Length (in m) Width (in m) Thickness(in m) Volume (in m^3) Pieces

Footing 0.34 0.25 0.13 0.01105 10


Column 0.34 0.34 3.7 0.42772 10
Beams 35 0.25 0.34 2.975 1
Slabs 6.5 5.2 0.01 0.338 1

TOTAL:
Total Volume(in m^3) Parameter(in kg/m^3)
0.1105 Concrete
4.2772 Rebar:
2.975 Column 270
0.338 Beam 190
Slabs and Footing 90
7.7007
Unit cost ( in /m^3& //kg Quantity(in m^3) Total Cost(in ₱)
3500 7.7007 26952.45

60 4.2772 69290.64
60 2.975 33915
60 0.4485 2421.9

TOTAL COST: 132579.99


N / mm² Length (in mm)
Fc' 21 Column 340
Fy 276 Dimension (in mm)
Steel 12

COLUMN
Length (in m) 2.75
Width (in m) 2.17

KN/m²
Slab dead load 2.4
live load 2

Kpa
Ultimate Load Combination 6.08
Kn
Pu 36.2824
Width (in mm) Area (in mm²) in mm²
340 115600 Ag 115600
Quantity Total (in mm): in mm
8 452.389342176 Ast 452.389342176
in KN
Pn 2180.24
Pu 1133.7248
Therefore:Pu= 1133.72KN > Pu=36.28KN
Thus, column is safe for Dead load and live load.