REVISIONS
LETTING DATE
1
PLANS OF PROPOSED IMPROVEMENT ON THE
R.O.W. PROJECT NUMBER
PROJECT NAME
PCC OVERLAYS - BONDED AND UNBONDED
INDEX OF SHEETS
PCC OVERLAYS AND WIDENING - BONDED & UNBONDED
No. Description
[Project Description]
A.1 Title Sheet
A.2 Legend and Survey Control
Total Length A.3 Estimated Quantities and Reference Information
B.1 Existing Section and Milling Sheet
The information included herein does not represent a specific B.2 Bonded and Unbonded Typical Cross Section
B.3
project, but may be used as an example of what should be Bonded PCC Overlay Jointing (with and without Widening)
B.4 Unbonded PCC Overlay Jointing (with and without Widening)
included for a PCC bonded or unbonded overlay project. B.5 Miscellaneous Details
B.6 Profile Transition Details
POP. POP.
POP. POP.
B.7 Right Turn and Bridge Approach Details
597TH
597TH
3317 3317
A VE
AVE
320TH ST 320TH 827 320TH ST 320TH 827
570TH AVE
570TH AVE
500TH AVE
500TH AVE
580TH AVE
580TH AVE
320TH ST LN 320TH ST LN
520TH AVE
535TH AVE
535TH AVE
505TH
505TH
AVE
AVE
560TH AVE
560TH AVE
585TH AVE
585TH AVE
30 28 27 30 28 27
29 28 27 29 29 28 27 29
25 25
POP. 26 POP. 26 B.9 Guardrail and Paved Shoulder Detail
1489 1489
210 210 210 210 210 210
C.1 Quantity Tabulations
578TH
578TH
AVE
AVE
R-24W R-23W R-24W R-23W
BOONE CO. STORY CO. 32 33 R70 BOONE CO. STORY CO. 32 33 R70
33 34 35 36 32 33 34 35 36 32
POP.
31 Coon UNION PACIFIC
34
POP.
31 Coon UNION PACIFIC
34
D.1 Existing Roadway Plan and Profile for Reference Only
Cre
Cre
319
69 35 RAILROAD
319
69 35 RAILROAD
ek
ek
340TH ST 340TH ST 340TH ST 340TH ST
NE
NE
ST ST
340TH
166 AVE
166TH
340TH ST 340TH ST
NE
NE 166 AVE
166TH AVE NW 166 AVE NE 166TH
340TH
NE
NE
ST ST
340TH
166 AVE
166TH
340TH ST 340TH ST
NE
NE 166 AVE
166TH AVE
J.1 Staging and Traffic Control Notes
AVE AVE UNION PACIFIC AVE AVE UNION PACIFIC
Detour
NE 22 ST
NE 22 ST
6 5 4
69 35 RAILROAD
6 5 4
69 35 RAILROAD
J.2 Staging Construction Open to Traffic
POP.
3 2 1 6 5 4 3 POP.
3 2 1 6 5 4 3
POLK CO. R70 POLK CO. R70
319
NW 158 AVE
R-24W
NE 158 AVE NE 158 AVE
R-23W Route 319
NW 158 AVE
R-24W
NE 158 AVE NE 158 AVE
R-23W
L.1 Staking Layout
End
NE 42 ST
NE 42 ST
NW 44 ST
NW 44 ST
NW 30 ST
NW 30 ST
NW 16 ST
NW 16 ST
NE 29 ST
NE 29 ST
NW 2 ST
NW 2 ST
Jointing Layout
NW 58 ST
NW 58 ST
Fo
Fo
R38 R38 L.2
ur
ur
Project 12 7 8 9
10 11 12 7
8
9
10 12 7 8 9
10 11 12 7
8
9
10
M
M
ile
ile
NW 150 AVE NE 150 AVE NE 150 AVE NW 150 AVE NE 150 AVE NE 150 AVE
13 13
NE 46 ST
NE 46 ST
LINCOLN LINCOLN
NE 56 ST
NE 56 ST
WHITE WHITE
DR
DR
AK
K
A
OAK OAK
18 18
O
O
14 14
TE
TE
NE 33 C T
NE 33 C T
HI
HI
13 17 16 15 18 17 16 15 13 17 16 15 18 17 16 15
W
W
NE
E
Cr
eek Cr
eek
N
NW 142 AVE NE 142 AVE NE 142 AVE NW 142 AVE NE 142 AVE NE 142 AVE
NE 38 ST
NE 56 ST
NE 56 ST
NW 16 ST
NW 16 ST
NE 46 ST
N E 46 ST
NW 30 ST
NW 30 ST
NW 44 ST
NW 44 ST
NW 2 ST
NW 2 ST
NE 29 ST
NE 29 ST
NE 22 ST
NE 22 ST
R70 R70
R
R
25 25
D
D
Begin 25 25
L
L
29 28 27 29 28 27
AH
H
A
30 30
29 28 27 69 30 29 28 27 69 30
including: staging, traffic control, varying existing
LD
D
26 26
EL
SHE
SH
W
W
N
N
F22 F22 F22 F22
Project NW 126 AVE NE 126 AVE NW 126 AVE NE 126 AVE
NE 6 ST
31 31
34 34
32 33 34 35 31 32 32 33 34 35 31 32
POP. 36 33
POP. 36 33
and construction under traffic.
NE 46 ST
NE 46 ST
3418 3418
CROCKER POP. 683 CROCKER POP. 683
NE 118 AVE NE 118 AVE
NE 6 ST
R56 R56
NW 37 ST
NW 37 ST
POP. 35 POP. 35
6 6
CROCKER
6 5 4 3
45582
2
5 4 3
CROCKER
6 5 4 3
45582
2
5 4 3
the scope of the project.
NW 110 AVE NW 110 AVE NE 110 AVE NW 110 AVE NW 110 AVE NE 110 AVE
NW 44 ST
NW 44 ST
NE 108 AVE NE 108 AVE
NE 29 ST
NE 29 ST
NE 46 ST
NE 46 ST
NE 56 ST
NE 56 ST
NE 38 ST
NE 38 ST
8 9 10 8 9 10
8 8
N
N
W DR
W DR
NE 102 AVE NE 102 AVE
LA
LA
SCALES: As Noted
K
K
CT
CT
E
E
NE 24
N E 24
SK DR
SK DR
44 ST
44 ST
NW
NW
NW 98 AVE NW 98 AVE
16 15 16 15
NE FRI
NE FRI
Location Map Detour Map
The location map is helpful to the contractor when The detour map is used only if roadway is closed to traffic during construction. If through traffic
planning haul routes, traffic control, and staging. is allowed during construction, typically traffic control zones are kept to a 0.25 mile maximum
length without the use of pilot cars as long as adequate sight distance is available.
Construction zones that utilize pilot cars are typically 2.5 to 3 miles in length or no more than
10 minutes wait time per zone.
INDEX OF SEALS
Signature Date
DESIGN TRAFFIC DATA SHEET NO. NAME TYPE
The title sheet shows general project information 20__ AADT V.P.D.
Printed or Typed Name
sheets, mileage summary, traffic, and engineering TRUCKS % Pages or sheets covered by this seal:
FILE NO. ENGLISH DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER A.1
12:15:13 PM 5/3/2018 V8i_IDOTRoadJ:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_A1.sht
LEGEND AND SURVEY CONTROL
SURVEY SYMBOLS UTILITY LEGEND SE COR. SEC. 35-81-24 E 1/4 COR. SEC. 35-81-24
IS P.I. 163+58.50 = P.I. STA. 163+58.5 AB IS P.I. 189+96.31 = P.I. STA. 189+98.0 AB
SB SHR Shrub Power Pole PINT NO 8000 FOUND MAG NAIL PINT NO 8001 FOUND I.D.O.T. ALUM. MON
DU Centerline Draw or Stream (Up) N = 7,556,329.479 E = 18,531,682.296 N = 7,558,967.255 E = 18,531,695.207
ST SEP Septic Tank Private Electric
D Centerline Draw or Stream (Down)
TEV Evergeen Tree Fiber Optic
EP Edge of Paved Roads (ML or SR)
| |
TLNL Tree Line Left Data / Phone
M ain St
SET 5/8"
M ain St
SNP Unpaved Shoulder
C Cable FD. C.M. RE-ROD
B BIN Grain Bin
TP TPD Telephone Pedestal FLUSH FLUSH
BNK Stream Bank Natural Gas
SIGN SI Sign
Sanitary Sewer Line 5/8 RE-ROD 5/8 RE-ROD
LP LP L.P. Tank 89.72'
PIP Pipe Culvert
Storm Sewer Line 71.41'
34.92'
BD Bridge Deck
PRO Profile Shot
Domestic Water 68.18°
FWD Wood Fence
FW Wire Fence NE EIm AVE.
GV
GV Gas Valve A/C CORNER IS
PLG Location of General Photo 38.65° 60.14' 41.13'
CROSS-TIED
WEL Well FACE OF
CU Back of Curb
EG Edge of Gravel Road 71.26° COR. PO.
81.14'
TLNR Tree Line Right
FD. MAG NAIL 36.97'
GDL Guard Rail (Rail and Cable) 70.43'
DIK Centerline of Dike or Dam BK OF CURB
EW Edge of Water CONC. ISLAND FD. C.M. 90.12'
RIP Rip-Rap
Flg FLG Flag Poles FLUSH FACE OF
IN Storm Sewer Intake FD. C.M. COR. PO.
WH WHD Water Hydrant FLUSH
MIS Miscellaneous
HDG Hedge Row
LUM Luminaire | |
BB
BB Billboard
TDC Tree Deciduous
OUT Tile Outlet
GU Gutter In Front of Curb
BL Topo Breakline
BLD Building or Foundation SECTION CORNER INFORMATION
GP
GP Guard Post (Less Than 4 Posts)
PR Electic Riser Pole
UV Underground Utility Vault
UB
UB Utility Box
SH Paved Shoulder
SIGN SL Speed Limit Sign
MH Utility Access (Manhole) TV Satelite TV Dish AS-BUILT VERTICAL PROFILE
SWK Sidewalk
SH SNK Sink Hole
UE Utility Elevation
MM
MM Mile Marker Post NAME LOCATION STATION FORWARD GRADE ELEVATION CURVE LENGTH
170
175
180
185
190
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER A.2
12:19:22 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_A2-A3.sht
ESTIMATED QUANTITIES AND REFERENCE INFORMATION
26 PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT-BASED STA 1,254.85 494.44 1,749.29 Refer to Typicals on sheets B.2, B.3 and the Specifications.
27 PAVEMENT MARKINGS REMOVED STA 1.70 1.70
17 SURFACING, DRIVEWAY, CRUSHED STONE
28 TRAFFIC CONTROL LS 0.74 0.26 1
29 FLAGGERS EACH 20.0 20.0 SUBDRAIN, LONGITUDINAL, (SHOULDER) 4 IN. DIA.
18
30 PILOT CARS EACH 10.0 10.0 19 SUBDRAIN OUTLET
31 MOBILIZATION LS 0.74 0.26 1 Refer to Tabulation on sheet C.1. Approximately 2734 cu. yds. of trench material from the subdrain installation shall be
1 1 disposed of by the contractor as per the Specifications.
32 MOBILIZATION, EROSION CONTROL EACH
REMOVAL OF PAVEMENT
22 Refer to Tabulation on sheet C.1. The concractor to dispose of removed pavement as per the standard Specifications.
SAFETY CLOSURE
23
ESTIMATE REFERENCE INFORMATION Refer to Tabulation on sheet C.1.
24 FIELD OFFICE
ITEM
DESCRIPTION
NO. 25 CONSTRUCTION SURVEY
This item does NOT include existing monument or centerline point preservation work which was done previously by others.
1 EMBANKMENT-IN-PLACE
Item includes 579 cu. yds for the culvert repairs, 988 cu. yds. for the guardrail grading, and 277 cu. yds. for the right turn lane.
26 PAINTED PAVEMENT MARKING
Material used for this bid item shall be obtained by the contractor and free of debris. No payment for overhaul will be allowed.
27 PAVEMENT MARKINGS REMOVED
2 TOPSOIL, FURNISH AND SPREAD
Refer to Tabulation on sheet C.1.
TOPSOIL, STRIP, SALVAGE AND SPREAD
3 28 TRAFFIC CONTROL
Quatity based on right turn lane work area.
Refer to the Traffic Control Plan, Tabulation sheet C.1.
4 GRANULAR SHOULDERS
Item includes 1500 tons for shoulders on sheet B.8, 807 tons for the right turn lanes, refer to sheet B.7, Quantity increased 10% 29 FLAGGERS - (use when project is constructed open to traffic)
for shoulder irregularities.
30 PILOT CARS - (use when project is constructed open to traffic)
5 PAVED SHOULDER, HOT MIX ASPHALT MIXTURE, 6 IN.
31 MOBILIZATION
Item includes 1255.5 sq. yds. for shoulders as per sheet B.8
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER A.3
12:21:54 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_A2-A3.sht
EXISTING SECTION AND MILLING SHEET
C
L
Existing Existing
Shoulder Shoulder
1 1
2.0% Slope 2.0% Slope
Bonded Overlays
Milling of existing pavement may be necessary to:
1) achieve the proposed profile, Existing Existing
2) reduce high spots to ensure minimum overlay Pavement HMA Pavement Pavement
thickness, Widening 2' 2' Widening
PCC Pavement
3) remove significant surface distortions (2 inches or
greater), and
4) match curb or adjacent structures.
For bonded overlays, milling to improve bonding is
a lower priority than items 2), 3), and 4). A minimum EXISTING PAVEMENT CROSS SECTION
of 4 in. PCC or 3 in. HMA of remaining pavement is
recommended after milling.
1
Pavement
Location
M C Milling
1
Pavement
Location
M C Milling
This sheet shows the typical cross Road Identification Station To Station
Remarks
Inches Feet Sq. Yds.
section for milling of existing pavement
as well as a tabulation of milling TYPICAL CROSS SECTION
PCC PAVEMENT MILLING
thickness and areas.
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER B.1
12:47:12 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_B1-B2.sht
BONDED AND UNBONDED TYPICAL CROSS SECTION
BONDED OVERLAY
1 Typical section shown may be modified appropriately in areas of
C super elevated curves or other locations specifically designated by
Note: The contractor shall pave proposed shoulders thru all unpaved side road, paved
side roads, and entrance intersections. At the existing paved intersections,
2 Overlay Quantities (Per Location) the existing pavement will be removed.
Location
S C L R PCC PCC T BW1 BW2 G
2 Remarks
Excavation Overlay Overlay
Road Station To Station Inches Feet Feet Feet Cu. Yds. Cu. Yds. Sq. Yds. Inches Feet Feet Feet
TYPICAL CROSS SECTION
PCC BONDED OVERLAY WITH BASE WIDENING
(AFTER PAVEMENT MILLING)
Note: The contractor shall pave proposed shoulders thru all unpaved side road, paved side
Overlay Quantities (Per Location)
Location roads, and entrance intersections. At the existing paved intersections, the existing
S C L R PCC PCC T BW1 BW2 G
2 Remarks pavement will be removed.
Excavation Overlay Overlay
Road Station To Station Inches Feet Feet Feet Cu. Yds. Cu. Yds. Sq. Yds. Inches Feet Feet Feet TYPICAL CROSS SECTION
PCC UNBONDED OVERLAY WITH BASE WIDENING
(AFTER PAVEMENT MILLING)
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER B.2
12:47:44 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_B1-B2.sht
BONDED PCC OVERLAY JOINTING (WITH AND WITHOUT WIDENING)
2
1 Minimum 4 ft. paved shoulder
Proposed Final Paint Line Spacing (Saw Cuts Match Existing Underlying Pavement)
12' 12'
4'-6' 4'-6'
Concrete Concrete
Transverse Overlay Joint
Shoulder Shoulder
X Width of new
A. Tie widening unit to existing concrete
Proposed Saw Cut Spacing Overlay
Bonded Concrete Overlay
Cut transverse joints to full depth plus 1/2". 6'-8' < 12.0' < 12.0' 6'-8' Transverse Joint
Match existing joint locations. PCC
Bonded 2 2 2
Overlay
WITH WIDENING
Concrete Original Pavement
1 1
Y
Saw Cut in
KEYED NOTES: Existing Slab
3
3
Existing
1 Epoxy coated No. 4 tie bar 36'' long at Concrete
30'' spacing. Drill and epoxy bars into Pavement
Place drainable subbase layer and
existing concrete
daylight to ditch foreslope or Z Underlying Crack
connect to working subdrain in Existing Slab
2 Full depth plus 1/2"
5 12' 12'
4'-6' 4'-6'
4
Concrete Concrete
Note:
Shoulder Shoulder
Overlay joint width shall be equal to or greater than crack width
Proposed Saw Cut Spacing of the existing slab. If "Y" is 0.50 in. or greater, the
6'-8' < 12.0' < 12.0' 6'-8'
PCC
underlying crack width in the existing slab should be
Bonded
Overlay
5 5 5 measured. If crack "Z" is 0.25 in. or greater, and existing
pavement does not have dowel bars, the joints should be
v
er Sh
ld ou
A. Refer to "Design Lessons Learned" in the document "Guide for ou ld
er
Sh
the Development of Overlay Construction Documents" for
BCOA TIE BAR LOCATIONS explanation on pavement widening drainage, location of tie bar, Original Pavement
WITH WIDENING location of sawcut, thickened edge, restraint and use of fibers. (Concrete or HMA)
KEYED NOTES:
BCOC or BCOA
4 Consideration shall be given to placement of epoxy coated tie bar at
mid-depth. Placement must allow adequate overlay thickness to
BONDED CONCRETE OVERLAY OVER CONCRETE OR ASPHALT
BCOC = Bonded Concrete Overlay over Concrete accommodate maximum sized aggregate under the bar and minimum 2"
above the bar. Tie bars are No. 4 bars 36" long @ 30" centers. WITHOUT WIDENING
BCOA = Bonded Concrete Overlay over Asphalt
KEYED NOTES
5 T/3 saw cut (do not sever bar)
This sheet illustrates the jointing layout for PCC bonded 7 If BCOC, then use full depth sawcut.
6 Existing widening unit:
overlays and widening units. For bonded overlays on if Asphalt, remove unit, If BCOA, then use T/3 sawcut.
concrete, new joints in the overlay shall align with existing if concrete, unit may remain if stable, and 3' wide,
if no widening unit, excavate and place drainable subbase.
joints. Transverse joints shall be cut to full depth plus
0.5 in. If construction is completed under traffic, a 4 ft
paved shoulder is recommended
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER B.3
12:50:14 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_B3-B4-B5.sht
UNBONDED PCC OVERLAY JOINTING (WITH AND WITHOUT WIDENING)
Unbonded Unbonded
Concrete Shoulder
Concrete
Overlay Shoulder Overlay
8" Min.
Widening Widening
3" Min.
Concrete Concrete
Original Original
Edge of existing pavement Pavement Pavement 6
Edge of overlay
1.5' 1.5'
'
C' Joint
2 Edge of overlay
Place drainable subbase
Edge of existing pavement
UBCOC OR UBCOA layer and daylight to ditch foreslope
2 or connect to working subdrain
PLAN VIEW
UNBONDED CONCRETE OVERLAY WITHOUT WIDENING
UNBONDED OVERLAY WITH WIDENING - JOINT LAYOUT UBCOA
For UBCOC without widening, see detail above
Note: Dimensions of panels may change based on project specifics for draining separation layer WIDENING DETAIL
L= Longitudinal Joint (T/3)
C= Sawed Transverse Joint (T/3) UNBONDED CONCRETE OVERLAY OVER
UBCOC = Unbonded Concrete Overlay over Concrete ASPHALT OR COMPOSITE WITH WIDENING
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER B.4
12:53:17 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_B3-B4-B5.sht
MISCELLANEOUS DETAILS
EXISTING EXISTING
PAVEMENT) overlays. For unbonded overlays, it is
PAVEMENT PAVEMENT
critical to connect the separation layer
to an acceptable drainage outlet.
INTERNAL
CHIMNEY
ADJUSTING RINGS
SEAL
NOTE: REMOVE EXISTING
PAVEMENT AROUND
MANHOLE AND REPLACE
SUBBASE SUBBASE
WITH CONCRETE
MATERIAL MATERIAL
WATER-TIGHT MASTIC
(FOR MOVEMENT)
MANHOLE
FORM 6 IN
CONCRETE OVERLAY DRAINAGE OF SEPARATION LAYER INTO INTAKE
(GUTTER)
MILLING
GRADE
ELEV.
T
EXISTING PAVEMENT
GRADE
ELEV.
T EXISTING PAVEMENT
Separation Layer
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER B.5
12:54:06 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_B3-B4-B5.sht
BONDED OVERLAY
TRANSITION AREA (AT END OF OVERLAY)
2 IN. MIN.
6
PROFILE TRANSITION DETAILS
DOWEL
1
1 USE 40:1 TAPER FOR SPEED 45 MPH OR
GREATER. USE 25:1 TAPER FOR SPEEDS
LESS THAN 45 MPH
TRIM SUBBASE
EXISTING CONCRETE
PAVEMENT (BRIDGE
APPROACH OR
PAVEMENT UNDER
BRIDGES)
EXISTING TRANSVERSE JOINT NOTE: RECOMPACT AND RESHAPE EXISTING SUBBASE IF THE SECTION IS UNDER BRIDGE, THE EXISTING PAVEMENT
TAPER MILLED INTO SURFACE IN AREA OF TRANSITION AND RECONSTRUCTION. MAY REQUIRE RECONSTRUCTION TO INCREASE THE THICKNESS
TO PROVIDE FOR EQUAL LOAD - CARRYING CAPABILITIES AS
THE OVERLAY SECTION.
TRANSITION AREA
H BONDED
OVERLAY EXISTING ASPHALT
H+3 IN. TRIM SUBBASE
OR CONCRETE FOR
EXISTING
BRIDGE APPROACH
ASPHALT 1
PAVEMENT 20
FT:
1 IN.
EXISTING ASPHALT PAVEMENT
OR
COMPOSITE PAVEMENT
6 FT 6 FT
3 IN.
EXISTING ASPHALT PAVEMENT
DOWEL IF CONCRETE
IF LESS THAN 5" THEN TAPER IS NOT NEEDED PAVEMENT THICKNESS
IS 8 IN. (200 MM) OR
NOTE: RECOMPACT AND RESHAPE EXISTING SUBBASE
GREATER
IN AREA OF TRANSITION AND RECONSTRUCTION.
MILL AND FILL PROFILE TRANSITIONS FOR BONDED CONCRETE OVERLAYS ON END TRANSITION BONDED OVERLAY ON ASPHALT TRANSITION
SEPARATION LAYER
EXISTING PAVEMENT
3 IN.
This sheet provides typical profile transition details for PCC bonded and unbonded overlays. The transition length is dependent on the speed limit
of the roadway. A common taper for vertical transition is 40:1. The thickness of the transition/reconstruction section must be designed with the
underlying support conditions and anticipated traffic in mind
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER B.6
12:55:04 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_B6-B7-B8-B9.sht
RIGHT TURN AND BRIDGE APPROACH DETAILS
Notes: C
L of Roadway
imiar f
l or construction 4
1 Detaiss
l hall be s
on either si by s
de ( tationing) of roadway. Keyed
1
12.0' D AL E C
3 Pavement f or auxii
laryl ane sh l be
al
2.0% 3
constructed according to requirements T Pavement
3.0' Earth Shoulder
specified for through roadway pavement. 4.
0% Construction
4.
0%
4 For Joint detaiss
l ee Standard Joint detais
l 4.
0%
PCC Overlay
FS
Ex
2 ist
ing 1
Fo
8'' Granular re Pr
Granular sl op
Material op .
Shoulder e Fo
re
sl
Excav. op
e
& Embankment-
Design Quantities Per Location (Includes the taper and the return)
In-Place
LOCATION
PCC Granular Embankment Earth Shldr. Granular
D E T AL C FS
Pavement Material In-Place Excavation Construction Shoulder
ROAD IDENTIFICATION STATION TO STATION SIDE Feet Feet Inches Feet Feet Sq. Yds. Cu. Yds. Cu. Yds. Cu. Yds. Sta. Tons TYPICAL HALF SECTION
PCC RIGHT TURN LANE
175
(Use As Constructed)
Sta. 170+56
+88 +40
+63 +15
This sheet illustrates a typical cross section for a right turn OPTIONAL RIGHT TURN
lane and a plan view of a bridge approach. AND BRIDGE APPROACH
DETAILS
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER B.7
12:55:35 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_B6-B7-B8-B9.sht
SHOULDER AND PAVED ACCESS DETAILS
Notes:
Quantities have been determined on the basis of
E
a design weight of 140lbs. per cubic foot.
PLAN
LOCATION
TONS T E SECTION A-A
ROAD IDENTIFICATION STATION TO STATION SIDE 3 Inches Feet
C Si
de Road
L
Note:
Edge of PCC
Overlay Pavement
Existing Paved
Side Road or
Driveway
17'
E
Vari
abl
e
D
PCC
Prop. PCC 4.
O% Overlay
Pavement
Exi
st
ing Proposed
Excavation For
es 3.5'' Minimum
l
op
e
HMA Thickness
QUANTITIES 1
Location 5
D E Paved Hot Mix Tack Asphalt Earth Shldr.
Excavation Shoulder Asphalt Coat Binder Constr.
Road Identification Station to Station Side Inches Feet Cu. Yds. Sq. Yds. Tons Gals. 2 Tons Stas.
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER B.8
12:56:29 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_B6-B7-B8-B9.sht
GUARDRAIL AND PAVED SHOULDER DETAIL
2
Form Board Required
20'
4 A
Edge of
Normal Shoulder C
Edge of
Final Guardrail Normal Shoulder
Location
1
B B
0:
1
3
P
4%
Edge of Pavement C A
1
Nor
ma
lFor
esl
ope
Note: Hinge Point
Normal
Shoulder
Edge of Width
Pavement
4.
O%
1
0:1
Mainline
Pavement Paved Shoul
der Variable Slope
24''
1
Nor
3'' ma
lF
ores
2 lope
Hinge
Point
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER B.9
12:57:40 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_B6-B7-B8-B9.sht
QUANTITY TABULATIONS
POINTS OF ACCESS
TABULATION OF SAFETY CLOSURES
Refer to Cross-Sections
PAVEMENT MARKINGS
* See Typical 9001 for 'A' and 'B' designation
2 Broken Center Line (Yellow) 5 No-Passing Zone Line (Yellow) 7 Edge Line Right (White) 9 Dotted Line (White) 11 Channelizing Line (White) 13 Stop Line (White) 15 Yellow Curb 17 Yield Line (White)
3 Double Center Line (Yellow) 6 Broken Lane Line (White) 8 Edge Line Left (Yellow) 1O Solid Lane Line (White) 12 Channelizing Line (Yellow) 14 Crosswalk Line (White) 16 White Curb 18 Double Dotted Line (Yellow)
Coarse Aggregate
Area Saw Cut* Intakes and
Pavement Existing Pavement
Station to Station Utility Accesses Remarks TYPE Detail
Type No. Location Pavement Durability Thickness Reinforcement
(Sq. Yds.) (Lin. Ft.) (No.) Crushed Source Typical
Gravel Class
(Type) Stone (Inches) (Type)
FULL-DEPTH PATCHES
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER C.1
12:59:05 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_C1.sht
EXISTING ROADWAY PLAN AND PROFILE FOR REFERENCE ONLY
This sheet is a placeholder to provide plan and profile information for the
existing roadway where the PCC bonded or unbonded overlay is to be
placed. The plan and profile for the existing pavement is used for reference
only and, typically, the PCC overlay profile is not included in the design
drawings. OPTIONAL ROADWAY PLAN AND PROFILE
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER D.1
1:00:16 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_D1.sht
STAGING AND TRAFFIC CONTROL NOTES
1 Through traffic on Mainline shall be staged to allow work under traffic and work while detoured. STAGE 1
Mainline detour route (refer to map on sheet A.1) shall be signed and maintained by the jurisdiction TRAFFIC CONTROL
Maintenance personnel. The contractor shall provide a 2 week notice to the engineer before any A minimum of one traffic lane shall be maintained on Mainline during daytime hours.
detour use is allowed. During night time hours lane closures will not be allowed.
2 The contractor shall maintain access at all times for residents who live and work along mainline,
CONSTRUCTION
including school bus traffic. No more than two (2) side roads closed at any time.
Full Depth Patching
Pavement Milling
3 Traffic control on the project shall be in accordance with MUTCD, current edition.
4 STAGE 2
Unless otherwise directed, the contractor shall take appropriate measurements of the existing
pavement marking prior to removing or obliterating them to insure their replacements are positioned Phase 2A
in similar locations. TRAFFIC CONTROL
Through traffic on Mainline shall be detoured (refer to Detour #1 map on sheet A.1).
5 If Mainline is open to traffic, no lane closures will be allowed during the following events:
CONSTRUCTION
Excavation for PCC Widening and Subbase Placement
PCC Inlay Pavement / PCC Reconstruction Areas / PCC Overlay Pavement
Right turn lane construction
PCC / HMA tie - in work at side roads
Granular Shoulders
Paved Shoulders
Guardrail updates
COORDINATED OPERATIONS
Pavement Markings
Other work in progress during the same period of time will include
the construction of the projects listed. Coordinate operations with
those of other contractors working within the same area.
Phase 2B
TRAFFIC CONTROL
Through traffic on Mainline shall be detoured
CONSTRUCTION
Excavation for PCC Widening and Subbase Placement
PCC Overlay and Widening / PCC Reconstruction Areas
Right turn lane construction
PCC / HMA tie-in work at side roads
Granular Shoulders
Paved Shoulders
Guardrail updates
Pavement Markings
This sheet is required to list specific staging notes and criteria that the
contractor will need to follow during construction. If specific staging or phasing
is required, it is recommended to list specific staging criteria instead of drawing
detailed staging plans. This gives the contractor flexibility in setting up staging
operations and possibly making construction operations more efficient. It is
critical that the contractor submits traffic control and staging plans for review
OPTIONAL STAGING AND
prior to construction.
TRAFFIC CONTROL
ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER J.1
1:01:31 PM 5/3/2018 V8i_IDOTRoadJ:\2013_projects\113.0057\OVERLAY
V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_J1.sht
COMPLETED OVERLAY (Two-Lane Roadway with Paved Shoulders, Conventional Paver) Remaining Paved Paved Remaining
LEGEND
shoulder shoulder shoulder shoulder
12ft(3.7mllane � Stage work area
Pavement (Typical)
Applied to: marking -c---�-<l----'---�
� Concrete
Rumble strip---,-- -
-+---,
@Bonded concrete overlay of concrete pavements 0unbonded concrete overlay of concrete pavements Finished
shoulder
D (e.g.,
Base shoulder widening materials
cement-treated base, porous
@Bonded concrete overlay of asphalt pavements 0unbonded concrete overlay of asphalt pavements concrete, roller compacted con
S81N joint crete (RCC). asphalt. or concrete)
@Bonded concrete overlay of composite pavements 0unbonded concrete overlay of composite pavements
with tied steel � Granular material
COMPLETED OVERLAY
NOTES:
STAGE 1. Repair surface, prepare for overlay, and construct base shoulder
widening and separation layer Construction area t, Traffic CD Follow jurisdictional requirements
!-+---�====---,-, con�rol (D for traffic control devices.
device
• Install traffic control and close the left lane. Follow • Prepare for shoulder widening by trenching the !.. i Existing [ Existing @ Treat 3 It 10.9 ml area outside of
jurisdictional requirements for traffic control. Check existing shoulder and trimming to the specified I shoulder Vehicle traffic shoulder proposed paved shoulder with
rI
I
with jurisdiction regarding allowable lane closure width. The trench should be rolled and compacted i.. f .1
Typ1cally
11 ft(3.4m)lane calcium chloride. If the existing
length. If surface repair and preparation for the as necessary to obtain a firm and stable platform as j !Typical) shoulder outside the proposed
specified in the contract documents. A continuous , less than.
overlay are minimal, then slow-moving traffic control I.a ·
0.25m1 paved shoulder is less than 3 ft
may be appropriate. Closing the lane may require progression approach with the shoulder trencher ·
j (0.40km) (0.9 m), it may be necessary to
additional traffic control (e.g., signals, flaggers, and/or and placement of the base shoulder widening • without adjust the slipform paver and/or
pilot cars). material is encouraged. pilot ar
t paver control to accommodate the
• Repair the surface as appropriate. Prepare the surface • Construct separation layer (only for unbonded ja Base shoulder reduced space.
I widen. i ng
for the overlay (or, in the case of concrete overlay on overlay on concrete).
concrete, the separation layer) as described in the i I material
Existing subbase @ Minimum lane width next to the
contract document. j.o. I paver may be reduced for short
term, stationary work on low
i I volume, low-speed roadways when
ST A GE 1 vehicular traffic does not include
longer and wider heavy commercial
vehicles.
STAGE 2. Construct right shoulder and concrete overlay
0 © lf the overlay is opened to traffic
Vehicle traffic Construction area in this stage, and final shoulder
• Shift the traffic control to the left lane and close the typical machine adjustment. Speeds should be 11 ft (3.4 mllane backfill is delayed, place fillet as
right lane to traffic. The length of the closure will additionally restricted adjacent to paver when (Typical) shown or (if overlay creates a
depend on the jurisdiction's maximum closure length clearance between the paver and vehicle traffic is dropoff greater than jurisdictional
Shoulder Varies
with pilot car. Traffic controls and traffic control tight !-+-�,_
______ __� -+,
- allowance) place granular shoulder.
CD��:� ---
signals will be based on jurisdictional requirements. • Construct concrete overlay on the existing Concrete
fillet placed ® See centerline fillet illustration and
• Repair and prepare the surface for the overlay or the pavement. Complete right PCC shoulder widening with overlay subsequent removal on figure 103.
separation layer and subsequent overlay as described with the overlay. Bull float work shall operate from device ®.
in the contract documents. Construct separation layer the outside shoulder only. © ® For "X" less than 4 ft (1.2 m),
(for unbonded overlay). adjustments to paver may be
•The "X" dimension between the roadway centerline necessary to accommodate paver
• Normal space for the paver stringline is 1-1.50 ft (0.30- and vertical panel is for the paving machine track Concrete thickened control and paver track.
0.46 m) and the paver track is a minimum of 2.50-3 ft and stringline. Concrete paved shoulder
Varies (j) The "X" dimension can be reduced
(0.76-0.91 m). 1 ft (0.3 m) incremental encroachment overlay placement
reduction (up to 2 ft (0.6 m) total) is common through Surface repair to 3 ft (0.9 m) minimum when the
Existing pavement right lane is used as paver control.
Separation layer @ Mark edgelines and centerlines per
(only for unbonded overlay on concrete) MUTCD IFHWA 2009) section 6F.77
STAGE 2
(mark both lanes).
STAGE 3. Construct left lane concrete overlay ® Construct longitudinal joint.
(j)
Vehicle traffic
• Close the opposite lane to traffic and place the • If the outside edge dropoffs at the shoulder exceeds 11 ft(3.4m)lane
(T�pical) Remaining
concrete overlay according to contract documents, the jurisdictional allowance for a 1:1 fillet, then Concrete shoulder
using the same procedures as described in stage construct the granular shoulders in this stage. fillet placed
2. Note that stringline may not be necessary for the • Complete shouldering. Install (mill) rumble strips with overlay
right edge of the paving when the paved overlay in the paved shoulders and complete pavement
constructed in stage 2 is used as the paver control in marking and regulatory signing in accordance with
this stage. If the right stringline is not used, the "X"
dimension could possibly be reduced to 3 ft (0.9 m).
contract documents. Over1ay of
Two-Lane Roadway
with Paved Shoulders
:=:::================================::;----------------' STAGE 3
(Conventional Paver)
The sheet provides guidance for staging work when the roadway is open to traffic d uring construction. This staging
diagram, as well as others, are found in Chapter 6 of the Guide to Concrete Overlays (Third Ed ition), May 2014.
EN;LISH 10\IA DDT DESIGN TEAM
I OPTIONAL STAGING CONSTRUCTION OPEN TO TRAFFIC
SHEET tt.MIER
I
COLNTY PROJECT t«..MIER J •2
1:02:46 PM 5/3/2018 VBLI00TRoadJ:\2013_projects\113.0057\0YERLA Y REFERENCE GUIDE\10-04-2017\77069 \00_JZ.sht
STAKING LAYOUT
O 25
FEET
NOTES:
1. For the Rt. Turn Lane pavement quantities and additional information, refer to detail on sheet B.7.
2. For Jointing details, refer to sheet L.2.
215
Prop. HMA Fillet
M atch Line Sta. 212+00, refer to sheet L.1
4%
4%
Special
+73
Shaping
12'
Proposed Offset Rt. Turn Lane
4%
Sta. 210+18.69-12.0' Rt.
Special
50' R
Shaping
Transition
Sta. 216+04.69-83.43' Rt.
C ENGLISH IOWA DOT DESIGN TEAM COUNTY PROJECT NUMBER SHEET NUMBER L.1
1:03:47 PM 5/3/2018 V8i_IDOTRoad J:\2013_projects\113.0057\OVERLAY REFERENCE GUIDE\10-04-2017\77069100_L1-L2.sht
-
JOINTING I AYOUT
91!!!1m �
1�1
-
\
It)
0
I
rr,_
I
) I I-> I
-------
-
-
I
------------------
IL-< L-Z
- "'
IL-2 L-2 IL- -
JOINTING DETAILS
at Sta. 1105+63
\
\ (
�- Prop. PCC Pavement
--
NOTES:
-
I. Full Depth Rt. Tum Lane and Intersection Paving:
Transverse Joints are "CO" Joints "1th 12' spacing. 0
It)
0 2. PCC Overlay Pavement Jointing:
Refer to sheets B.3 - B.4.
rrr ->
I
) -> I
-------------------
-
------
-• -
1-7
- - ,_ - I
I I I I
I
I
LJ� 8q
I I
\ This sheet provides a diagram of joint types and
locations at intersections or turn lanes when the
I joint type differs from the typical cross section. OPTIONAL JOINTING LAYOUT
C EN;LISH I 10\IA DDT DESIGN TEAM COLNTY PROJECT tl.MIER I SHEET tf.HIER L.2