JSA No 22EGOM-ENCO-JSA-02
EPC-3 Offsite facilities project, Duqm Refinery JSA Creation Date 03.07.2022
Job Safety Analyses Revision No 01
Revision Date 03.07.2022
Scope- Fire water pipe lines Installation works Completed By Iftikhar Malik
02 Drilling activity Defective tools Ensure hand power tools inspected by competent person and Site Supervisor
Noise color coded Foreman
Drill bit broken Ensure only competent person operate tools Store In-charge
Defective material removes from the site HSER
During drilling apply the water to lubricate the drill bit
Use wet method whenever possible to prevent dust, If not
possible wear respiratory protection
Wear adequate PPE
03 Gas cutting Unsecured gas cylinders, If not in use, gas cylinders shall be stored properly on designated Site manager
Improper connections and storage shelter with protective valve caps, proper signs posted, Site Engineer
damaged hoses, secured by chain and marked “FULL or EMPTY”. Site Supervisor
Fire and personal injury, All compressed gas cylinders must be kept in trolleys while Foreman
transported or in use. Electrician
ENCO-Job Safety Analysis Page 1 of 5
Company Encogroup
JSA No 22EGOM-ENCO-JSA-02
EPC-3 Offsite facilities project, Duqm Refinery JSA Creation Date 03.07.2022
Job Safety Analyses Revision No 01
Revision Date 03.07.2022
Scope- Fire water pipe lines Installation works Completed By Iftikhar Malik
04 Cutting, Grinding and Welding works Equipment failure Ensure that all equipment being used bear the current color- Site manager
(Diesel welding generator and Faulty connections and coded inspection tag/sticker and calibrated by authorized person Site Engineer
burnt welding cables. Provide standby fire extinguisher. Site Supervisor
ENCO-Job Safety Analysis Page 2 of 5
Company Encogroup
JSA No 22EGOM-ENCO-JSA-02
EPC-3 Offsite facilities project, Duqm Refinery JSA Creation Date 03.07.2022
Job Safety Analyses Revision No 01
Revision Date 03.07.2022
Scope- Fire water pipe lines Installation works Completed By Iftikhar Malik
Electrical welding machine) Improper PPE Barricades and warning signs in place. Foreman
Broken or bad isolation on Turn off machines at the end of each shift. Electrician
electrode handles. Any tool found damaged must tagged “Do Not Use.” HSER
Coiled cables building up Oil drip tray to be provided for diesel welding generator
heat Competent electrician to inspect all electrical connections.
Earthing Repair all faulty connections immediately
Electrocution, fire Competent electrician to inspect all electrical connections
Personal injury, trip, slip Ensure all the welders wearing proper PPE (Protective clothing,
and fall helmet attached welding shield, Fire resistant hand gloves for tig
Welding booth covering and Argon, full set apron)
for pipe welding All defective electrode handles shall be replaced immediately.
Welding rods not left in the rod holder while not in use.
Rod stubs are to be put in metal container
Inspect and roll out and fully uncoiled cables.
Elevate cables properly and remove after use
Earth cable to be connected as close as possible to welding
operation.
Ensure that grounding is correct at all times
Secure hot work area with fire blankets and have a standby fire
extinguisher.
Assign a trained fire watcher who will monitor the hot work
activity and stay at least 30mins after work completion
Welding shall not be done in wet area.
Ensure no flammable materials or liquids are present or near the
vicinity.
Ensure during welding working platform covered with fire
blanket
Fire watcher should monitor hot work location
Always keep access ways free of loose materials, tools and
equipment.
Maintain good housekeeping and proper material management.
Elevate cables properly and must not pose obstruction on any
work location
Ensure all welding butts are kept in metal container
Proper housekeeping work area
Use only fire retardants tarpaulin for welding booth covering
purpose
Ensure hot work area fully covered with fire retardant
tarpaulin /fire blanket
Hot work check list to be filled and displayed work location
ENCO-Job Safety Analysis Page 3 of 5
Company Encogroup
JSA No 22EGOM-ENCO-JSA-02
EPC-3 Offsite facilities project, Duqm Refinery JSA Creation Date 03.07.2022
Job Safety Analyses Revision No 01
Revision Date 03.07.2022
Scope- Fire water pipe lines Installation works Completed By Iftikhar Malik
05 Emergency procedure Personal injury Any accident/emergencies shall be reported to ENCO first aider Site manager
Traffic accident &site supervisor. ENCO HSE Advisor will take control of situation Site Supervisor
Gas release from and report to SAIPEM HSSE within 30 minute or less Foreman
neighbour plant Initial written notification of accident, incident or Near miss to First Aider/Nurse
SAIPEM HSSE within 12 Hrs. or less HSER
All personal to be aware of possible gas leaks from neighbour
plant and be ready to immediately evacuate the job location to a
safe muster point
Supervisor /Forman to immediately request all their people to
move to a safe muster point I case of gas smell coming from
neighbour plants and or in case of activated emergency sirens.
All personnel will be instruct on procedure to take and system of
contact (ENCO/SAIPEM) should an incident occurs
Supervisors to include in the STARRT activity information about
nearest muster point, wind socks, cross wind evacuation system ,
emergency route, etc..
Reporting of all incidents shall be informed in daily STARRT
meeting
Supervisor/Engineers in charge are responsible for leading HSE
and compliances by workforce.
Trained first aider to be provided
Ensure availability of emergency vehicle
Emergency drill planned to be conducted in working area
Emergency preparedness: in case of emergency alarm assemble
in the nearest assembly point.
In case of incident emergency contact: SAIPEM Emergency No-
93208091- ORPIC emergency No- 22105555
06 Housekeeping /Site cleanness Slip/trip/ and fall All possible due diligence to be exercised to ensure zero slips, Site manager
Waste generation trips and falls. Site Supervisor
Fire Prompt collection & disposal of wastes at the designated areas Foreman/Team Leader
Used welding rod should be keep in the separate bin HSER
All personnel to be responsible for clean-up and removal of all
equipment and spoil.
All work areas to be thoroughly checked to ensure that all tools
and equipment are accounted for before leaving site.
Ensure to return all tools and equipment to proper storage area
to maintain in good condition.