PROJECT

1. Residential area
The residential area A is expected to have:
- Population: 100.000 people, with per capita water consumption q = 200 l/capita.day
- Service area: 1000 people, with per capita water consumption q =15 l/capita.day
- Teacher and student: 1000 people, with per capita water consumption q =50
l/capita.day
Raw water taken from river A is characterized as belows:

No. Parameter Unit Value


1 pH - 6.0 – 7.0
2 Turbidity NTU 60
3 Colour Pt-Co 30
4 Alkalinity mg/l CaCO3 60
5 Coliform MNP/100ml >200 MPN/100ml

Characteristic of domestic wastewater is presented as follows:

No. Parameter Unit Value


1 pH - 6.0– 7.0
2 TKN mg/l 60
3 BOD5 mg/l 250
4 COD mg/l 400
5 TSS mg/l 220
6 NH4+-N mg/l 25
7 NO3-N mg/l 5
8 Tổng P mg/l 15
9 Coliform MNP/100ml 10 – 109
7

Questions:
- To determine the design capacity of water treatment plant and to propose a
configuration of water treatment plant to meet the drinking water quality standards
QCVN 01:2009/BYT,
- To determine the design capacity of sewage treatment plant and to propose the
configuration of wastewater treatment plant (including sludge treatment) to meet the
effluent quality standard QCVN 14: 2008 / BTNMT (column B). As know that infiltration
and inflow rate of 150 l/capita.day,
- To determine the size of 3 main facilities (water works) and the capacity of the
concerned equipment of the water and wastewater treatment plants,

1
- To estimate the sludge porduction (tons/day) from water and wastewater treatment
plants.

2. Industrial zone

Industrial park A is expected to have:


- The area for industries is 300 ha, with water demand of 45 m 3/ha.day
- The area for service facility is 25 ha, with water demand of 15 m 3/ha.day
- The area for technical facilities is 10 ha, with water demand of 15 m 3/ha.day
- Green area is 60 ha, with water demand of 20 m3/ha.day
- Public transport area is 50 ha, with water demand of 15 m3/ha.day
The industrial water taken from wells has the following characteristic:

No. Parameter Unit Value Industrial water quality standard


1 pH - 5.8-6.2 6.5-9.0
2 Fe2+ mg/l 7 0.3
3 Mn2+ mg/l 0.5 0.1
4 Hardness mg/l CaCO3 50 100
5 Alkalinity mg/l CaCO3 30 -

The industrial effluent regulation for connector to the wastewater collection system of the
industrial Park A are as follows:

No. Parameter Unit Value


o
1 Temperature C 40
2 Colour Pt – Co 200
3 BOD5 mg/l 400
4 COD mg/l 600
5 TSS mg/l 300
6 TKN mg/l 120
7 NH4+-N mg/l 40
8 Coliform MNP/100ml 5.000

Questions:
- To determine the design capacity of water treatment plant and to propose a
configuration of water treatment plant to meet the non-drinking water quality
standards QCVN 02:2009/BYT,

2
- To determine the design capacity of wastewater treatment plant and to propose the
configuration of wastewater treatment plant (including sludge treatment) to meet the
effluent quality standard QCVN 40: 2011/BTNMT (column B).
- To determine the size of 3 main facilities (water works) and the capacity of the
concerned equipment of the water and wastewater treatment plants,
- To estimate the sludge porduction (tons/day) from water and wastewater treatment
plants.

3. Paper mills
Paper mill A has a capacity of 300 tons of products/day. The number of employees working in
the mill is 50 people. The water demand for production is 12 m 3/ton of product. The water
consumption for an employee is 45 l/capita.day.
The raw water taken from Lake D, has the following characteristic:

No. Parameter Unit Value


1 pH - 6.5 – 7.5
2 Turbidity NTU 40
3 Colour Pt-Co 3
4 Alkalinity mg/l CaCO3 80
5 Coliform MNP/100ml 100
And the wastewater quality is presented as follows:

STT No. Parameter Value


1 pH - 7–8
2 Colour Pt - Co 500
3 BOD5 mg/l 3000
4 COD mg/l 5500
5 SS mg/l 800
6 NH4+-N mg/l 10
7 TKN mg/l 100
́8 TP mg/l 20

Questions:
- To determine the design capacity of water treatment plant and to propose a
configuration of water treatment plant to meet the non-drinking water quality
standards QCVN 02:2009/BYT,
- To determine the design capacity of industrial wastewater treatment plant and to
propose the configuration of wastewater treatment plant (including sludge treatment)
to meet the effluent quality standard QCVN 12: 2015 / BTNMT (column B).

3
- To determine the size of 3 main facilities (water works) and the capacity of the
concerned equipment of the water and wastewater treatment plants,

- To estimate the sludge porduction (tons/day) from water and wastewater treatment
plants.

4. Textile mills
Textile mill A has a capacity of 200 tons of products/day. The number of employees working in
the mill is 40 people. The water demand for production is 80 - 240 m 3/ton of product. The
water consumption for an employee is 45 l/capita.day.
The raw water taken from groundwater has the following characteristic:

No. Parameter Unit Value


1 pH - 5.5 – 6.0
2 Fe2+ mg/l 12
3 Mn2+ mg/l 1,2
4 Độ kiềm mg/l CaCO3 25

The characteristic of wastewater is presented as follows:

No. Parameter Unit Value


o
1 Temperature C 40 – 52
2 pH - 8 – 9,5
3 Colour Pt - Co 3000
4 BOD5 mg/l 500
5 COD mg/l 1100
6 SS mg/l 300
7 TKN mg/l 40
8 TP mg/l 6
Questions:
- To determine the design capacity of water treatment plant and to propose a
configuration of water treatment plant to meet the non-drinking water quality
standards QCVN 02:2009/BYT,

- To determine the design capacity of industrial wastewater treatment plant and to


propose the configuration of wastewater treatment plant (including sludge treatment)
to meet the effluent quality standard QCVN 13:2015/BTNMT (Column B)
-

4
- To determine the size of 3 main facilities (water works) and the capacity of the
concerned equipment of the water and wastewater treatment plants,

- To estimate the sludge porduction (tons/day) from water and wastewater treatment
plants.

5. Food processing plant


Food processing plant A has a capacity of 400 tons of products/day. The number of employees
working in the plant is 50 people. The water demand for production is 35 m 3/ton of product.
The water consumption for an employee is 45 l/employee .day.
The raw water taken A taken from river C, has the following characteristic:

No. Parameter Unit Value


1 pH - 6.5 – 7.5
2 Turbidity NTU 40
3 Colour Pt-Co 3
4 Alkalinity mg/l CaCO3 80
10 Coliform MNP/100ml 100

The characteristic of wastewater is presented as follows:

No. Parameter Unit Value


1 pH - 6.5 – 8.5
2 BOD5 mg/l 1500
3 COD mg/l 2500
4 TSS mg/l 500
5 TKN mg/l 250
6 O&G mg/l 100
7 Total P mg/l 40
8 Total coliforms MNP/100ml 10 – 105
4

Questions:
- Determine the design capacity and propose a technological process for the water
treatment system.
- To determine the design capacity of sewage treatment plant and to propose the
configuration of wastewater treatment plant (including sludge treatment) to meet the
effluent quality standard QCVN 12: 2015 / BTNMT QCVN 13: 2015 / BTNMT (column B).

- To determine the size of 3 main facilities (water works) and the capacity of the
concerned equipment of the water and wastewater treatment plants,

5
- To estimate the sludge porduction (tons/day) from water and wastewater treatment
plants.
6. Livestock farm
A swine feedlot in livestock farm A has 2000 heads. The number of officers/employees working
in the livestock farm is 30 people. The water demand for a livestock is from 100 to 120
liters/head/day. The water consumption for an employee is 45 liters/person.day.
The raw water taken from a groundwater well has the following characteristics:

No. Parameter Unit Value


1 pH - 5.7 – 6.5
2 Fe2+ mg/l 5
3 Mn2+ mg/l 0.05
4 Alkalinity mg/l CaCO3 80

The characteristic of wastewater is presented as follows:

No. Parameter Unit Value


1 pH - 7.1 – 8.2
2 BOD5 mg/l 2500
3 COD mg/l 3800
4 SS mg/l 700
5 TKN mg/l 400
7 Total P mg/l 40
8 Coliform MNP/100ml 10 – 109
6

Questions:
- Determine the design capacity and propose a technological process for the water
treatment system.
- To determine the design capacity of sewage treatment plant and to propose the
configuration of wastewater treatment plant (including sludge treatment) to meet the
effluent quality standard QCVN 62: 2016/BTNMT (column B).
- To determine the size of 3 main facilities (water works) and the capacity of the
concerned equipment of the water and wastewater treatment plants,
- To estimate the sludge porduction (tons/day) from water and wastewater treatment
plants.