JSA (Job Safety Analysis) Sheet

Activity Name:-Reinf cutting/bending Ref-

Location:- Date :

Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures

Untrained worker,lack Only inducted worker shall be deputed at the work place.
1 Manpower Mobilization Personal injury
of skill awareness
Given Tool Box Talk to all workers.
Use of basic PPEs.
Train worker in bar cutting operation.
Only authorised persons should carry out Cutting and
bending operation.

Handgloves shall be provided and its use shall be monitored.

Ensure proper housekeeping is maintained around work area.


Reinforcement cutting & Failure of emegency Scrap shall be segregated in isolated area.
2 Personal injury
bending switch Regular checks & obtaining fitness certificate of the cutting
and bending machine.
Ensure display equipment inspection tag on
cutting and bending machine.
Ensure display of bar size and quantity on cutting/bending
machine and strictly follow the same.
Only trained operaator should appoint.
Checking of Emergency switch, panel board, Starter, guard,
earthing,RCCB
Night work permit to be taken from concern engg.and safety
Darkness, fall of dept.
Personal injury, Ensure proper illumination during dark hours.
3 Work during dark hours person, fall of Electrical cable should lead min 2 m height. No exposed
damage to property
machinery electrical wire.Earthing.
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :___________ Name & Signature of Site In-charge :______

Name & Signature of Project In-charge :__________ Name & Signature of SPCL Safety Officer : ___