Modular System Scaffolds are scatfolds generally used for heavy duty construction work.
These scaffolds are most commonly found in form work supporting . outdoor access of
reparation of high buildings , flyover and bridges.
Erection Instructions1. Standard
Standod
eight (ura) Weight God Weight (ko)
1088 Sens) (Q6A Series)
7,000 5.00, 620
4,500 70 870
2,000, 3.50 12.60
2,500 12.00 NA
3,000 1430, WA
[véeight ks)
600
1.219 x 1,500, 1,503 615
1.5244 1,500 210s | 685
1,828 x 1,500
700
1219 2.000
235
Bi7 =30_|4. Plan Brace
Ba / vith (ram x Bay
isn Brace
re
th bren) | Weaght eal]
914x914 4,225 5.40
3144 1,219) 1.455, 6.25
9144 1,524 1710, FAs
‘14x 1,829, 1,580, 8.10
4219 1,219, 1,655, 6.95
1.2193 1,524 1,880, 7.75
1.219% 1,829 2.430 8.65
1,528 x 1,524 2,085 8.50
1,528 1,829 2.310 3.30
1,829 x 1,829 2,520 | 10.05
5. Platform
Bay Size (mb
6. Kick Board
~~
7. Adjustable Jack Base
Kick Board
a ae ee
[eee
Weight ka
Lf
Ag
justable Jack Bave
ns | ait
=
(048 Series; 038) | (G60 Series; 248)
[ee ea
ae
[ea ee8. U-Head Jack
Weight (kg)
(948 Sees, 2209
435
520
7,000 a
9, Base Collar
Height frm Weight (kg ‘Weight Gg)
(048 Series; 28) | (G60 Series; 248)
10. Cantilever Bracket
Cantilever Bracket
11. Spigot Adapter
Ha