Test Report No.

7191152016-MEC-16/01-OHH
dated 21 DEC 2016

Note: This report is issued subject to the Testing and Certification Regulations of the TÜV SÜD Group and the
General Terms and Conditions of Business of TÜV SÜD PSB Pte Ltd. In addition, this report is governed by the
terms set out within this report.

SUBJECT:

Load test on 3 Bay by 3 Lift of modular scaffolding system submit and installed
by Seng Yew Scaffolding & Engineering Pte Ltd on 29th Nov 2016.

TESTED FOR:

Seng Yew Scaffolding & Engineering Pte Ltd


18 Sungei Kadut Avenue
Singapore 729489

Attn: Ms Eileen Khiew

TEST METHOD:

SS 280 : Part 2 : 2009 Specification for Metal Scaffoldings – Part 2 : Modular Scaffoldings.
Clause 6.1.1 Load test on 3-bay x 3-lift modular scaffolding system (Annex A)

DESCRIPTION OF SAMPLE:

1 system of 3 Bay by 3 Lift of "TSS Ringlock" modular scaffolding system was received.
Refer to appendix for components used.

TEST PROCEDURES:

The modular scaffolding system was erected as shown in Figure 1 by Seng Yew Scaffolding & Engineering
Pte Ltd. Load was applied centrally between two standard members (vertical tubes) of the modular
scaffolding. The load was maintained for 2 hours. The loading (stiffness and strength load) were applied onto
the standard members in two separate tests (stiffness and strength tests respectively).

Deflections on the standard members were measured using linear gauges and at position taken as
shown in Figure 1. Prior to loading, the linear gauges were zeroed. Maximum deflections were taken by
monitoring the deflections throughout the two hours’ period of loading. Residual deflections were taken
at the end of 2 hours upon release of applied load.

DATE OF TEST:

24/08/2016 – 26/08/2016

LA-2007-0380-A LA-2007-0384-G The results reported herein have been performed in accordance with the
LA-2007-0381-F LA-2007-0385-E terms of accreditation under the Singapore Accreditation Council.
LA-2007-0382-B LA-2007-0386-C Inspections/Calibrations/Tests marked "Not SAC-SINGLAS Accredited" in
LA-2007-0383-G LA-2010-0464-D this Report are not included in the SAC-SINGLAS Accreditation Schedule for
our inspection body/laboratory.

Laboratory: Phone : +65-6885 1333 Regional Head Office:


TÜV SÜD PSB Pte. Ltd. Fax : +65-6776 8670 TÜV SÜD Asia Pacific Pte. Ltd.
No.1 Science Park Drive E-mail: enquiries@tuv-sud-psb.sg 1 Science Park Drive, #02-01
Singapore 118221 www.tuv-sud-psb.sg Singapore 118221
Co. Reg : 199002667R Page 1 of 9
Test Report No. 7191152016-MEC-16/01-OHH
dated 21 DEC 2016

TEST RESULTS:

1. Calculation of stiffness and strength test load.

1.1 Dead load per bay for 31 metre high modular scaffolding
(Based on information submitted by Seng Yew Scaffolding & Engineering Pte Ltd)

Item Unit weight (kg) Quantity Sub-total weight

20 m Standard 9.5 32 304.0

1.829m Transom/Ledger 4.77 54 257.6

Bracing 3.0 m 7.5 32 240.0

240 x 2000 mm metal deck 6.68 45 300.6

Toe Board (240 x 2000mm) 6.7 32 214.4

Overlaying net (nylon) 4.68 8 37.4

Total weight (kg) 1354.0

1.2 Working Load


1 lift 220 kg/m2 (max) x 1.8 m x 1.8 m = 712.8 kg

1.3 Stiffness Test Load


Stiffness test load = 1354.0 + (1.5 x 712.8) = 2423.2 kg
= 23.8 kN

1.4 Strength Test Load


Strength test load = 2 (1354.0 + 712.8) = 4133.6 kg
= 40.5 kN

Page 2 of 9
Test Report No. 7191152016-MEC-16/01-OHH
dated 21 DEC 2016

TEST RESULTS (CONT’D):

2. Stiffness Test

Stiffness test load = 23.8 kN

Maximum Residual Recovery after


Location deflection under Acceptance criteria
deflection (mm) unload (%)
load (mm)
Ay -2.33 -0.02 99
A
Ax -2.62 -0.04 99

By 3.72 0.18 95
B
Bx -2.15 0.35 #

Cy 2.88 0.18 94
C SS 280 : Part 2 : 2009
Cx -3.04 -0.47 85 Clause 6.1.1.1
Dy 2.91 0.28 90
D (refer to Note 1)
Dx 3.54 0.50 86

Ey 3.26 0.09 97
E
Ex 3.55 0.51 86

Fy 2.22 0.39 82
F
Fx 3.26 0.46 83

Notes:

1. After removal of the test load, the member or structure shall be deemed to have adequate
stiffness if all measured strain or deflection values show a recovery of at least 80%. If any
measured strain or deflection value does not show a recovery of at least 80% of the respective
maximum value recorded during the two hours under load, the test shall be repeated.
2. Transcript Y is the transverse deflection and Transcript X is the longitudinal deflection.
3. Figure 2 shows the exaggerated deflection of members to show the deflection of movement of
member while under load and after unload.
4. " # " indicates datum shifted to opposite direction.
5. The above test results complied with SS 280 : Part 2 : 2009 (Clause 6.1.1.1) requirement.

Page 3 of 9
Test Report No. 7191152016-MEC-16/01-OHH
dated 21 DEC 2016

TEST RESULTS (CONT’D):

3. Strength Test

Strength test load = 40.5 kN

Maximum Residual Recovery after


Location deflection under Acceptance criteria
deflection (mm) unload (%)
load (mm)
Ay -4.21 -0.93 78
A
Ax -5.62 -1.13 80

By 4.17 0.97 77
B
Bx 4.11 0.56 86

Cy 4.38 0.25 94
C
Cx 4.16 0.53 87 SS 280 : Part 2 : 2009
Clause 6.1.1.2
Dy 5.73 0.68 88 (refer to Note 1)
D
Dx 4.73 0.54 88

Ey 5.02 0.55 89
E
Ex 4.45 0.55 88

Fy 4.27 0.55 87
F
Fx 4.14 0.53 87

Notes:

1. The structure shall be deemed to have adequate strength if during the test no part fails and if
on removal of the test load, all measured strain or deflection values show a recovery of at least
20% of the respective maximum value recorded during the two hours under load.
2. Transcript Y is the transverse deflection and Transcript X is the longitudinal deflection.
3. Figure 3 shows the exaggerated deflection of members to show the deflection of movement of
member while under load and after unload.
4. The above test results complied with SS 280 : Part 2 : 2009 (Clause 6.1.1.2) requirement.

Sean Loh Oh Heng Hwa


Associate Engineer Executive Engineer
Industrial Group
Mechanical Centre

Page 4 of 9
Test Report No. 7191152016-MEC-16/01-OHH
dated 21 DEC 2016

APPENDIX:

Test Load
Test Load

L/2 L/2

(A, D) A1 A2 D2 D1

2.0 m

(B, E) B1 B2 E2 E1
2.0m

C1
(C, F) C2 F2 F1
2.0 m

1.8 m 1.8 m

Front Elevation End Elevation

Note – A, B, C, D, E & F are the locations where the transverse and longitudinal deflections are measured.

Figure 1 – Load test on 3-bay x 3 lift modular system

Page 5 of 9
Test Report No. 7191152016-MEC-16/01-OHH
dated 21 DEC 2016

APPENDIX (CONT’D):

Transverse Deflection Longitudinal Deflection

Ref Ref Ref


-ve
-ve Ref
+ve -ve +ve +ve
-ve
+ve
Ay Dy Ax
Dx

By Ey Bx
Ex

Cy Fy Cx

Fx

Figure 2. Stiffness Test

Notes:

1) The above diagram is pictorial only. Only the inner and outer standards/leg pipes under load are shown.

2) --------- indicates the exaggerated deflection of standards/leg pipes (Permanent deflection).

3) _____ indicates the exaggerated deflection of standards/leg pipes (Maximum deflection).

Page 6 of 9
Test Report No. 7191152016-MEC-16/01-OHH
dated 21 DEC 2016

APPENDIX (CONT’D):

Transverse Deflection Longitudinal Deflection

Ref Ref Ref


-ve
-ve Ref
+ve -ve +ve +ve
-ve
+ve
Ay Dy Ax
Dx

By Ey Bx
Ex

Cy Fy Cx

Fx

Figure 3. Strength Test

Notes:

1) The above diagram is pictorial only. Only the inner and outer standards/leg pipes under load are shown.

2) --------- indicates the exaggerated deflection of standards/leg pipes (Permanent deflection).

3) _____ indicates the exaggerated deflection of standards/leg pipes (Maximum deflection).

Page 7 of 9
Test Report No. 7191152016-MEC-16/01-OHH
dated 21 DEC 2016

Appendix:

Page 8 of 9
Test Report No. 7191152016-MEC-16/01-OHH
dated 21 DEC 2016

Please note that this Report is issued under the following terms :

1. This report applies to the sample of the specific product/equipment given at the time of its testing/calibration. The results are not used to
indicate or imply that they are applicable to other similar items. In addition, such results must not be used to indicate or imply that TÜV SÜD
PSB approves, recommends or endorses the manufacturer, supplier or user of such product/equipment, or that TÜV SÜD PSB in any way
“guarantees” the later performance of the product/equipment. Unless otherwise stated in this report, no tests were conducted to determine
long term effects of using the specific product/equipment.

2. The sample/s mentioned in this report is/are submitted/supplied/manufactured by the Client. TÜV SÜD PSB therefore assumes no
responsibility for the accuracy of information on the brand name, model number, origin of manufacture, consignment or any information
supplied.

3. Nothing in this report shall be interpreted to mean that TÜV SÜD PSB has verified or ascertained any endorsement or marks from any other
testing authority or bodies that may be found on that sample.

4. This report shall not be reproduced wholly or in parts and no reference shall be made by the Client to TÜV SÜD PSB or to the report or results
furnished by TÜV SÜD PSB in any advertisements or sales promotion.

5. Unless otherwise stated, the tests were carried out in TÜV SÜD PSB Pte Ltd, No.1 Science Park Drive Singapore 118221.

July 2011

Page 9 of 9

You might also like