From: AP(IE&PP) Frequency : Monthly

To : VP(Steel) Date : 01.02.11


Sub. Raw Materials Constraints for Feb.'11 onwards Prod. & Desp. Plan of Structural Items
Please confirm ETA(at AW/SW/PW) for under-mentioned Raw Materials so that we can finalise Prod./Desp. Plan :-

Raw Materials Constraints for


As per Memo
Total
dt.03.12.10
Sl. Total Wt. Shortage ETA
Contract Item Fabricator Ref. MRS No. of VP(Steel),
No. (MT) Feb.'11 Qty. (at AW/SW/PW)
Proc. Lead Time
Prod. (MT)
(in Weeks)

A. Agarpara Works
1 Subansiri, Rail-arrgt.of 150T GC for 40 33 33 RS 329 dt. 22.10.09 2-8 To be despd. alongwith 150T
116/8801 Intake Bulkhead Gates GC[i.e.in Apr'11]

2 - do - 150T GC for 169 8(8T), 10(4T),25(4T), 32(2T) 18 18 RS 343 dt. 05.11.09 - do -


Intake Bulkhead Gates(2 Sets) mm Plates

3 - do - Ropedrums for 150T GC of 30 22(0.8T) & 80(29T)mm Plates 30 30 AC 354 dt. 11.11.09 - do -
Intake Bulkhead Gates(4 nos.)
4 - do - Anchor Plates for Dogging Arrgt. for Intake 2 25(1.7T),16(0.3T) & 2 2 JK 2159 dt. 18.12.10 - do -
Service Gates(8Sets) 40(0.2T)mm Plates and 16mm
dia. Round(0.1T)
5 - do - Anchor Plates for Dogging Arrgt. for Intake 2 - do - 2 2 JK 2278 dt. 30.12.10 - do -
Bulhead Gates(8Sets)
6 - do - Add-on Qty. for 1st Stage EP for RG 7 200x200x20mm Angle(6.6T) 8 8 AC 2227 dt. 24.12.10 - do -
(9 Sets) & 50x16mm Flat(1.3T)
7 Dagachhu, 1st Stage EP 9 MRS Qty. 9 9 JK 2468,2470,2471,2472 & - do -
116/8986 2474 dt. 17.01.11 and
2482 dt.18.01.11
Total(AW) 259 69 - 33 102
B. Sodepur Works
8 Subansiri, Wall Plates for RG(9 Sets) 130 20(13T),12(4T),10(0.5T), 21 101 122 SA 1020 dt.10.08.10 & 8-10
116/8801 16(2.5T) & 25(0.2T)mm Plates 1612 dt.13.10.10
and 50x8(0.4T)mm Flat

9 - do - (i)MS Components of 1,261 16(11T),25(6T),32(6T), 41 278 706 1,025 Vicky 1264 dt.10.09.10 2-8
Skin Plate Assy.(9 Sets) 28(1.5T),42(2.5T) & 50(2T)mm
Plates and
150x150x16(12T)mm Angle

10 - do - (ii)Clad Plates of Bal. Qty. of 3rd & 4th Sets 8 92 174 274 - do - 253R2 dt.24.12.09 24-28
Skin Plate Assy.(bal.7 out of 9 Sets) 1846 dt.14.11.10
11 TLDP, TRCM 20 16(1T)mm Plate and 2 2 Kinsman 630 dt.26.06.10, 2-4
116/8743 ISMC200(0.4T),ISMC300(1T) 650 dt.30.06.10,
1213 dt.03.09.10,
1214 dt.03.09.10,
1501 dt.01.10.10,
1558 dt.06.10.10 &
1747 dt.02.11.10

Total(SW) 1,412 72 471 880 1,423

C. Panihati Works
12 Subansiri, 2nd Stage EP for 373 16(5T),40(18T), 28 55 22 105 Kinsman 776 dt. 30.07.10, 4-8
116/8801 Spillway Bulkhead Gates(9 Sets) 50x8(0.4T),75x10(2T), 821 dt. 22.07.10,
ISMB 500(3T) 835 dt. 23.07.10,
1266 dt. 10.09.10,
1288 dt. 12.09.10,
1332 dt. 18.09.10,
2268 dt. 28.12.10

13 - do - Rad. Arms for RG(9 Sets) 1,403 33% of MRS Qty. 467 467 481 1,415 ? 1145 dt.27.08.10 & 10-12
1925 dt.23.11.10
14 - do - Breast Wall Liner for 51 25mm Fe490(41T), 56 56 ? 1212 dt.03.09.10 2-12
Spillway Bulkhead Gates(9 Sets) 12(12T) & 50x16(3T)
15 - do - Groove Covers for 21 MRS Qty. 21 21 Bhola 1210 dt.03.09.10 2-8
Spillway Bulkhead Gates(9 Sets) (offloaded)
Total(PW) 1,848 572 522 503 1,597
Grand Total 3,518 713 993 1,416 3,122

Critical Input Shortages for Feb.'11 & Mar.'11 Prod. Plan

Copy to : President,Mrs.K.Sengupta,CE(HEW),SVP(E&M)-Strl.,SVP(PE&PD),VP(E&M)-Strl.,AP(Mktg.)-Strl., AP(W)-NRS


C:\Strl\Outgoing\Constraints\51844596.xls