You are on page 1of 11

Agus Nugraha

CURRICULUM VITAE

NAME : Agus Nugraha

DATE OF BIRTH : August 23, 1968

NATIONALITY : Indonesian

GENDER : Male

ADDRES : Jl. Tohiti no.15 Komplek Puri Sartika, Kel.Tukmudal.


Kec. Sumber, Kab. Cirebon, West Java, Indonesia.

PHONES : 082118910770, 085295764444

EMAIL ADDRES : gus_nug@yahoo.com

SPECIALIST FIELDS OF EXPERTISE: Water Supply, Project Management

QUALIFICATIONS : Engineer Degree (Ir) in Environmental Engineering,


Bandung Institute of Technology, Bandung, 1995.

Master of Engineering Degree (M.Eng.) in


Environmental Science and Technology, IHE – Delft,
The Netherlands, 2002.

MEMBERSHIP OF PROFESSIONAL ASSOCIATIONS AND RELEVANT TRAINING:


IATPI (Ikatan Ahli Teknik Penyehatan dan Teknik
Lingkungan Indonesia / Indonesian Society of Sanitary
and Environmental Engineers)

COUNTRIES OF WORK EXPERIENCE: Indonesia

LANGUAGES AND DEGREE OF PROFICIENCY: Good in spoken and written English

1/10
Agus Nugraha

PROFESSIONAL EXPERIENCES:

July 2019 – to date


Employer : PT. Ciriajasa Engineering Consultant (CEC), joint venture with PT. Inacon
Luhur Pertiwi and PT. Bina Karya (Persero).

Project name : Project Management Consultant Services for Mandalika Urban and Tourism
Infrastructure Project (MUTIP) of Indonesia Tourism Development Corporation
(ITDC) / PT. Pengembangan Pariwisata Indonesia (Persero).
The project calls for the provision of project management services to develop
the Kuta Mandalika into a world class tourist destination which is comparable
to Nusa Dua. The development of the tourism area will be under the Mandalika
Urban and Tourism Infrastructure Project (MUTIP) which requires the provision
of Part I with five major works – one core infrastructure (roads, parking area,
drainage, buildings, water supply-sewerage-irrigation piping network,
firefighting system), two Design-Build-Operate and Maintain (DBOM) Waste
Water Treatment Plant (WWTP) package and Solid Waste Treatment Plant
(SWTP) package and one specialized work which calls for Electricity and
Support Facilities; and Part II infrastructure improvement of four neighboring
sites.

Location : Kuta Mandalika, Central Lombok Regency, West Nusa Tenggara Province
Position held : Deputy Engineering Manager
Duties :
Support and together with Engineering Manager to:
 Prepare Review Design Report
 Support the Project Management Unit (PMU) MUTIP in overseeing and supervision of the
detail design preparation of works of some packages
 Supervise the Construction Management Consultant (CMC)’s engineer/construction
manager in joint review design with contractors for package core infrastructure and Design,
Build, and Operation & Maintenance of the Waste Water Treatment Plant (WWTP) package
the Solid Waste Treatment Plant (SWTP) package.
 Supervise the CMC’s engineer/construction manager in construction supervision of civil
works.
 Support the Project Manager/Deputy Project Manager in preparing regular progress report
in the construction progress.

April 2018 – June 2019 (14 months)


Employer : PT. Ciriajasa Rancangbangun Mandiri (CRM)

1.Project name: Pre-Feasibility Study of SPAM Regional Karian Barat


The aim of the project is to develop Pre-feasibility study of SPAM Regional
Karian Barat. The Sistem Penyediaan Air Minum (SPAM) Karian Barat aims to
improve the reliability of the clean water supply to Kabupaten Serang, Kota
serang, Kota Cilegon and Industries in Kota Cilegon. by building a main clean
(treated water) pipeline and water treatment plant (WTP). The water sources
originated from Karian Dam located in Kabupaten Lebak, Banten Province.
The SPAM Djuanda project is initiated by the consortium of PT. Adhi Karya,
PT. UCS and PT. Krakatau Tirta Industri.
Location : Banten Province
Position held : Water supply engineer
Duties :
 Review the existing water supply system condition.
 Prepare preliminary engineering design of water supply system in the proposed area.
 Prepare Capital expenditures (CAPEX) and Operational Expenditures (OPEX)
 Prepare report.
2/10
Agus Nugraha

2.Project name: Feasibility Study of SPAM Deli Serdang


The aim of the project is to develop Pre-feasibility study of SPAM Deli
Serdang. The Sistem Penyediaan Air Minum (SPAM) Deli Serdang aims to
improve the reliability of the clean water supply to people at Deli Serdang
Regency (Kecamatan Batang Kuis, Lubuk Pakam and Tanjung Morawa) by
building a main clean (treated water) pipeline and water treatment plants
(WTPs). The SPAM Deli Serdang project is initiated by PT. PP
Infrastructure.
Location : Deli Serdang Regency, North Sumatra
Position held : Water supply engineer
Duties :
 Review the existing water supply system condition.
 Prepare preliminary engineering design of water supply system in the proposed area.
 Prepare CAPEX and OPEX

3.Project name: Business Entity Procurement for West Semarang Water Supply System
Public Private Partnership Project.
The aim of the project is assisting the consortium of Cobra Instalaciones
Servicios, S.A., PT Pembangunan Perumahan (Persero) Tbk and PT. PP
Infrastruktur in the preparation of technical proposals to participate in the
tender for the project mentioned above.
Location : Jakarta
Position held : Water supply engineer
Duties :
 Prepare preliminary engineering design and drawing of water transmission and distribution
system in the proposed area (West Semarang).

4.Project name: Review of Pre-Feasibility Study of SPAM Regional Ir. DJuanda (Jatiluhur II)
The aim of the project is to review the feasibility study that has been developed
before. The Sistem Penyediaan Air Minum (SPAM) Djuanda aims to improve
the reliability of the clean water supply to Jakarta and its surroundings
(Karawang Regency, Bekasi Regency, Bekasi City and Bogor Regency) by
building a main clean (treated water) pipeline and water treatment plant (WTP)
will be placed near the source of water at Jatiluhur reservoir which located in
the West Java Province.
The SPAM Djuanda project is initiated by the consortium of MMVP (Mayniland
Water Services inc., Metropacific Water Investment, Varsha zamindo Lestari,
PT. PP (Persero) and PT. PP Infrastructure)
Location : Jakarta
Position held : Water supply engineer
Duties :
 Review the existing water supply system condition.
 Prepare preliminary engineering design of water supply system in the proposed area.
 Prepare CAPEX and OPEX
 Prepare report.

March 2017 – April 2018 (13 months)


Employer : Water.org and PT. Cekindo Bisnis Grup
Project name : water.org - Danone Aqua Initiative for Community Based Organization (CBO)
Program.
The aim of the project is to facilitate Badan Pengelola Sistem Penyediaan Air
Minum dan Sanitasi (BPSPAMS) in rural areas to get loans from banks/
financial institutions in order to develop its services to the community.
3/10
Agus Nugraha

Location : Jakarta
Position held : CBO Program Team Leader
Duties : The main tasks carried out are as follows:
 Responsible for the management of CBO programs
 Conduct CBO Baseline Survey and Mapping; to Identify and assess CBOs, as well as
manage information into databases to be used for CBO strengthening and financing
activities.
 Conduct CBO strenghtening. To cooperate and coordinate with local governments
(stakeholders) under Pokja AMPL, CBO associations and the Government of Indonesia,
strengthen the CBO's potential to ensure that they have basic operational capacity to
improve water and sanitation services, access commercial finance to expand and sustain
long-term operations.
 Realizing CBO financing program
- Manage the participation of banks / financial institutions in the CBO financing program. To
conduct a new bank / financial institution analysis to participate, to evaluate CBO loan
application, to manage all data and monitoring systems, to make the required report.
- Present the potential of CBO investment to banks/financial Institutions, to provide training
and support to banks/financial institutions regarding products and CBO lending
disbursement, to accompany CBO loans.
 Monitor and evaluate the CBOs: to monitor and report on the progress of the CBO program,
financing provided to the CBO, and program impacts to households; to evaluate the
financing program strategy to CBO; to further make the appropriate adjustments to ensure
the goal is achieved.

September 2016 – December 2016 (4 months)


Employer : Project Management Unit (PMU) - Indonesia Infrastructure Initiative (IndII)
Project name : Indonesia Infrastructure Initiative (IndII), Stage 3.
The aim of the project is to assist national and sub-national agencies improve
infrastructure in Indonesia, including water supply and sanitation sector,
funded by Government of Australia through the Australian Agency for
International Development (AusAID)
Location : Jakarta
Position held : Water Supply Engineer
Duties : The objective of the assignment is to conduct business plan training for some
PDAM’s staffs. The main tasks carried out are as follows:
 Prepare materials of Training of Trainer (ToT) for technical aspects of SPAM development,
Real Demand Survey and Environmental Impact Assessment.
 Deliver "ToT" of the said materials to selected PDAMs (as chosen by Directorate PSPAM -
Kementrian PUPR)

October 2014 – March 2016 (18 months)


Employer : PT. Pratiwi Putri Sulung (pratiwi.com), an Engineering, Procurement and
Construction Company in Gas Industry
Project name : Garawangi & Sunyaragi Gas Offtake Station Project, Perusahaan Gas Negara
(PGN).
Location : Garawangi (Majalengka) and Sunyaragi (Cirebon), West Java
Position held : Site Manager and Water Supply System Specialist
Duties :
 Prepare sites prior to the commencement of construction work (to set out the site and
organise facilities), to plan and execute projects in both sites (Garawangi and Sunyaragi
sites) and ensure that they meet agreed specifications, budgets and timescales and to
oversee the construction works.
 Undertake the water supply system assessment, planning and construction for Garawangi
and Sunyaragi Gas Offtake Station Site.

4/10
Agus Nugraha

July 2011 – September 2014 (39 months)


Employer : Development Alternatives Inc. (DAI)
Project name : The Indonesia Urban Water Sanitation and Hygiene (IUWASH) project, a sixty-
month program funded by the United States Agency for International
Development (USAID)
Location : Central Java (July 2011 – October 2012) and West Java, DKI and Banten
(November 2012 – September 2014)
Position held : Urban Water Supply Specialist (LTTA / Long Term Technical Assistant)
Duties : The objective of the assignment is to support increased access to improved
piped water services through the strengthening of the local water service
providers and enhance their relations with all external stakeholders (Local
Government, Local Parliament, Costumers, Civil Society as well as National
Government). Specifically, the Urban Water Supply Specialist will mainly
support the IUWASH Project’s achievement of the water supply related target
under Component Two : “ Improving and expanding capacity of water and
sanitation service delivery”, but also, where required, support program for the
other two IUWASH Components : “ Mobilizing demand forv water supply and
sanitation service delivery” and “ Strengthening policy and the financial
enabling environment for improved water supply and sanitation service
deliver”. The main tasks carried out are as follows:
 Undertake technical assessment in the area of (peri-) urban water supply service delivery
for vthe target locations in Central Java, West Java, DKI and Banten Provinces to identify
existing conditions, main issues, potential demand, possible conflict with other programs
and commitment from the key local stajkeholders (PEMDA, DPRD, PDAM)
 In close collaboration with IUWASH Governance Specialist for Central Java, West Java,
DKI and Banten Provinces, arrange agreements (with action plans, targets, budget sharing)
with local stakeholders on program activities to be supperted by USAID/IUWASH
 Responsible for preparation, implementation, monitoring and reporting of the Urban water
Supply IUWASH program in Central Java, West Java, DKI and Banten Provinces, in line
with approved project proposal and budgets. This includes development ands monitoring of
various Scope of Work (SOW) for field activities, implementation of training programs,
seminars, promotion activities, exchange visits, etc.
 Identify, liaison with and support Local, Provincial, National and International stake holders,
who are (or will be) involved in the implementation of technical (peri-) urban water and
sanitation activities in IUWASH target areas. This includes compilation of a network of other
related donor-supported technical programs for same target groups, including other
programs financed by USAID (like Water SMS, implemented by Pacific Institute).
 Identify opportunities for leverage of funds from other institutions (donors and/or
government) which the aimto increase access to improve water supply, assist parties with
the development of concrete proposals and support implementation
 Support Regional Coordinator with the preparation of IUWASH annual work plans and
budgets for vthe agreed action plans, incorporating the cost-sharing and / or leveraging
local and (where possible) national stakehoklders.

April 2011 – June 2011 (3 Months)


Employer : Siddharta Consulting – KPMG Group associated with PT. Infratama Yakti
Project name : Indonesia Infrastructure Initiative (IndII), Stage 2.
The aim of the project is to assist national and sub-national agencies improve
infrastructure in Indonesia, including water supply and sanitation sector,
funded by Government of Australia through the Australian Agency for
International Development (AusAID)
Location : Central Java.
Position held : Water Supply / Technical Specialist

5/10
Agus Nugraha

Duties : The objective of the assignment is to support preparation of business plan for
PDAM Kota Pekalongan. The main tasks carried out are as follows:
 Conduct the Identification, analysis and evaluation of technical existing condition of several
PDAMs in Central Java Province.
 Determine PDAM Kota Pekalongan’s investment
 Prepare of business plan for PDAMs (technical component)
 Support presentation of PDAMs’s business plan to local and central government.

April 2010 – March 2011 (12 months)


Employer : PT. Selaras Cipta Solusi
Project name : Pre-Feasibility Study of Private Sector Participation in Water Supply
Management in East Bogor and Central Bogor Region – PDAM Kabupaten
Bogor and in Southern Region of Kota Surakarta – PDAM Kota Surakarta
Location : Kabupaten Bogor, West Java and Kota Surakarta, Central Java.
Position held : Water Supply Specialist
Duties : The objective of the project is to assist the PDAM Kabupaten Bogor and PDAM
Kota Surakarta on management and development the water supply facilities in
order to extend the service area and improve the capacity with participation of
private investor. The main tasks carried out are as follows;
 Review the existing water supply system condition.
 Prepare the preliminary engineering design of water supply system in the proposed area.
 Prepare investment needed for 5 years
 Liaise with PDAM Kabupaten Bogor and PDAM Kota Surakarta
 Prepare report

November 2009 – March 2010 (5 months)


Employer : Siddharta Consulting – KPMG Group
Project name : Indonesia Infrastructure Initiative (IndII), Stage 1.
The aim of the project is to assist national and sub-national agencies improve
infrastructure in Indonesia, including water supply and sanitation sector,
funded by Government of Australia through the Australian Agency for
International Development (AusAID)
Location : Central Java and West Java.
Position held : Water Supply / Technical Specialist
Duties : The objective of the assignment is to support preparation of business plan for
PDAM Kabupaten Kudus, Kabupaten Cilacap, Kabupaten Banyumas,
Kabupaten Wonosobo, Kota Pekalongan and Kabupaten Purwakarta. The main
tasks carried out are as follows:

 Conduct the Identification, analysis and evaluation of technical existing condition of several
PDAMs in Central Java Province.
 Determine PDAMs’s investment..
 Prepare of business plan for PDAMs (technical component)
 Support presentation of PDAMs’s business plan to local and central government.

May 2009 – October 2009 (6 months)


Employer : Development Alternatives Inc. (DAI)
Project name : Environmental Services Program (ESP), a sixty-four months program funded
by the United States Agency for International Development (USAID)
Location : North Sumatera
Position held : PDAM Technical Specialist (STTA / Short Term Technical Assistant)
Duties : The objective of the assignment is to support preparation of mid-term
investment plan (RPIJM Penyehatan) for PDAM Kabupaten Langkat, as well
as Technical support for new large master meter system in Medan, including
DED, BoQ, O&M and M&E procedures and training for PDAM, Local NGO
and local community. The main tasks carried out are as follows:
6/10
Agus Nugraha

1. Prepare Mid-term investment plan of PDAM Kabupaten Langkat:


 Conduct the Identification, analysis and evaluation of existing condition PDAM Kab
Langkat
 Determine investment needs based on future projected growth and income.
 Prepare of investment plan for PDAM (technical and institutional component)
 Prepare of final report of review mid-term investment plan for PDAM Kabupaten Langkat
 To support presentation mid-term plan to Local and Central government
2. Technical support for new water for poor master meter system in Medan: (Collaboration
with JKM, financed by ECO-Asia and PDAM Tirtanadi)
 Support JKM (a Non-Government Organisation) and CBO (Community Based
Organisation) in Detailed Engineering Design and Bill of Quantities for new master
meter locations and construction pipe network behind master meter.
 Develop and implement monitoring and evaluation system for the construction phase of
the master meter systems for 3,500 new connections, in collaboration and agreement
with Local Government, who will finance the construction after the master meters
 Provide training for the proper monitoring of construction phase by JKM and new CBO,
including regular reporting of problems to PEMKOT.
 Support JKM and CBO with training in O & M procedures for new master meter systems
 Write-up of a master meter construction monitoring system, including roles and
responsibilities of all stakeholders (NGO, CBO, PDAM, PEMKOT) to be included in ESP
water-for-poor toolkit.

June 2004 – March 2009 (58 months)


Employer : GHD Pty. Ltd in association with PT. Prismaita Cipta Kreasi
Project name : The Second Water and Sanitation for Low Income Community (WSLIC–2)
Location : Kabupaten Cirebon, Jawa Barat.
Position held : District Coordinator and Water Supply & Sanitation Specialist
Duties : The objective of the project is to assist the local community in Kabupaten
Cirebon, West Java to get clean water service and to improve the sanitation
condition in order to improve the of the local community health. The main tasks
carried out are as follows:

 Carry out strategic planning, coordinating and facilitating the input of WSLIC-2 project
activities for Water Supply and Sanitation (WSS) with Ministry of Public Work (MoPW) and
other local government.
 Provide technical backstopping to Community Facilitators - Water Supply and Sanitation -
(CF-WSS) to carry out the Rapid Technical Assessment (RTA), develop a set of technology
options, estimate the cost of each option, and assist the Village Implementation Team (VIT)
- a Community Based Organisation - to choose the option of the best fits their
circumstances
 Assure that the preliminary design for WSS facilities, initial environmental evaluation, and
cost estimates, economic and financial analysis, and the initial tariff estimates meet the
standard.
 Participate and provide technical backstopping for CF-WSS in the presentation of RTA
result and (Detailed Engineering Designs (DEDs) to communities
 Review Community Action Plans (CAPs) for the approval of District Project Management
Unit (DPMU), and assist the community to make modifications or improvement.
 Provide technical training to CF/WSS in reading simple engineering drawings,
understanding technical design limitations, etc, as necessary.
 Assure that activities proposed relating WSS system as part of the CPA meet the standard
 To provide technical backstopping and monitor of CF-WSS in supervising construction, and
verifying work progress in both quality and quantity.
 Review and approve any proposed design changes may have performance implications

7/10
Agus Nugraha

 Provide technical backstopping to CF-WSS when they provide specialized technical training
to VIT staff and community members at large in the interpretation of engineering drawing
and other training necessary.
 Work with local skilled laborers to built demonstration family latrines, and help the VIT to
establish the sanitation fund, the rules of its used, and help for local workers to become well
established in the latrine construction business.
 Assure of the technical effectiveness of the O&M of WSS system.
 Provide technical and management training to Village Implementation Team (VIT) regarding
simple engineering drawings, how to operate and maintain the built WSS facilities, how
determine the water tariff, etc, as necessary.
 Assist Dinas Kesahatan (District level) in workshop/training of capacity building for Badan
Pengelola Sarana Air Minum dan Sanitasi (BPSAMS).

October 2002 – May 2004 (20 months)


Employer : PT. Prismaita Cipta Kreasi
1.Project name : Pre-Feasibility Study of Private Sector Participation in Water Supply
Management in Kecamatan Curug and Legok – Kabupaten Tangerang
Location : Tangerang, Banten.
Position held : Water Supply Engineer
Duties : The objective of the project is to assist the local government on management
and development the water supply facilities in order to extend the service area
and improve the capacity with participation of private investor. The main tasks
carried out are as follows;
 Conduct a real water demand survey of community.
 Review the existing water supply system condition.
 Prepare the base maps and available data proceeding the field inspection and site surveys
for the water supply network systems and water resources
 Analyze data and determine design criteria
 Prepare the preliminary engineering design of water supply system in the proposed area.

2.Project name : Feasibility Study of Private Sector Participation in Water Supply Management
in Tegal
Location : Tegal, Central Java.
Position held : Water Supply Engineer
Duties : The objective of the project is to assist the local government on management
and development the water supply facilities in order to extend the service area
to rural areas surroundings Tegal and improve the capacity with participation
of private investor. The main tasks carried out are as follows;
 Survey the willingness to connect of the community to piped water
 Review, study and evaluate the existing data and water supply system design
 Review characteristic and condition of water supply facilities
 Prepare the preliminary engineering design of water supply system

3.Project name : Rural Water Supply and Sanitation Development Project


Location : Kabupaten Tegal and Pekalongan, Central Java
Position held : Water Supply and Sanitation Engineer
Duties : The objective of the project is to assist the local community to get clean water
service and to improve the sanitation condition in order to improve the of the
local community health. The main tasks carried out are as follows;
 Review and evaluate the existing WSS including management system, financial status,
valuable assets, WSS networks, problems/constraint, and WSS demand.
 Study the possibility of the WSS capacity development for the potential rural settlements
including water resources, and analyze the water tariff which suitable for the rural
communities.

8/10
Agus Nugraha

 Carry out field survey for preparation of detail engineering design (DED) of WSS facilities
development, including the construction cost. The facilities comprises of pipe distribution
networks, water treatment plant, main reservoir, latrines, drainages, etc.
 Prepare the guideline of OM System.
 Design and prepare the public campaign and promoting system for local communities
regarding the improvement of the community health in line with the WSS program
development.
 Prepare the community participation system in the planning and developing the WSS
program.
 Prepare training program development for trainers, community facilitator, local community to
be involved in the program implementation, including Training Needs Assessment (TNA),
preparation of training curriculum/modules, set out training implementation program,
coordinate the training preparation which include logistics, accommodation and
transportation of the participants, and the trainers. Develop monitoring and evaluation of the
training program.

September 1999 – October 2001 (26 months)


Employer : PT. Thames Pam Jaya
Project name : New investment Project in several areas
Location : Jakarta.
Position held : Project Assessment Engineer at Capital Planning Departmen
Duties : The objectives of the project are to improve the level of service to community.
The main tasks carried out are as follows;
 Analyse and assess the benefits from the proposed projects and prepare reports regarding
new investment project
 Review the result of field survey and verification in relation with engineering design
purposes
 Monitor the projects implementation progress

March 1999 – August 1999 (6 months)


Employer : PT. Yasa Karsa Graha
Project name : Jakarta Wastewater Disposal Project
Location : Jakarta
Position held : Sanitation and Sewerage Engineer
Duties : The objective of the project is to improve the condition of sanitation facilities
and sewerage system. The main tasks carried out are as follows:
 Review, study and evaluate the existing data and design of sewerage system and
sanitation condition
 Survey characteristics and condition of sewerage and sanitation facilities to be improved
 Prepare the sewerage engineering and sanitation design

May 1997 – January 1999 (20 months)


Employer : PT. Pratiwi Putri Sulung
1.Project name :Supervision of Water Supply Construction Project for Housing Complex
Perum Perumnas (National Urban Development Corporation) Parung Panjang
- Bogor, West Java, Stage II, capacity 100 l/s.
Location : Bogor, West Java
Position held : Site Engineer
Duties : The objective of the project is to give the clean water service for people in
Housing Complex Perum Perumnas. The main tasks carried out are as
follows;
 Supervise the implementation pipe laying work
 Control the material issued, used and returned
 Complete the administration of project

9/10
Agus Nugraha

2.Project name : Feasibility Study of Private Sector Participation in Water Supply Management
in Palembang
Location : Palembang, South Sumatra
Position held : Water Supply Engineer
Duties : The objective of the project is to assist the local government on management
and development the water supply facilities in order to extend the service area
to rural areas surroundings Palembang and improve the capacity with
participation of private investor. The main tasks carried out are as follows;
 Survey the willingness to connect of the community to piped water
 Review, study and evaluate the existing data and water supply system design
Review characteristic and condition of water supply facilities
 Prepare the preliminary engineering design of water supply system.

November 1995 – February 1997 (16 months)


Employer :PT. Arkonin Engineering
1.Project name : Detailed Engineering Design of Rural Piped Water Supply Project in 5 (five)
Kabupatens in West Java
Location :Kabupaten Sumedang, Kabupaten Majalengka, Kabupaten Garut, Kabupaten
Tasikmalaya, and Kabupaten Kuningan.
Position held :Water Supply Engineer
Duties :The objective of the project is to assist community to get clean water service.
The duties are as follows:
 Review the existing condition of water supply system
 Conduct field inspections and site surveys
 Prepare the detailed engineering design, technical specification and construction drawing
for water supply pipelines

2.Project name : Detailed Engineering Design of Water Distribution System for Housing
Complex Kota Wisata, Cibubur, Bogor, West Java, capacity 20 l/s.
Location : Cibubur, Bogor
Position held :Water Supply Engineer
Duties :The objective of the project is to give the clean water service for people of
Housing Complex Kota Wisata, Cibubur, Bogor. The main tasks carried out
are as follows;
 Calculate water demand of the population
 Prepare detailed engineering design and construction drawing for water supply system
 Assist in preparation of tender document in particular responsible for technical specification
of pipelines.

REFERENCES

1. Ir. Ikhwan Bustami, MSc


Project Manager
Project Management Consultant (PMC)
Mandalika Urban and Tourism Infrastructure Project (MUTIP).
Jl. Rinjani, Palem, Kel. Leneng, Kec. Praya, Central Lombok Regency,
West Nusa Tenggara Province
Phone: 0370 6504857
Mobile: 081265013867
Email : ikhwan_b@yahoo.co.id

10/10
Agus Nugraha

2. Ir. Leo Gunardi


Technical Manager
PT. Ciriajasa Rancangbangun Mandiri (CRM)
Jl. Ampera III/34, Jakarta Selatan
Phone: 021 78845421
Mobile: 08179133114,
Email: leo_gunardi@yahoo.com

3. Rachmad Hidayad, ST
CBO Program Senior Project Manager
Water.org
Ratu Plaza Building, 26th. floor
Jl. Jenderal Sudirman, Jakarta, 10270
Phone: 021 27513630
Mobile: 081392281177,
Email: rhidayad@water.org

Certification:
I, undersigned, certify that the best of my knowledge and belief, these data correctly describe
me, my qualifications and my experiences.

Agus Nugraha

11/10

You might also like