You are on page 1of 1

FISHERFARMS INC.

Plant Engineering Department


053 National Road Dampol 2nd A, Pulilan, Bulacan
REVISION
FORM TITLE: AUDIT Work Order Form – Milkfish 00
NO.
FORM NO. DATE EFFECTIVE: 31 – 07 - 20 PAGE NO. 1 of 1
Date Range: July 31 – Aug. 5, 2020 PM Week # PED Section: GS
PM WO #: Date:

To be Filled-up by PED Planner To be Filled up by Leadman/Techinician End User


Ite Parts/Matls Availability Labor Performed by:
m#
Area Part Equipment & Activities w/ Status Signed by
Description Ok MH MP Name Date
PR
Mi lkFis h Fill ing of mas i lya @ Vegetable
1 RTH
Producti on Area Preparati on
Mi lkFis h
2 DELI For Painting of Footi ng - Seydelma n
Producti on Area
Mi lkFis h For Painting of of Chute Pa nel
3 ACCESS DOOR
Producti on Area (Deboning - Receiving)
Mi lkFis h
4 DELI For Pai nti ng of Racks in the DELI Area
Producti on Area
Mi lkFis h Pa inti ng of Brackets a t Ceil ing Area of
5 CRATE WASHING
Producti on Area Crates was hi ng
Mi lkFis h
6 SMOKE HOUSE Pa inti ng of Steam Line (Brini ng Area)
Producti on Area

Mi lkFis h
7 RTH Painti ng of Ves mach
Producti on Area

Mi lkFis h
8 Receiving Painti ng or Rus ty Wal l - Recei vi ng Area
Producti on Area

Mi lkFis h
9 ANTE ROOM Plas ti c Curta in @ Ante Room
Producti on Area

Mi lkFis h Producti on
10 Pla s tic Curtain @ Chutes
Producti on Area Common

Mi lkFis h Producti on
11 Plas ti c Curta in @ Foot Bath - Packing
Producti on Area Common

Mi lkFis h
12 IQF Pla s tic Curtain @ IQF Infeed
Producti on Area

Mi lkFis h Producti on
13 IMProper Length of Pla sti c Curta in
Producti on Area Common

Mi lkFis h
14 DEBONING Rus ted Pipes @ Deboning Ha ndwas h
Producti on Area

Mi lkFis h Rus ty Eva pora tor @ Tri mmi ng and


15 Receiving
Producti on Area Fabri ca tion
Mi lkFis h Rus ty Pippings @ Deboning Area
16 DEBONING
Producti on Area (Deboni ng Tables )

Mi lkFis h
17 DEBONING Rus ty Wall s @ Deboning
Producti on Area

Mi lkFis h Producti on Scraping of Pai nt a t Stai nles s Frami ng -


18
Producti on Area Common All Area

Prepared by: _____________________ Checked by: ________________________


PED Planner Engineering Supervisor

Performed by: Acknowledge by: Reviewed by:

Leadman Engineering Supervisor PED Manager