You are on page 1of 4

TUGAS ANALISA HASIL UJI SUMUR

IXORA KARUNDENG
071.17.065

dt (hours) pws (psia) HTR DIK Rw 0.21


0 3519 h 64
0.15 3680 2668 Por 19%
0.2 3723 2001 Viskositas 0.65
0.3 3800 1334 Bo 1.224
0.4 3866 1001 Pwf 3519
0.5 3920 801 Qo 250
1 4103 401 tp 400
2 4250 201 ct 1.50E-06
4 4320 101
6 4340 68
7 4344 58
8 4350 51
12 4364 34
16 4373 26
20 4379 21
24 4384 18
30 4393 14 Horner
40 4398 11 4500
50 4402 9
4400 f(x) = − 18.2727550293346 ln(x) + 4441
60 4405 8
Pwf.Psi

4300 R² = 1
72 4407 7
4200
4100
Slope
4000
HTR Pwf (psi)
3900
1 4442
3800
100 4358
3700
3600
Pavg 4442 Psi 1 10
Slope 42.07 Horn
kh 768.66 mD-ft
k 12.01 mD
HTR 1 hr 401 dimensionless

Dari Grafik
P1h 4332 psi
s 15.42
dPS 563 psi
ef 0.3897
ft
ft

cp
bbl/STB
psia
BOPD
hours
psi^-1

Horner Plot

8.2727550293346 ln(x) + 4441.83925106582

10 100 1000 10000


Horner Time
TUGAS ANALISA HASIL UJI SUMUR
IXORA KARUNDENG
071.17.065

t (jam) pwf (psia) dp (psi) Deriative


0.5 2045 5 HR Pws
0.75 2040 4.5 3.61 1 1949
1 2036 7.5 3.61 100 1933
1.5 2028 7 9.38
2 2021 14 3.61
3 2007 9.5 -7.93
4 1998 8.5 8.81 Intercept 1947.1621049307
5 1989 14 2.68 Slope (ln) -3.06362768651
7 1975 10 -2.89 Slope (Log) -7.054263441441
10 1965 12 -3.71
12 1953 8 -13.61
18 1945 4 -4.33
24 1941 5 -4.33
36 1936 1 -5.48 Pressure Dra
48 1935 1.2 -1.15 2060
72 1934 0.2 -0.50 2040

Pwf, Psia
96 1934 0.85 1.07 2020
100 1933 0.55 3.02 2000
150 1932 2.2 2105.72 1980
250 1930 1930 1960
1940 f(x) = − 3.34688251652391 ln(x) + 1948.6
1920 R² = 1
1900
Slope 7.71 psi/cycle 1880
kh 804.193 mD-ft 1860
1 10
k 12.97 mD
p1h 1949 Psi
s 14.72
dps 98.5 Psi
pwf 1930 Psia
ef -0.014
DIK Qo 33 STB/day
vis 1.1 cp
Bo 1.05 res bbl/STB
h 62 ft
rw (inchi) 6 ft
ct 6.00E-05 1/psi
por 0.31
Pi 2055 psia

Pressure Drawn Down

= − 3.34688251652391 ln(x) + 1948.62224735415


1

10 100 1000

t, hours

You might also like