The document outlines a quality plan with 6 main topics including purpose, definitions, responsibilities, and a quality plan with 11 subtopics. The quality plan covers requests for information, non-conformance reports, work control systems, site orientation, inspection and test plans, bolted flange tagging, insulation, welding, cleaning standards, and defect management. Responsibilities may need to be combined with contractor details. Further information is required to execute the non-conformance report and insulation subtopics.
The document outlines a quality plan with 6 main topics including purpose, definitions, responsibilities, and a quality plan with 11 subtopics. The quality plan covers requests for information, non-conformance reports, work control systems, site orientation, inspection and test plans, bolted flange tagging, insulation, welding, cleaning standards, and defect management. Responsibilities may need to be combined with contractor details. Further information is required to execute the non-conformance report and insulation subtopics.
The document outlines a quality plan with 6 main topics including purpose, definitions, responsibilities, and a quality plan with 11 subtopics. The quality plan covers requests for information, non-conformance reports, work control systems, site orientation, inspection and test plans, bolted flange tagging, insulation, welding, cleaning standards, and defect management. Responsibilities may need to be combined with contractor details. Further information is required to execute the non-conformance report and insulation subtopics.
1. RFI 11 , attachment 19-20 2. LWR 11 - to get flow and form from ayu 3. NCR - IN PROGRESS. NEED MORE INFO FOR EXECUTION 4. WCS 12, attachment 25-40. We have 16 types of WCS. UPV 2, PSV 1, RD 1, Process 3, Rotating 1, E&I 6, MOC 2 5. SOE 12 6. ITP 13 7. BOLTED FLANGE - TAGGING TO BE REVISED 13, attachment 41-45 8. INSULATION - IN PROGRESS 9. WELDING 14 10. CLEANING AND STRANDARD REQUIREMENT 15 attachment 49-51 11. DEFECT MANAGEMENT 17