You are on page 1of 4

SAFE

Direct Shear Test


Project: Construction of Amman Trade Center Plot No. 1-A, Value
Addition City, Khurdianwala, Distt. Faisalabad

Bore Hole No. 1 Sample Type SPT-2

Depth (feet) 5 Date 17/12/2016.

350

300

250
Shear Stress(kpa)

200
f(x) = 0.589090909090909 x + 0.8
150

100

50
normal
0 110
50 100 150 200 250 300 350
220
Normal Stress(kpa)
330

250

188 195
200 179 184
161 169
Shear Stress (Kpa)

145 151
150 132
120 125 129 130 131
108 108 115
91 93 99
100 77 84
69 67 64 64 65
53 57 60
44 48 52
50 41 39 35 40
24 22 25 31
15
12 20
0
0
0 0.5 1 1.5 2 2.5 3 3.5
Horizontal Dispalcement(mm)

Linear Regression

Angle of Internal Friction 31.0 Degree


Cohesion 0.80 kPa
Prepared By_________________ Checked By___________________
10 20 30
Hz Stres Hz stress Hz stress
0 0 65 0 0 131 0 0 195 69 0 0 134 0 0
0.2 12 65 0 15 131 0.2 24 195 69 13 0.188406 134 15 0.11194
0.4 20 65 0 22 131 0.4 41 195 69 21 0.304348 134 23 0.171642
0.6 25 65 1 39 131 0.6 69 195 69 27 0.391304 134 40 0.298507
0.8 31 65 1 53 131 0.8 91 195 69 33 0.478261 134 54 0.402985
1 35 65 1 67 131 1 108 195 69 37 0.536232 134 69 0.514925
1.2 40 65 1 77 131 1.2 120 195 69 42 0.608696 134 79 0.589552
1.4 44 65 1 84 131 1.4 132 195 69 47 0.681159 134 86 0.641791
1.6 48 65 2 93 131 1.6 145 195 69 51 0.73913 134 95 0.708955
1.8 52 65 2 99 131 1.8 151 195 69 55 0.797101 134 101 0.753731
2 57 65 2 108 131 2 161 195 69 61 0.884058 134 110 0.820896
2.2 60 65 2 115 131 2.2 169 195 69 64 0.927536 134 118 0.880597
2.4 64 65 2 125 131 2.4 179 195 69 68 0.985507 134 128 0.955224
2.6 64 65 3 129 131 2.6 184 195 69 68 0.985507 134 132 0.985075
2.8 65 65 3 130 131 2.8 188 195 69 69 1 134 135 0.995
3 131 131 3 195 195 134 1
Shear
65
131
195 1 66
2 110

0.6

0.5404 97.3 31.0


201 0 0
201 25 0.124378
201 42 0.208955
201 71 0.353234
201 94 0.467662
201 111 0.552239
201 124 0.616915
201 136 0.676617
201 149 0.741294
201 156 0.776119
201 166 0.825871
201 174 0.865672
201 185 0.920398
201 190 0.945274
201 194 0.965174
201 201 1

You might also like