Professional Documents
Culture Documents
Latest CSH DRG Status - 19.01.21
Latest CSH DRG Status - 19.01.21
MODIFICATION OF BUNKER-MARKING OF
38 30050 BUNKER GIRDER ON ROW-A AND B done
MODIFICATION OF BUNKER-MARKING OF
39 30051 BUNKER GIRDER ON LINE-2, 5, 6 AND 7 done
MODIFICATION OF BUNKER-DETAIL OF
BUNKER GIRDER MODIFICATION
40 30052 BETWEEN LINE-7 TO LINE-6 ON ROW-A done
MODIFICATION OF BUNKER-DETAIL OF
BUNKER GIRDER MODIFICATION
50 30062 BETWEEN LINE-7 TO LINE-6 ON ROW-B done
MODIFICATION OF BUNKER-DETAIL OF
BUNKER GIRDER MODIFICATION
52 30064 BETWEEN LINE-6 TO LINE-5 ON ROW-B Done 08.01.21
MODIFICATION OF BUNKER-DETAIL OF
BUNKER GIRDER MODIFICATION
54 30066 BETWEEN LINE-5 TO LINE-4 ON ROW-B Done 08.01.21
MODIFICATION OF BUNKER-DETAIL OF
BUNKER GIRDER MODIFICATION
56 30068 BETWEEN LINE-4 TO LINE-3 ON ROW-B Done 11.01.21
MODIFICATION OF BUNKER-DETAIL OF
BUNKER GIRDER MODIFICATION
58 30070 BETWEEN LINE-3 TO LINE-2 ON ROW-B Done 11.01.21
MODIFICATION OF BUNKER-DETAIL OF
BUNKER GIRDER MODIFICATION
60 30072 BETWEEN ROW-A TO ROW-B ON LINE-7 Done 11.01.21
MODIFICATION OF BUNKER-MISC. DETAIL
OF BUNKER GIRDER MODIFICATION
61 30073 BETWEEN ROW-A TO ROW-B ON LINE-7 Done 11.01.21
MODIFICATION OF BUNKER-DETAIL OF
BUNKER GIRDER MODIFICATION
62 30074 BETWEEN ROW-A TO ROW-B ON LINE-6 Done 12.01.21
MODIFICATION OF BUNKER-DETAIL OF
BUNKER GIRDER MODIFICATION
64 30076 BETWEEN ROW-A TO ROW-B ON LINE-5 15.01.21 13.01.21
MODIFICATION OF BUNKER-DETAIL OF
BUNKER GIRDER MODIFICATION
65 30077 BETWEEN ROW-A TO ROW-B ON LINE-2 18.01.21 13.01.21
MODIFICATION OF BUNKER-MARKING OF
HOPPER STIFFENER MODIFICATION
66 30078 ALONG ROW-A AND B 18.01.21 13.01.21
MODIFICATION OF BUNKER-DETAIL OF
HOPPER STIFFENER MODIFICATION
67 30079 ALONG ROW-B 18.01.21 13.01.21
MODIFICATION OF BUNKER-DETAIL OF
HOPPER STIFFENER MODIFICATION
68 30080 ALONG ROW-A 18.01.21 17.01.21
70 30101 Issued
71 30102 Issued
D
72 30103 Issued
73 30104 Issued
MODIFICATION OF FLOOR-TEMPORARY
83 30113 SUPPORTING STRUCTURE AT EL.+33.240 25.01.21 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
SMG done done 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
PNS 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
DONE
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
PNS 20.01.21
PNS 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
SMG 20.01.21
Precentage
49
FSH
Sl No Drg No Description Extraction Modeller
1
2 30001 General Note 08.01.21 SM & PM
3 30002 Drawing list 08.01.21 SM & PM
4 30003 3D view 08.01.21 SM & PM
5 30004 Weigh hopper post replacement-sht1 done PM
6 30005 Weigh hopper post replacement-sht2 done PM
7 30006 Floor - sht1 done PM
8 30007 Floor - sht2 done PM
9 30008 Floor - sht3 done PM
10 30009 Floor - sht4 done PM
11 30010 Floor - sht5 done PM
12 30011 Floor - sht6 done PM
13 30012 Floor - sht7 done PM
14 30013 Floor - sht8 done PM
15 30014 Floor - sht9 done PM
16 30015 Floor - sht10 done PM
17 30016 Floor - sht11 done PM
18 30017 Floor - sht12 done PM
19 30018 Floor - sht13 done PM
20 30019 Floor - sht14 done PM
21 30020 Floor - sht15 done PM
22 30021 Floor 28.840 Done PM
23 30022 Floor 28.840 Done PM
24 30023 Staircase Sheet-01 Done PM
25 30024 Staircase Sheet-02 Done PM
26 30025 Elevation & roof - sht1 done PM & SM
27 30026 Elevation & roof - sht2 done PM & SM
28 30027 Elevation & roof - sht3 done PM & SM
29 30028 Elevation & roof - sht4 done PM & SM
30 30029 Elevation & roof - sht5 done PM & SM
31 30030 Elevation & roof - sht6 done PM & SM
32 30031 Elevation & roof - sht7 done PM & SM
33 30032 Elevation & roof - sht8 done PM & SM
34 30033 Elevation & roof - sht9 done PM & SM
35 30034 Elevation & roof - sht10 done PM & SM
36 30035 Elevation & roof - sht11 done PM & SM
37 30036 Elevation & roof - sht12 done PM & SM
38 30037 Elevation & roof - sht13 done PM & SM
39 30038 Elevation & roof - sht14 done PM & SM
40 30039 Elevation & roof - sht15 done PM & SM
41 30040 Elevation & roof - sht16 done PM & SM
42 30041 Elevation & roof - sht17 done PM & SM
43 30042 Elevation & roof - sht18 done PM & SM
44 30050 Bunker-sht1 Done SM
45 30051 Bunker-sht2 Done SM
46 30052 Bunker-sht3 Done SM
47 30053 Bunker-sht4 Done SM
48 30054 Bunker-sht5 Done SM
49 30055 Bunker-sht6 Done SM
50 30056 Bunker-sht7 Done SM
51 30057 Bunker-sht8 Done SM
52 30058 Bunker-sht9 Done SM
53 30059 Bunker-sht10 Done SM
54 30060 Bunker-sht11 Done SM
55 30061 Bunker-sht12 Done SM
56 30062 Bunker-sht13 Done SM
57 30063 Bunker-sht14 Done SM
58 30064 Bunker-sht15 Done SM
59 30065 Bunker-sht16 Done SM
60 30066 Bunker-sht17 Done SM
61 30067 Bunker-sht18 Done SM
62 30068 Bunker-sht19 Done SM
63 30069 Bunker-sht20 Done SM
64 30070 Bunker-sht21 Done SM
65 30071 Bunker-sht22 Done SM
66 30072 Bunker-sht23 Done SM
67 30073 Bunker-sht24 Done SM
68 30074 Bunker-sht25 Done SM
69 30075 Bunker-sht26 Done SM
70 30076 Bunker-sht27 Done SM
71 30077 Bunker-sht28 Done SM
72 30078 Bunker-sht29 Done SM
73 30079 Bunker-sht30 Done SM
74 30080 Bunker-sht31 Done SM
75 30081 Bunker-sht32 Done SM
76 30082 Bunker-sht33 Done SM
77 30083 Bunker-sht34 Done SM
78 30084 Bunker-sht35 Done SM
79 30085 Bunker-sht36 Done SM
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21
done 15.01.21