HAZARD/RISK Initial

risk Existing Controls ADDITIONAL CONTROL MAEASURE Residual Action by


rating Rating

Material Delivery & Offloading Avoid manual shifting if possible


and use safe manual handling
Manual handling techniques
Failure, Fall of materials, Ensure good housekeeping in the
area and remove all un wanted
Dangers from reversing materials and equipment’s.
maneuver vehicle while un
loading, Ensure that area is free from any
tripping hazards.
Poor working posture/
Conduct site inspection to ensure
Ergonomics hazards resulting cut access
and fractures
Body injuries

Damage to property.
Sprain/back
Pain/stress

Project Name:
Company Nam:
Activity: Water Proofing RISK ASSESMENT