1. GENERAL
1.1. The load test for the proposed piling works involving among other things, installation of
bored cast-in-situ, reinforced concrete piles was entrusted to M/s L&T Construction
Limited., A Routine lateral pile load test was carried out during 29 th December 2023 on
Pile No. This report summarizes the test results and their interpretation.
2.1. The Pile was cast-in-situ in a bore drilled, boring was accomplished by direct mud
circulation method using bentonite slurry to stabilize the borehole. The concrete was
placed in the pile bore after insertion of the prefabricated reinforced cage, using a
200mm diameter of tremie pipe. The general installation of pile was in accordance with
the Indian Standard code IS: 2911 (Part IV/ Sec 2) - 2013, latest version.
2.2. The cross section of the pile is circular with a nominal shaft diameter of 1000mm.
3.5 The test loads are applied in increments of about 20 percent of the safe load. The
pressures were read from pressure gauge with a least count of 5kg/cm 2 attached
to the hydraulic pump. The jack has an effective ram area of 143.79 cm2.
3.6 Each stage of loading was maintained till the rate of movements of the pile top
was not more than 0.10mm in the first 30 minutes.
3.7 Time, displacement observations were made at commencement and completion of
each increments; deflection observation were also continued at regular intervals
during the period when the applied load was kept constant.
3.8 The loading was commenced on 29/12/2023 and continued till it reached value
13 .50 MT at same day (29 /12 /2023 ). The loading was then relaxed in stages by
releasing the jacking pressure, and rebound observations were also made.
4.0TEST RESULTS
4.01 The loads and the corresponding total displacement are given below;
4.02 Based on table, the load vs. the total displacement curve has been plotted and is
shown in Annexure - III. The total sustained load applied was 13.66MT, and the
Corresponding Total Displacement was 1.035mm. The Net Displacement after removal
of the load was 0.575mm, the Total Elastic Displacement , or the Rebound being
0.460mm.
4.03 The load vs. displacement curve is shown in Annexure III. From the load vs
displacement curve, the load corresponding to 5mm displacement is much more than
13.66MT.
Actual Applied Theoretical Actual Load Deflection (mm)
Sl
Pressure in Pressure in
No Load In MT in MT
Kg/cm2 Kg/cm2 Loading Unloading
01 0 0 0 0 0 0.575
2. Pile location : TP
NGL : 15.678m
8. Rebound : 0.460mm
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00
0.00 0.20 0.40 0.60 0.80 1.00 1.20