NO ACTIVITY DATE REMARKS


A Hassan
1 HS Support email by 21-JAN Need to
mansoor respond
2 SKID Email from Rashid. 21-Jan Need to
17-Jan respond
3 HWYHGGM Need To
Mismatched In IFC And Prepare TQ
NMR Drawings (BY
NIZAM 30-DEC)
4 TR-02029-003-00057- Need To
21-CPP (17-JAN BY Check The
CPPNGCP) Revised IFC
Drawings
5 Additional Platform CO Prepare CO
As Per
MR086
6 DIESEL Generator Letter Need To
Response (18-NOV BY Respond
CPP NGC) The Letter
7 ANCHOR FLANGE Need To
Mismatched (23-DEC BY Check The
NAJEEM) Revised
Quantity
8 Letter For Clash Of PR Follow With
FDN At HWYH RH-EK HASSAN If
The
Response Is
Already
Been Issued
9 CO Base Course-
Response (18-JAN BY
HASSAN)
B Hasnan

1 Weekly Activity Report


2 APCS 1B Coating For
OHPL FDM (26-DEC BY
MERGHANI)
3 SSB Revised NMR 602 Need To
Package Review The
Package
4 Concrete Collar
C Samim/Luning/Rashid
1 PSV01 And MOV01 CO
(20-JAN)
2 TEKLA Moduler Invoice E-MAIL To
LUNING
3 ASF Platform NMR Arrange
Drawings (Request from
From Nizam) BAWARDI
4 Send An Advance Copy
Of Platform NMR
Drawings To ASF
5 HVACMR0027
REVIEW(19-JAN BY
OSAID)
6 PSV1 And MOV1 Chanel
Size Substitution ( 18-
JAN E-MAIL BY SAMIM)
7 Refabrication Of PR
19/20
D SSB VENDOR
1 Cement Type Of
Concrete
E ALDRIN
1 FDN Clashing At
HWYHGGM (19-JAN
CASE 2)
F Faisal/ Guan
1 QRT Project Redline
(18-JAN BY FAISAL)
2 QRT Project Reuse of
Pipe Support
G Mansoor
1 Coordination Of JB
Racks
H Yousaf
1 Raise TQ For Electrical
Guard Rail
2 Wind Soak
3 Share Redline Drawings
Of Misc Items With
Mansoor And Site
I Salman( Review
Remaining Platform
Drawings )