Activity Hazard Pre Control Risk Assessment Control Procedures Post Control Risk Assessment
No Description Probability Consequence Rank Probability Consequence Rank
CONCRETE POURING, FORM WORK AND REBAR WORK ( CUTTING & BENDING )
Almost Certain
Consequence expected to occur in most
Occurs weekly Almost Certain High High Extreme Extreme Extreme
circumstances
Likely
Consequence will probably occur in most
Occurs every month
Likely Moderate High High Extreme Extreme
circumstances
Possible Consequence should occur at some time Occurs once every 6 months Possible Low Moderate High Extreme Extreme
Unlikely Consequence could occur at some time Occurs once every 5 years Unlikely Low Low Moderate High Extreme
Consequence may occur under exceptional
Rare Occurs once every 10 years Rare Low Low Moderate High High
circumstances
Consequence Injury Description Cost Estimation NOTE: Basic Tasks should not be included in the 14 day look ahead. Instead, the
Critical
Multiple fatalities and irreversible disability
>US$1 Million focus should be on those tasks identified during the period which pose a significant
(>30%) to one or more personnel
risk/hazard etc. The look ahead should represent the actual work being completed or
Single fatality and/or severe irreversible
Major >US$100,000
disability (>30%) to one or more personnel. scheduled for completion within the next 14 day period. Tasks identified as having a
Moderate
Irreversible damage or impairment (,30%) to
>US$10,000 consequence severity of High or above should be supported with written procedures
one or more personnel
Reversible disability/impairment or injuries
and or detailed work method statements. Assistance in the development of this look
Minor >US$1,000
requiring medical treatment ahead may be sort from the relevant Fluor Safety Engineer.
Low level damage/injury . No medical
Low >US$100
treatment. (First Aid etc)