You are on page 1of 1

HAIL SURFACE FACILITIES EPS PROJECT

Project Number: 8598 Location - Mubarraz Island

Request No. TF-71 RT REQUEST 17/Jul/17

Joining Elements
Final
Sr. Dwg no./Rev Rev WPS No Process Welder ID Joint No. Dia(In) Sch/ Thk Schedule Material Visual Module Area Remarks
No. (mm) (Viz,PipeFlg,Pipe- (Acc-Rej)
Elb,Etc)

1 HD-EC-TF-P5099-001 1 TR 239 GTAW TW-1655 FW-14M 3.00 3.05 INCOLOY 825 elbow to pipe Acc TF-AP-999 FULL SIGMENT

2 HD-EC-TF-P5099-001 1 TR 239 GTAW TW-1655 FW-16M 3.00 3.05 INCOLOY 825 elbow to pipe Acc TF-AP-999 FULL SIGMENT

3 HD-EC-TF-P5099-001 1 TR 239 GTAW TW-1655 FW-16-1 3.00 3.05 INCOLOY 825 Pipe to pipe Acc TF-AP-999 FULL SIGMENT

4 HD-EC-TF-P5100-601 0 TR 239 GTAW TW-1667 FW-04 3.00 3.05 INCOLOY 825 Pipe to Elbow Acc TF-PAR-612 FULL SIGMENT

Acceptance Criteria ASME B 31.3, 2016

IDENTIFICATION ON FILM AS FOLLOWS: ADOC/8598/ MUB/ DWG NO/PROCESS/WPS NO / WELDER ID/PIPE X THK/DATE
Name
Signature
Date

Page 1 of 1

You might also like