You are on page 1of 2

BRTS PROJECTS

Ministry of Road Shipping Transport & Highways(MORT&H)


NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONSULTANT : Urban Mass Transit Company Ltd.
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.

WMM Plant Calibration

Plant Capacity

100 TPH

Conveyor Belt Length

21.10 mtr.

Time Required for 1 Cycle

15.30 sec.

No. of Cycle per minute

(60/15.30)

3.92

Total Conveyor Length per minute

21.10 X 3.92

82.71

Qty. Required per meter per minute

100/60/82.71

0.02015

Qty. Required per meter in kg.

0.02015 X 1000

20.15

Materials (mm)

Mix Proportion in
percentage (%)

Material kg/mtr.

Coarse Aggregate (40 mm Down)


Coarse Aggregate (22.4 mm Down)
Coarse Aggregate (11.2 mm Down)
Stone Dust
Total

Contrctor's Representative

25.00
25.00
25.00
25.00

5.0375
5.0375
5.0375
5.0375
20.150

Consultant's Rep

BRTS PROJECTS

Shipping Transport & Highways(MORT&H)


System Corridor in Surat, on Surat- Navsari Road

M/S Relcon Infraprojects Pvt. Ltd.

M Plant Calibration
Date : 07.12.2011

Nos.
mtr./minute
ton/meter
kg./meter

Gate Opening by (%)


from Graph

Consultant's Representative

You might also like