Professional Documents
Culture Documents
PROJECT 7
Grading Method C
Semester: Name
PROCEDURE:
Read A.C. 43.13-1B, Change 1, Chapter 4.
Review the Avotek Aircraft Structural Maintenance, Revised
Edition, Chapter 6, Airframe Structures.
Secure a piece of 2024-O 6½x8¼” and trim to rough shape to
construct the rib noted below. (25 points each)
Instructor's signature
A { } B { } C { } D { } Inadequately prepared { }
07/23/2007 1 Level 3
AMT 224: METALLIC STRUCTURES
PROJECT 7
Prepare the holes and cutouts as shown in the drawing above,
bend the flange for the spar attach, and secure to the form
blocks.(25 points)
Instructor's signature
A { } B { } C { } D { } Inadequately prepared { }
Hand form the nose rib to the dimensions noted, remove from
the form block, trim to size, and show to the instructor for
evaluation . (50 points)
Instructor's signature
A { } B { } C { } D { } Inadequately prepared { }
07/23/2007 2 Level 3