RATE ANALYSIS FOR REINFORCED CEMENT CONCRETE


DOWNLOADED FROM THECONSTRUCTOR.ORG

RCC 1 :1.5 :3 Analysis for 2


Wet Volume 72.00 m 3

Dry Volume 110.88

MATERIAL Qty. Units Rs. / Unit


CEMENT BAGS 580.98 bags 300
SAND 30.24 m3 900
Aggregate 60.48 m3
700
Reinforcement 11304.00 Kg 60

LABOUR With
Mechanical Mixer & Vibrartor Days
MASON 0.37 300
LABOUR 3.50 200
WATER CARRIER 1.39 200
BAR BENDER 113.04 200
MIXER OPERTOR 0.071 200
MIXER VIBRATOR 0.071 200
0.00
PRIME COST (Rs.):

Water Charges 1.5%


Sundries (including mixer machine, transportation etc) 7.5 %
Contractor's Profit 14 %

Total Cost per m3 of RCC =

Cost of RCC for Given Data = Rs.


ONCRETE
Steel % by volume
of Concrete
SLAB 1.00%
BEAM 2.00%
COULMN 2.50%
Road 0.60%
AMOUNT SUBTOT
(Rs.) AL (Rs.)
174294
27216
42336
678240
###

111.00
700.00
278.00
22608.00
14.28
14.28 23725.56

945812

14187
70936
132414

16158

1163348