You are on page 1of 2

hange E hange E

XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y
NOTES

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

+7.90 +7.90
GENERAL
3,500
23 23
2T12-23 All dimensions are shown in mm

T8-150-01'

T8-150-01'
150
23

900

900
300
unless otherwise

'
01
4T16-02 5T16-06

150
300

300
specified
LINKS: T8-150-01' 23 23 23 +7.00 +7.00 +7.00 +7.00
200

Drawings are not to be scaled.

200
200

200

200
SECTION 23-23

3T12-23 23
Only figured dimensions to be
M Q
used.
BM19: 300X200MM
The contractor must check
2,950 and verify all dimensions on site
2T12-24 4T16-02 4T16-04 5T16-06 5T16-08
before commencement of worK
24
CONSTRUCTION
24 24

150
300

300

300
LINKS: T8-150-01' 02 02 04 04 06 06 08 08

'
01
150

3,300
3,300

3,300

3,300
24 24
All slabs at ground to be poured

T8-150-01'

T8-150-01'

T8-150-01'

T8-150-01'
2T12-24 24 200

SECTION 24-24
over 1000 gauge polythene sheet
M BM20: 300X200MM Q DPM
on 50mm thick stone dust or
3,100 murram

7,900

7,900
2T12-25 on approved grade hardcore
25 25 25
+3.50 +3.50 +3.50 +3.50 fillings.

150

7,000

7,000
All soil under the slabs
300

150 150
150 150

150 150

150 150
300

300

'
01
LINKS: T8-150-01'

300
300

300

300
150
25 25 and all around external
foundation to be
200
2T12-25 25 SECTION 25-25

treated with anti-termites


7 BM21: 300X200MM 11 insecticide
CIVIL
1,720
01 01 03 03 05 05 07 07

T8-150-01'

T8-150-01'

T8-150-01'

T8-150-01'
2T12-26 26 26
All soils on cut embarkment
26

150
to be stabilised. The slope not to

3,200
3,200

3,200

3,200
300

'
01
300

300

150
LINKS: T8-150-01'
26 26
4T16-01 4T16-03 5T16-05 5T16-07
exceed the natural angle of
repose.
200

SECTION 26-26
2T12-26 26
STRUCTURAL
B BM22: 300X200MM D

Ground Ground Ground Ground


All vegetable and black cotton
2,220 +0.00 Floor +0.00 Floor +0.00 Floor +0.00 Floor
soil
2T12-27 to be removed from below
27

300
300

300
300

300
300

300

300
G.B: 200X200MM G.B: 200X200MM G.B: 200X200MM G.B: 200X200MM
all buildings andpaved surfaces
300

300

For all R.C work,


27 27
LINKS: T8-150-01'
150

Refer to the Structural Engineers


300

'
01
150

2T12-27 27 27 27 COLUMN C01: COLUMN C02: COLUMN C03: COLUMN C04: details
200 200x200 MM 200x200 MM 300x200 MM 300x200 MM
SECTION 27-27 Depth of foundations to be
2 BM23: 300X200MM 5
determined
200 200 200 200
300 300
300 300
on site to Structural Engineers
approval.
01 01 02 02 07 07 08 08
01' 01' 03 03 04 04 01' 01'

200

200
200

200
01' 01' 05 05 05 06 06 06

200

200
01' 01' 07 07 08 08

200

200
01 01 02 02 03 04
03 04
1,900 05 05 05 06 06 06

COLUMN C01:
SECTION 01-01
COLUMN C01:
SECTION 02-02 COLUMN C02: COLUMN C02:
COLUMN C03:
COLUMN C04:
SECTION 07-07
COLUMN C04:
SECTION 08-08 All walls less than 200mm thick
3T12-28
SECTION 03-03 SECTION 04-04 COLUMN C03:
SECTION 05-05 SECTION 06-06

28 28 28 28 to be reinforced with hoop irons


at every alternating course.
150
300

300

300

LINKS: T8-150-01'
'
01

All adjacent R.C works and


150

28 28

2T12-28 28 200 masonary wall to be tied with


SECTION 28-28
strap iron at every course.
2 BM24: 300X200MM 5 MECHANICALS

2,500 All plumbing and drainage works


2T12-29 Dowels Dowels to comply with RBS specifications
29
29 29

1,000
1,000

1,000
1,000
150
300

300

LINKS: T8-150-01'
300

'
01
150

29 29 REVISIONS
2T12-29 29
NO DESCRIPTIONS DATE
200

SECTION 29-29

150

150
BM25: 300X200MM 5 150MM THK 150MM THK

300

300
G.SLAB G.SLAB

4T12 4T12

1,700

1,700
2,000

2,000
T8-100 T8-100

01 01 02 02 PROJECT DETAILS

CONSULTANT:

250

250
LOCATION:
50MM Thk blinding 50MM Thk blinding

50

50
concrete concrete
1,000
1,400
DRAWN BY:
CHK'D BY:
SCALE: AS SHOWN

5T12-01-150B2
DATE: APRIL - 2020

7T12-01-150B2
DRAWING TITLE

1,400
1,000
BEAM, COLUMNS AND FOOTING
DETAILS
5T12-01-150B1
7T12-01-150B1
1,000 PAPER SIZE: A0
1,400
COLUMN BASE CB1 DRAWING CODE / SHEET NUMBER
COLUMN BASE CB2

GSPublisherVersion 0.87.100.100
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y
NOTES

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

GENERAL
A B C D E F G H I J K L M N O P Q
A B C D E F G H I J K L M N O P Q All dimensions are shown in mm
unless otherwise
specified
Drawings are not to be scaled.

RHS 100X50X2

RHS 100X50X2

RHS 100X50X2
17 17
17 C01 C01 C01 C01 C01 C01 C01 17 Only figured dimensions to be

695
16 16
16 16
RB: 200X200MM RB: 200X200MM RB: 200X200MM RB: 200X200MM RHS 100X50X2 used.

900
The contractor must check

695
1,435
970 970

15 15
15 RHS 100X50X2 150mm thick slab 15 and verify all dimensions on site
RB: 200X200MM

RB: 200X200MM

RB: 200X200MM
with T12@150mm before commencement of worK

870
RB: 200X200MM
RHS 100X50X2
14
FL: C02 C02 C02 C02 FL: C01
14
14 14 CONSTRUCTION

1,435
RB: 200X200

RB: 200X200
7.00 7.00

1,100
13 RHS 100X50X2 13
13 13
TRUSS 01 TRUSS 01 All slabs at ground to be poured
C01 C04 12 12 over 1000 gauge polythene sheet

RB: 200X200MM
12 12 200 500
625 625 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 750 DPM
11 11
11 11 on 50mm thick stone dust or

2,000

2,000

2,000
C02 C02 C02
RB: 200X200MM

RB: 200X200MM RB: 200X200MM RB: 200X200MM murram


on approved grade hardcore
C01 10 10
10 C02 C04 C04 RB: 200X200MM 10 9 9 fillings.
9 9 TRUSS 01 TRUSS 01
RB: 200X200MM All soil under the slabs
8 8 and all around external

1,700

1,700

1,700
8 8
FL: FL: foundation to be
FL:
7.00 7.00
7.00 treated with anti-termites
RB: 200X200MM 7 7
C03 insecticide

RB02: 300X200MM
7 7 6 TRUSS 01 TRUSS 01 6
C01

RB: 200X200MM
RB: 200X200MM

6 C01 C02 6
CIVIL
RB: 200X200MM

200

2,300

2,300

2,300
850 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 750
All soils on cut embarkment
to be stabilised. The slope not to
C01 TRUSS 02 TRUSS 02 exceed the natural angle of
5 5
5 5 repose.
RB: 200X200MM

1,200

1,200

1,200
RB02:300X200MM STRUCTURAL
C01 RB: 200X200MM C04 RB02: 300X200MM C02 RB: 200X200MM C03 TRUSS 02 TRUSS 02
4 4
4 4
1,167 1,167 1,167
All vegetable and black cotton

950
soil

1,440

1,440
3 3
RB: 200X200MM

RB: 200X200MM
3 3
C01 to be removed from below

RHS 100X50X2

RHS 100X50X2

RHS 100X50X2

RHS 100X50X2
RB: 200X200MM

2 2
2 2
all buildings andpaved surfaces

1,000
FL: FL: TRUSS 03 For all R.C work,

1,440

1,440
7.00 7.00 Refer to the Structural Engineers

1,000
details
C01 1,167 1,167 1,167 TRUSS 03 Depth of foundations to be
RB: 200X200MM RB: 200X200MM 1 1
1 1 determined
C01 C01
on site to Structural Engineers
approval.
A B C D E F G H I J K L M N O P Q
A B C D E F G H I J K L M N O P Q All walls less than 200mm thick
to be reinforced with hoop irons
RING BEAM LAYOUT ROOF TRUSS LAYOUT
at every alternating course.
All adjacent R.C works and
masonary wall to be tied with
strap iron at every course.
MECHANICALS

350 All plumbing and drainage works


150 150
350
350
to comply with RBS specifications
250 1,2 7 1, 1,2 250
10 27 10
27
850

1,1 10 10
794

794

1, 1, 7 1,1
1,2 1,2 50
738

738

50 7
681

681

1,0 50 27 50
27
625

625

1,1 1,1 99 99
569

569

1 99 7 1,
513

513

99 1,0 1
456

456

REVISIONS

750
200 200

900
370 880 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 880 370

TRUSS 01
16,900
3T12
250 200
NO DESCRIPTIONS DATE
TOP & BOTTOM CHORDS: 40X40X3

50
3T12

300
VERTICALS & DIAGONALS: 40X40X2 T8-150

200
PURLINS: 40X40X2 T8-150 T8-150

150

150
MATERIAL: S275
3T12 3T12

200 200 T10-150 200

350 350 TYPICAL RING TYPICAL RING Ring beam with gutter
BEAM SECTION BEAM SECTION & Parapet details.
RB:200X200MM RB02 :300X200MM

1, 1, 150
250 2 27 4 27 250
1,1 27 02 1,2
880

1,1 98 1, 2 27 4
789
787

1,1 98 1, 1,2 02 1,1


728
723

33 33 39
667
660

1,1 39
606

70 86
596

1,1
545
533

1 1,0
484
470

70 1
435
430

430
423
56
9

200
370 550 550 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 380 570
15,620
TRUSS 02
TOP & BOTTOM CHORDS: 40X40X3
VERTICALS & DIAGONALS: 40X40X2
PURLINS: 40X40X2
MATERIAL: S275

350 350
PROJECT DETAILS

150 150
250 1,1
20 1,2 250
CONSULTANT:
850

72 20
1,2
699
611

548

71 1,0
58
430

1,0 LOCATION:

200
370 880 1,000 1,000 1,000 980 370 400
6,200

TRUSS 02
TOP & BOTTOM CHORDS: 40X40X3
VERTICALS & DIAGONALS: 40X40X2
DRAWN BY:
PURLINS: 40X40X2

CHK'D BY:
MATERIAL: S275

SCALE: AS SHOWN
DATE: APRIL - 2020
1

DRAWING TITLE
BOTTOM CHORD

4 ANCHOR
BOLTS

RING BEAM 200X200X10 STEEL PLATE


GRADE 275 RING BEAM AND ROOF TRUSS
LAYOUT
1

SECTION 1-1

10MMWELDS
(2SIDES)
PAPER SIZE: A0

BOTTOM CHORD
DRAWING CODE / SHEET NUMBER

GSPublisherVersion 0.87.100.100

You might also like