You are on page 1of 1

GRTA TIE IN SCOPE- NDT PLAN

RT LAMINATIO Time/ Joint


TIE-IN TIE-IN NO. OF Welding Completion NDT Total Time
Sl.No TIE-IN TYPE JOINT CONFIGURATION LOCATION Planned N CHECK Minutes RT Crew REMARKS
NUMBER PERIOD JOINTS Time METHOD Minutes
Date STATUS

Considering set up plan shall


be dveloped before
151A-TEE TO PIPE
1 TP-151A/B GRTA 1 1/2" Welded, Sch 80 2 Unit-22 1/30/22 9:30 PM 31-Jan-22 Completed PAUT 30 mints / jt 60 UT Crew-01 proceeding to site and post
151B-PIPE TO PIPE
examination interpretation
shall be done off-line #REF!
57A-TEE TO PIPE
2 TP-060A/B GRTA 2" Welded, Sch 80 2 Unit-51 1/31/22 12:00 AM 2-Feb-22 Completed PAUT 30 mints / jt 60 UT Crew-01
57B-PIPE TO PIPE #REF!
Unit-51 Pipe
3 TP-039A/B GRTA 2" Welded, Sch 80 2 PIPE TO FLANGE 1/31/22 2:00 PM 2-Feb-22 Completed PAUT 30 mints / jt 60 UT Crew-01
rack #REF!
Unit-53 Pipe
4 TP-071 GRTA 2" Welded, Sch 80 1 FLANGE TO PIPE 1/30/22 9:00 PM 3-Feb-22 Completed PAUT 30 mints / jt 30 UT Crew-01
rack #REF!

5 TP-045 CRUDE 3/4" Welded, Sch80 2 FLANGE TO PIPE Unit-51 1/20/22 4:30 PM 21-Jan-22 Completed PAUT 30 mints / jt 60 UT Crew-01
#REF!

6 TP-220A/B RFCC 1 1/2" Welded, Sch 80 2 FLANGE TO PIPE Unit-53 1/21/22 4:30 PM 22-Jan-22 Completed PAUT 30 mints / jt 60 UT Crew-01
#REF!
TOTAL 11 0 0

#REF! #REF!

#REF! #REF!

Minutes Hours
0 0

You might also like