You are on page 1of 1

FISHERFARMS INC.

Plant Engineering Department


053 National Road Dampol 2nd A, Pulilan, Bulacan
REVISION
FORM TITLE: AUDIT Work Order Form – Milkfish 00
NO.
FORM NO. DATE EFFECTIVE: 31 – 07 - 20 PAGE NO. 1 of 1
Date Range: July 31 – Aug. 5, 2020 PM Week # PED Section: AC / BLOWER
PM WO #: Date:

To be Filled-up by PED Planner To be Filled up by Leadman/Techinician End User


Ite Parts/Matls Availability Labor Performed by:
m#
Area Part Equipment & Activities w/ Status Signed by
Description Ok MH MP Name Date
PR
MilkFish
1 Packing Checking of Cooling Room - Packing
Production Area
MilkFish
2 Cooling Room Cleaning of Evaporator - Cooling Room
Production Area
MilkFish
3 Marination Evaporator Blower @ Marination
Production Area
MilkFish
4 Deboning Area Noisy Blower @ Deboning Area
Production Area
MilkFish
5 Receiving Rusty Evaporator @Receiving Area
Production Area
MilkFish Production Uncleaned Air Curtain @ Production
6
Production Area Entrance Entrance

Prepared by: _____________________ Checked by: ________________________


PED Planner Engineering Supervisor

SnagList/Findings:

Performed by: Acknowledge by: Reviewed by:

Leadman Engineering Supervisor PED Manager