A Hassan 1 HS Support email by 21-JAN Need to mansoor respond 2 SKID Email from Rashid. 21-Jan Need to 17-Jan respond 3 HWYHGGM Need To Mismatched In IFC And Prepare TQ NMR Drawings (BY NIZAM 30-DEC) 4 TR-02029-003-00057- Need To 21-CPP (17-JAN BY Check The CPPNGCP) Revised IFC Drawings 5 Additional Platform CO Prepare CO As Per MR086 6 DIESEL Generator Letter Need To Response (18-NOV BY Respond CPP NGC) The Letter 7 ANCHOR FLANGE Need To Mismatched (23-DEC BY Check The NAJEEM) Revised Quantity 8 Letter For Clash Of PR Follow With FDN At HWYH RH-EK HASSAN If The Response Is Already Been Issued 9 CO Base Course- Response (18-JAN BY HASSAN) B Hasnan
1 Weekly Activity Report
2 APCS 1B Coating For OHPL FDM (26-DEC BY MERGHANI) 3 SSB Revised NMR 602 Need To Package Review The Package 4 Concrete Collar C Samim/Luning/Rashid 1 PSV01 And MOV01 CO (20-JAN) 2 TEKLA Moduler Invoice E-MAIL To LUNING 3 ASF Platform NMR Arrange Drawings (Request from From Nizam) BAWARDI 4 Send An Advance Copy Of Platform NMR Drawings To ASF 5 HVACMR0027 REVIEW(19-JAN BY OSAID) 6 PSV1 And MOV1 Chanel Size Substitution ( 18- JAN E-MAIL BY SAMIM) 7 Refabrication Of PR 19/20 D SSB VENDOR 1 Cement Type Of Concrete E ALDRIN 1 FDN Clashing At HWYHGGM (19-JAN CASE 2) F Faisal/ Guan 1 QRT Project Redline (18-JAN BY FAISAL) 2 QRT Project Reuse of Pipe Support G Mansoor 1 Coordination Of JB Racks H Yousaf 1 Raise TQ For Electrical Guard Rail 2 Wind Soak 3 Share Redline Drawings Of Misc Items With Mansoor And Site I Salman( Review Remaining Platform Drawings )