You are on page 1of 4
Modular System Scaffolds are scatfolds generally used for heavy duty construction work. These scaffolds are most commonly found in form work supporting . outdoor access of reparation of high buildings , flyover and bridges. Erection Instructions 1. Standard Standod eight (ura) Weight God Weight (ko) 1088 Sens) (Q6A Series) 7,000 5.00, 620 4,500 70 870 2,000, 3.50 12.60 2,500 12.00 NA 3,000 1430, WA [véeight ks) 600 1.219 x 1,500, 1,503 615 1.5244 1,500 210s | 685 1,828 x 1,500 700 1219 2.000 235 Bi7 =30_| 4. Plan Brace Ba / vith (ram x Bay isn Brace re th bren) | Weaght eal] 914x914 4,225 5.40 3144 1,219) 1.455, 6.25 9144 1,524 1710, FAs ‘14x 1,829, 1,580, 8.10 4219 1,219, 1,655, 6.95 1.2193 1,524 1,880, 7.75 1.219% 1,829 2.430 8.65 1,528 x 1,524 2,085 8.50 1,528 1,829 2.310 3.30 1,829 x 1,829 2,520 | 10.05 5. Platform Bay Size (mb 6. Kick Board ~~ 7. Adjustable Jack Base Kick Board a ae ee [eee Weight ka Lf Ag justable Jack Bave ns | ait = (048 Series; 038) | (G60 Series; 248) [ee ea ae [ea ee 8. U-Head Jack Weight (kg) (948 Sees, 2209 435 520 7,000 a 9, Base Collar Height frm Weight (kg ‘Weight Gg) (048 Series; 28) | (G60 Series; 248) 10. Cantilever Bracket Cantilever Bracket 11. Spigot Adapter Ha

You might also like