF BY-PASS VALVE SHALL NOT BE GREATER THAN CV OF R420-PV-1152A.
4
39 6 39
REFORMATE SPLITTER
COLUMN OVHD
C C
I
FROM R420-E-2115 SPLIT RANGE CONTROL
FREE
38 D 38
FREE DRAINING
2"-G-R420-1036-1CC1B01-PP VENTING LINE (NON CONDENSABLE)
110
1CC1B01
R420-1103
VALVE POSITION
1 0
4.6
@ 4
V 1
9
H V@
4
37 37 OPEN
F
REFORMATE SPLITTER
COLUMN OVHD
2B
36 36
P
4"-G-R420-1046-1CC1B01-PP
FROM R420-E-2115
15
V
FREE DRAINING
3"-G-R420-1037-1CC1B01-PP EQUALIZING LINE
-
85
-1
1
R420-1103
1
35 35
1 5
4.6 3"-G-R420-1048-1CC1B01-PP
PV
5
@ 1
V 1
2
9
PC
H V@
A
F
1152
D D
REFORMATE SPLITTER
34 34
COLUMN OVHD
FROM R420-E-2115 FREE DRAINING
12"-P-R420-1038-1CC1B01-PP
33 85 33
R420-1103 PT
1 5
4.6 CLOSED
@ 1
1152
V 1
9
H V@
4
O 50% 100%
D
PC OUTPUT
4"-150#RF
3"-150#RF
32 32
SB-1150A
5B
MIN.
85
1 5
4.6
@ 1
V 1
31 31
9
H V@
4
1 V 1D
F
12"-150#RF 2"
2"-300#RF 2" 2"x1"
E 30 I1 I2 O2 30 GENERAL NOTES: E
6"-150#RF 4"x2"
9B
3"-150#RF
9C
29 2"-300#RF 29 - ALL INSTRUMENT TAGS TO BE PREFIXED BY R420- UNLESS OTHERWISE
REFORMATE SPLITTER
HLL 3,150 INDICATED.
REFLUX DRUM MH M H
4"
LG LT LC FHS
LLL 2,450 2"-300#RF 24"
28 1150 1150 1150 1153 28
3" L1B DP L
TO REFORMATE TANK
UC
2" TO R420-E-2112
27 1 NOTE 13 NNF 27
10"-150#RF 85
V 1D 4"x2" R420-1112 UTILITY P&ID REFERENCE TABLE
O1 11.5
7025 mm
2"-300#RF L2A 2"x1"
MIN.
2"x1" HIL 678 1 D
26 26 RLL DWG NO. D-EP-R420-1225-1725
DETAIL-M2+
8"-P-R420-1017-1CC1B01-PP
F 4"x2" 2" 3CC1B01 D F
I 1
1" 1CC1B01
N DWG NO. D-EP-R420-1225-1748
9A
1 AFC ZC
9C
25 D 25
INT T LIL 522 TSO 1151 1M OWS DWG NO. D-EP-R420-1225-1771
INT SB-1150B
2"-300#RF
4"
LT LG 8"x6"
ZV
1151 S.P. CDA DWG NO. D-EP-R420-1225-1780
24 1151 1150 24
MODE
1
1"-P-R420-1438-1CC1B01-NI
DP
H
AFC
LI LI L2B FC
REFERENCE DRAWINGS
9
HS 1152
4
1151 1151 4"x2" 2"
1
23 23
O3 DWG NO. DWG TITLE
@
1150
NORMAL
L
V
2"x1" 1"-P-R420-1437-1CC1B01-NI
H
R
5.4
8"x6"
85
1
3CC1B01 1" CLOSE VALVE & FV
I 3
7
22 1CC1B01 85 1"-P-R420-1045-1CC1B01-PP LOGIC ACTIVATION 1M 1152 22
2"x1"
NOTE
5
G 5.4 G
NNF
1
1
@
D 6"-150#RF
V
SB-1150C
F
21 READABLE SB-1150E 1 21
D-FE-R420-1225-1103_4 R420-1 XYLENES FRACTIONATION SECTION - REFORMATE SPLITTER COLUMN OVERHEAD
4 1
10"-P-R420-1039-1CC1B01-PP
I ISSUE PURPOSE: FINAL ISSUE AS-BUILT
3"-P-R420-1108-1CC1B01-NI
20 SB-1150D 85 FT 20 APPROVED FOR ARAMCO APPROVED FOR
6A
3"-CD-R420-8053-1CC1D01-NI
CDA 1"-CD-R420-8051-1CC1D01-NI 16.0 1152 OVERSEAS COMPANY B. V. SUMITOMO CHEMICAL CO. , LTD
8"-P-R420-1044-1CC1B01-PP
1CC1D01 1CC1B01
SIGNATURE/DATA NAME SIGNATURE/DATA NAME
19 1 19
V FE
1CC1D01 1CC1B01 1" D
2" 1152
1 S.P.
18 1D 18
1 1
D H
FC D D FC
H H
1150 1151
17 L 17
510
6"-150#RF FT 6"-150#RF
OWS
FT
1150 FE FE
16 16
5
REFORMATE SPLITTER FV CDA 511 1151 FV Z1 26/08/17 FINAL ISSUE AS-BUILT M.ZAKEE A.BUETTO M.AMMIRATI
1
D 1150 1151
1
5.4
46
TO R420-T-2110 6A
15 1 1 6"-P-R420-1033-1CC1B01-PP 10"x8" 1 8"x6" 1 15
6"-P-R420-1032-1CC1B01-PP 8"-P-R420-1042-1CC1B01-IH
85
R420-1102
16.0
8"x6" AFC LOCATION: RABIGH, SAUDI ARABIA
8"-P-R420-1043-1CC1B01-IH
AFO 6 LOW
14 1M D 1M D 1M D D 1M 14
6" I POINT
10"-P-R420-1042-1CC1B01-IH
NOTE 7
4
NOTE 7
6" NOTE 7
RABIGH II REFINING AND PETROCHEMICAL PROJECT
I 85 85 I
NOTE 7 4
13 D S-1150I 13 NAPHTHA AND AROMATICS PACKAGE (RP2)
1 5
6.8 16.0
@ 1
1 B-1150I
V 1
6"x3" 3"
F
6"x3"
16.0
10"-P-R420-1042-1CC1B01-IH
12 12
85
16.0
85
1 1 S-1150H
S7 S-1150F
B-1150H D
10"-P-R420-1041-1CC1B01-PP
B-1150F
11 1150 11
10"-P-R420-1040-1CC1B01-PP
I
D
I 1 DETAIL-Q3
1 9
@ 4
V @1
5
10 DETAIL-Q3 10
2
1"
F V
S-1150G ZC
H
ARAMCO OVERSEAS COMPANY B.V.
5
2
1" B-1150G
9.4
1
1151
85
1 D
1"-P-R420-1434-1CC1B01-NI
J
9 1 D 6 1 9 & SUMITOMO CHEMICAL CO. , LTD J
1"-P-R420-1433-1CC1B01-NI
M
1
COLUMN
6
M
PG ƒ"-#600 ƒ"-300#RF PG SAIPEM JOB CODE: 032142
8 8
PG ƒ"-#600 ƒ"-300#RF PG 1151 1152
TP-8 THIS DOCUMENT IS CONFIDENTIAL. THE COPYRIGHT THEREIN IS VASTED IN COMPANY.
B 1
EXTRACTIVE
1151 1152 B
1
1
TP-8 RECIPIENTS MUST OBTAIN THE WRITTEN AUTHORITY OF THE SAID COMPANY BEFORE WHOLLY OR PARTLY DUPLICATING OR DISCLOSING THE SAME TO OTHERS. ALL RIGHTS RESERVED.
1
1
DISTILLATION
1
5
5
46 A A 46
R420-1201
7 5B 5B 7
6"-300#RF 8"-300#RF
16.0 5B 6"-300#RF 5B 16.0
8"-300#RF
RS NOTE 10
10"x6" 10"x8"
RS NOTE 10
6 D ƒ"-300#RF 6
PIPING AND INSTRUMENTATION DIAGRAM
C7-CUT
10"x6" 10"x8"
SB-1150M
ƒ"-300#RF 1" V 1
SB-1150L D 1 D
I
3 1"
1
1" V D
1
D 1 R420-1 XYLENES FRACTIONATION SECTION
TO
1 1"
I
1 3 1"
K 5 1" D 1 5 K
1" 1" REFORMATE SPLITTER COLUMN OVERHEAD (2/2)
I
R420-P-2115B
TRIM LINE: VT-R420-1435-3CC1B01-PP(FOR P-2115A) REFORMATE SPLITTER CDA D-EP-R420-1225-1104 B Z1
L 507 REFORMATE SPLITTER L
TRIM LINE: VT-R420-1436-3CC1B01-PP(FOR P-2115B) CDA 506 REFLUX AND DISTILLATE PUMP OWS REFLUX AND DISTILLATE PUMP SAIPEM DWG. NO.:
1 1
OWS B
R420-GD-B-06603 Z1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16