Professional Documents
Culture Documents
Issued To: -
M/s Balabharti Infrastructure Pvt. Ltd.
Client: -
Hindustan Steel Works Construction Ltd.
(HSCL), Delhi
Project Name: -
“Construction of ROB in Lieu of LC. 407B at KM. 1205/6-8
on Jhansi-Gwalior Section”
Location: -
A1 Side, (Test Pile - 1)
Date of Testing: -
24-01-2024
Date of Report: -
30-01-2024
1. INTRODUCTION
3. DETAILS OF PILE
4. TEST PROCEDURE
7. CLOSURE
8. LOADING SCHEME
9. EQUIPMENT DETAILS
The Hindustan Steel Works Construction Ltd. (HSCL), Delhi has awarded a work
of Construction of ROB in Lieu of LC. 407B at KM. 1205/6-8 on Jhansi-Gwalior
Section to M/s Balabharti Infrastructure Pvt. Ltd. The work of pile load testing
has been awarded to M/s ME Testing Laboratory Jaipur by M/s Balabharti
Infrastructure Pvt. Ltd.
The purpose of this study was to have a check on calculation of safe load of pile. To
accomplish this purpose, the study was conducted in the following phases.
Testing one piles, 1200MM dia, 30.0m long to to 2.5 Times the designed
load or failure whichever occurs first.
Fifty percent of the final load at which the total displacement increases
to 12mm.
Final load at which the total displacement corresponding to 5mm.
Preparing the technical report presenting and analysing the load test
result.
3 DETAILS OF PILE
The Initial Lateral Pile Load Test was conducted on Bored cast-in-situ pile with
1200mm diameter.
Following table summarizes the pile details.
PILE DETAILS
Type of Pile Bored cast-in-situ
Pile Diameter 1200 mm
Lenght of Pile 30.0 Meters
Pile Location A1 Side (Test Pile -1)
Date of Casting 01-Nov-2023
Date of Testing 24-Jan-2024
Design Load 10.0 MT
Test Load (2.5 x 10) 25.0 MT
Grade of Concrete M-35
4 TEST PROCEDURE
The procedure of the test was in general accordance with IS 2911 (Part 4): 2013. The
reaction for applying Lateral load on the Pile is taken as per arrangement shown.
The test load was applied on the pile Lateral by means of a Hydraulic jack and a
controlled pressure pump. The load was applied in increments of about 20% of the
design load.
Each stage of loading shall be maintained till the rate of movement of the pile side is
not more than 0.10 mm/30 subjects magnetic base and datum bars. to minimum of
30 min. Displacement were recorded by means of Two dial gauges of 0.01mm least
counts. Dial gauges spaced at 30 cm at a suitable height and the Displacement
interpolated at the load point from Triangle. The maximum load applied 2.5 times of
design load or failure whichever occurred first. Unloading may be carried out, if
possible. A period of 10 minutes may be allowed to elapse between the two
successive stages of load decrement.
7 CLOSURE
We appreciate the opportunity to submit this report. Please contact us if you need
any clarification.
Tested by
AUTH. SIGNATORY
8 LOADING SCHEME
Design Pile Load = 10.0 MT
Test Load (2.5 x 10) = 25.0 MT
Effective Bore Dia of Hydraulic Jack = 120 mm
Effective Bore Area of Hydraulic Jack = 113.112 cm2 ...(A)
Least Count of Pressure Gauge = 10 kg/cm2 ...(P)
Each Small Division on Pressure Gauge = P x A = (kg/cm 2 x cm2)
= 10 x 113.112 = 113.112 kg Say = 113.112/1000 = 1.13 MT
Required Each Increment of Final Test Load Approximate 20% of 10 is = 2 MT
Applied Each Increment which is (1.13 x 2.0) = 2.26 MT
S. Required Applied Pressure Applied load Displacement
Description
No load in MT in kg/cm2 in MT in MM
0 Increment 0 0 0 0
1 Loading 2.0 20.0 2.26 0.025
2 cycle 4.0 40.0 4.52 0.080
3 6.0 60.0 6.78 0.185
4 8.0 80.0 9.04 0.275
5 10.0 100.0 11.30 0.740
6 12.0 120.0 13.56 1.525
7 14.0 140.0 15.82 2.880
8 16.0 160.0 18.08 5.065
9 18.0 180.0 20.34 7.990
10 20.0 200.0 22.60 11.335
11 22.0 210.0 23.73 12.625
12 20.0 200.0 22.60 12.660
13 16.0 160.0 18.08 12.505
14 12.0 120.0 13.56 12.255
(Rebound)
15 8.0 80.0 9.04 11.740
16 4.0 40.0 4.52 10.990
17 0 0 0 9.800
9 EQUIPMENT DETAILS
Total Nos. of Hydraulic Jack - 1 nos
Capacity of Hydraulic Jack each - 50.0 MT
Total Nos of Dial Gauges - 2 Nos
Least Count od Dial Gauge - 0.01 mm
Magnet Base - 2 nos
Hydraulic Hand Pump - 1 nos
Hose Pipe - 1 nos
Pressure Gauge Range - 0-600 kg/cm2
Datum bar - 1 Nos
Auto Level, Sprite Level etc.
ANNEXURE : A (SITE OBSERVATIONS DATA)
INITIAL LATERAL PILE LOAD TEST
PROJECT Construction of ROB in Lieu of LC. 407B at KM. 1205/6-8 on Jhansi-Gwalior Section
PILE TYPE BORED CAST IN SITU DESIGN SAFE LOAD 10.0 METRIC TON
PILE DIA 1200 MM DATE OF CAST 1/11/2023
PILE LENGTH 30.0 M DATE OF TEST 24/1/2024
RAM DIA. 120 MM 1 DIV. OF PG 10 KG/SQ CM
RAM AREA 113.112 CM² LOAD ON 1 DIV. 1.13 MT
DATE TIME Pressure LOAD READING, mm AVG SETTLEMENT
DIAL
IN HRS in kg/cm² IN MT DIAL GAUGE I mm
GAUGE II
24/01/2024 10:30 AM 0 0 0.00 0.00 0.0
" 10:30 20.0 2.26 0.02 0.03 0.025
" 11:00 " " 0.02 0.03 0.025
" 11:00 40.0 4.52 0.06 0.08 0.070
" 11:30 " " 0.07 0.09 0.080
" 11:30 60.0 6.78 0.16 0.19 0.175
" 12:00 PM " " 0.17 0.20 0.185
" 12:00 80.0 9.04 0.23 0.27 0.250
" 12:30 " " 0.25 0.30 0.275
" 12:30 100.0 11.30 0.66 0.75 0.705
" 1:00 " " 0.69 0.79 0.740
" 1:00 120.0 13.56 1.40 1.56 1.480
" 1:30 " " 1.44 1.61 1.525
" 1:30 140.0 15.82 2.69 2.94 2.815
" 2:00 " " 2.75 3.01 2.880
" 2:00 160.0 18.08 4.76 5.22 4.990
" 2:30 " " 4.83 5.30 5.065
" 2:30 180.0 20.34 7.61 8.20 7.905
" 3:00 " " 7.69 8.29 7.990
" 3:00 200.0 22.60 10.84 11.64 11.240
" 3:30 " " 10.93 11.74 11.335
" 3:30 210.0 23.73 12.08 12.93 12.505
" 4:00 " " 12.19 13.06 12.625
LOAD REBOUND (RELEASE)
24/01/2024 4:00 PM 200.00 22.60 12.23 13.11 12.670
" 4:15 " " 12.22 13.10 12.660
" 4:15 160.00 18.08 12.11 12.97 12.540
" 4:30 " " 12.08 12.93 12.505
" 4:30 120.00 13.56 11.89 12.71 12.300
" 4:45 " " 11.85 12.66 12.255
" 4:45 80.00 9.04 11.44 12.19 11.815
" 5:00 " " 11.37 12.11 11.740
" 5:00 40.00 4.52 10.76 11.46 11.110
" 5:15 " " 10.65 11.33 10.990
" 5:15 0 0 9.82 10.30 10.060
" 5:30 " " 9.58 10.02 9.800
ANNEXURE : B (LOAD VS DISPLACEMENT CURVE)
Total Displacement at the 12.625 final load mm at 2.5 times of design load.
After Reboun of Test load Net Displacement is 9.80 mm.
Pile Location A1 Side (Test Pile -1)
Pile Dia 1200 MM
Pile Lenght 30.0 Meters
Design Load 10.0 MT
Applied Load 23.73 MT
Date of Cast 01-Nov-2023
Date of Test 24-Jan-2024
ANNEXURE : C (TEST SETUP DRAWING)
ANNEXURE : D (CALIBRATION CERTIFICATES)