Optimizing Operation & Maintenance

Practices for Solar Power Plant


London
UNITED KINGDOM

Paris
FRANCE

Soria – Global HQ Tokyo


SPAIN JAPAN

Rome
Mexico City ITALY
MEXICO
Msida
MALTA
Ahmedabad
INDIA
Quito
ECUADOR Abu Dhabi
UNITED EMIRATES
Lima
PERU

SanTago de Chile
Chile Cape Town
SOUTH AFRICA

INDIA31MW JAPAN45MW FRANCE9MW


ITALY122MW SPAIN66MW UK32MW
30 MW already under operation in India
300+ MW under O&M negotiation
Following ISO9001 / ISO14001 procedures globally

Shareholders
Solarig: 300+ MW of Global O&M Portfolio
Gensol: 2 GW+ Technical Advisory Portfolio
Eras of Indian Solar

Indian Solar History can be broadly


divided into 5 ERAs
2009 – 2011

Bold Risk Takers


2011 – 2012

Opportunists
2012 – 2013

Penny Pinchers
2014 – 2015

Mammoths
2015 – onwards

Operators
What is O&M for Solar?

Preventive Maintenance
þ
Correctve Maintenance

Proactive Maintenance
ý
Preventive Maintenance
What is it? - Works defini>on and scheduling plan

Objectives - Minimize downTmes


- Enlarge lifeTme of the equipment
- Minimize Risks (H&S, Security, etc)
- DetecTng faults for claims

When? - In low irradiaTon periods


- According to meteorological condiTons

Needs - Schedule Plan & Trained staff


- Tools and auxiliary machinery
- Management of work orders / Spare Parts
- IT Pla`orm


Corrective Maintenance
What is it? - ResoluTon of incidences

Objectives - Minimize downTmes


- Increase Availability & Performance Ra>o

Factors - Incidences Protocols incorporated
- Spare Parts available
- Trained team
- Warranty Manufactures

Needs - Monitoring System


- Tools and auxiliary machinery.
- Management of work orders/Spare Parts
- IT Pla`orm
Proactive maintenance
What is? - Analysis for detecTng underperformances

Objectives - Avoid hidden defaults & losses


- Enlarge lifeTme of the equipment
- Minimizes risks
- ProducTon increase

How? - Due Diligences


- Analysis of electrical parameters
- Trends evaluaTons & Comparisons

Needs - Specialized Tools & IT management


- IV, Analyzer PV, Thermographic Camera…
- Specialized Team
Factors Impacting Production Losses

What really contributes to the loss of


generation and how much?
Factors of the Production Losses

Design & Construction O&M Environmental Factors


•  Near shadings: irradiance loss •  Soiling loss factor •  Near shadings: irradiance loss
•  IAM factor •  System •  IAM factor
•  Shadings: Electrical loss acc. to string unavailability •  PV loss due to irradiance level
•  LID-Light Induced DegradaTon •  PV loss due to temperature
•  Module array mismatch loss •  Shadings: Electrical loss acc. to
•  Ohmnic wiring loss string
•  Inverter loss during operaTon •  LID-Light Induced DegradaTon
(efficiency)
•  Inverter loss over nominal inv. power
•  Inverter loss due to power threshold
•  Inverter loss over nominal inv. voltage
•  Inverter loss due to voltage threshold
•  AC ohmnic loss
•  External transfo loss
% Outages/events vs Energy losses
Source: Solarig

40%

% Energy loss % Events

30%

20%

10%

0%
Suppliers & Design & External CommunicaTon O&M Others
Manufactures EPC Factors Factors
% Outages/events vs Energy losses
Source: Solarig

40%

% Energy loss % Events

30%

20%

10%

0%
Suppliers & Design & External CommunicaTon O&M Others
Manufactures EPC Factors Factors

Considering an expert O&M Company


Analysis corrective incidence
Source: Solarig

50%

% Energy loss % Events

40%

30%

20%

10%

0%
Inverters DC Side External Grid Meter Transformer Others
Factors
Lessons Learnt

Lessons Learnt over last 10 years of


Global O&M Experience
EOL IS
COMING
Set up Common Wastage
Failures Failures Failures
Failures Level

Basic O&M

With a professional
O&M company

COD PPA Term (years)


© 2015 Solarig Holding 20 years
20
SCALE COUNTS
Alfaro
LA RIOJA

Soria - HQ
SORIA
Perugia
UMBRIA
Cuneo Ancona
PIEMONTE MARCHE
Terni
Cillamayor
PALENCIA UMBRIA
L’Aquila
Matapozuelos Almazan
Arezzo ABRUZZO
VALLADOLID Tozalmoro TOSCANA Isernia
SORIA
MOLISE
Arroyomolinos Viterbo Foggia
MADRID LAZIO PUGLIA
Roma - Italia HQ Brindisi
Trujillo LAZIO PUGLIA
CÁCERES
Ledaña LaTna Lecce
CUENCA LAZIO PUGLIA

Potenza
Abanilla
MURCIA BASILIC
ATA
Vibo Valencia
Agrigento CALABRIA
SICILIA

Siracusa
SICILIA

© 2015 Solarig Holding 21


PV Plant PV Portfolio
External factors
- Claims Force
- Suppliers Force
Results
- Contractors efficiency • Saving Costs
Internal factors
• Shorter Response
- Spare Parts Management Time
- Trained Technical Personnel • Higher Performance
- Staff costs repercussion
- Sophis>cated Tools investment
• Comparable PR´s
- IT PlaUorm (CMMS) • Major Profits for Client

A PV PORTFOLIO NEEDS A PROFFESIONAL COMPANY


02 | O&M – Upgrading Plans

ACTING
LOCALLY
© 2015 Solarig Holding 23
RESPONSIBLE
BACKTOBACK

© 2015 Solarig Holding 24


EPC vs O&M

© 2015 Solarig Holding 25


IT PLATFORM

BACK OFFICE KEY


PLAYERS

FIELD SERVICE

© 2015 Solarig Holding 26


A professional Company

Preventive
Monitoring
Maintenance
System Corrective
Maintenance

Technical
Reports

CMMS Insurance
Management

Work orders
Management
Assets
Management
KPI Inventory
Control Management
Solarig Gensol Utilities Pvt. Ltd

108, Pinnacle Business Park


Opp. Royal Arcade, Prahladnagar
Ahmedabad – 380015, Gujarat, India

Tel +91 79 40068235

Email: puneetjaggi@solariggensol.com
M: +91 99980 25820