LONGITUDINAL CRITICAL FRAME DEAD LOAD
GROUND FLOOR
❖ TIE-BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑠𝑙𝑎𝑏 = (23.6 𝑚3 ) (0.6𝑚)(2.25 𝑚) = 31.86 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(2.25𝑚) = 2.475 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(2.25𝑚) = 2.475 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(2.25𝑚) = 2.475 𝑚
SECOND FLOOR
❖ FLOOR BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑠𝑙𝑎𝑏 = (23.6 𝑚3 ) (0.15𝑚)(2.25 𝑚) = 7.965 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(2.25𝑚) = 2.475 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(2.25𝑚) = 2.475 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(2.25𝑚) = 2.475 𝑚
ROOF BEAM
❖ ROOF BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
𝑘𝑁 𝑘𝑁 𝑘𝑁 𝑘𝑁 𝑘𝑁
𝑇𝑜𝑡𝑎𝑙 = 2.124 + 0.234 + 0.1949 + 0.0907 + 0.0315
𝑚 𝑚 𝑚 𝑚 𝑚
𝑘𝑁 𝒌𝑵
+ 0.1125 = 𝟐. 𝟕𝟖𝟕𝟔
𝑚 𝒎
❖ ROOF BEAM 2
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
𝑘𝑁 𝑘𝑁 𝑘𝑁 𝑘𝑁 𝑘𝑁
𝑇𝑜𝑡𝑎𝑙 = 2.124 + 0.234 + 0.1949 + 0.0907 + 0.0315
𝑚 𝑚 𝑚 𝑚 𝑚
𝑘𝑁 𝒌𝑵
+ 0.1125 = 𝟐. 𝟕𝟖𝟕𝟔
𝑚 𝒎
❖ ROOF BEAM 3
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
𝑘𝑁 𝑘𝑁 𝑘𝑁 𝑘𝑁 𝑘𝑁
𝑇𝑜𝑡𝑎𝑙 = 2.124 + 0.234 + 0.1949 + 0.0907 + 0.0315
𝑚 𝑚 𝑚 𝑚 𝑚
𝑘𝑁 𝒌𝑵
+ 0.1125 = 𝟐. 𝟕𝟖𝟕𝟔
𝑚 𝒎
TRANSVERSE CRITICAL FRAME DEAD LOAD
GROUND FLOOR
❖ TIE-BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑠𝑙𝑎𝑏 = (23.6 𝑚3 ) (0.6𝑚)(3.75 𝑚) = 53.1 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(3.75𝑚) = 4.125 𝑚
❖ TIE-BEAM 2
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑠𝑙𝑎𝑏 = (23.6 𝑚3 ) (0.6𝑚)(3.75 𝑚) = 53.1 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(3.75𝑚) = 4.125 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(3.75𝑚) = 4.125 𝑚
SECOND FLOOR
❖ FLOOR BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑠𝑙𝑎𝑏 = (23.6 𝑚3 ) (0.15𝑚)(3.75 𝑚) = 13.275 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(3.75𝑚) = 4.125 𝑚
❖ FLOOR BEAM 2
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑠𝑙𝑎𝑏 = (23.6 𝑚3 ) (0.15𝑚)(3.75 𝑚) = 13.275 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(3.75𝑚) = 4.125 𝑚
𝑘𝑁
𝑊𝑓𝑙𝑜𝑜𝑟 𝑓𝑖𝑛𝑖𝑠ℎ𝑒𝑠 = (1.10 𝑘𝑃𝑎)(3.75𝑚) = 4.125 𝑚
ROOF BEAM
❖ ROOF BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
𝑘𝑁 𝑘𝑁 𝑘𝑁 𝑘𝑁 𝑘𝑁
o 𝑇𝑜𝑡𝑎𝑙 = 2.124 𝑚
+ 0.39 𝑚
+ 0.195 𝑚
+ 0.0623 𝑚
+ 0.0315 𝑚
+
𝑘𝑁 𝒌𝑵
0.1875 = 𝟐. 𝟗𝟗𝟎𝟑
𝑚 𝒎
❖ ROOF BEAM 2
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
𝑘𝑁 𝑘𝑁 𝑘𝑁 𝑘𝑁 𝑘𝑁
o 𝑇𝑜𝑡𝑎𝑙 = 2.124 𝑚
+ 0.39 𝑚
+ 0.195 𝑚
+ 0.0623 𝑚
+ 0.0315 𝑚
+
𝑘𝑁 𝒌𝑵
0.1875 = 𝟐. 𝟗𝟗𝟎𝟑
𝑚 𝒎
❖ ROOF BEAM 3
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝑘𝑁 𝑘𝑁
o 𝑊𝑏𝑒𝑎𝑚 = (23.6 𝑚3 )(0.3𝑚)(0.3𝑚) = 2.124 𝑚
GROUND FLOOR
❖ TIE-BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(2.25𝑚) = 4.275
𝑚
❖ TIE-BEAM 2
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(2.25𝑚) = 4.275
𝑚
❖ TIE-BEAM 3
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(2.25𝑚) = 4.275
𝑚
SECOND FLOOR
❖ FLOOR BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(2.25𝑚) = 4.275
𝑚
❖ FLOOR BEAM 2
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(2.25𝑚) = 4.275
𝑚
❖ FLOOR BEAM 3
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(2.25𝑚) = 4.275
𝑚
ROOF BEAM
❖ ROOF BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
33.3% 𝑡𝑜 100% 𝑠𝑙𝑜𝑝𝑒 𝑤𝑖𝑡ℎ 20 𝑡𝑜 60 𝑚2 𝑇𝑅𝐼𝐵𝑈𝑇𝐴𝑅𝑌 𝐴𝑅𝐸𝐴 = 0.70 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (0.70 𝑘𝑃𝑎)(2.25𝑚) = 1.575
𝑚
❖ ROOF BEAM 2
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
33.3% 𝑡𝑜 100% 𝑠𝑙𝑜𝑝𝑒 𝑤𝑖𝑡ℎ 20 𝑡𝑜 60 𝑚2 𝑇𝑅𝐼𝐵𝑈𝑇𝐴𝑅𝑌 𝐴𝑅𝐸𝐴 = 0.70 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (0.70 𝑘𝑃𝑎)(2.25𝑚) = 1.575
𝑚
❖ ROOF BEAM 3
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 2.25𝑚
33.3% 𝑡𝑜 100% 𝑠𝑙𝑜𝑝𝑒 𝑤𝑖𝑡ℎ 20 𝑡𝑜 60 𝑚2 𝑇𝑅𝐼𝐵𝑈𝑇𝐴𝑅𝑌 𝐴𝑅𝐸𝐴 = 0.70 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (0.70 𝑘𝑃𝑎)(2.25𝑚) = 1.575
𝑚
TRANSVERSE CRITICAL FRAME LIVE LOAD
GROUND FLOOR
❖ TIE-BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(3.75𝑚) = 7.125
𝑚
❖ TIE-BEAM 2
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(3.75𝑚) = 7.125
𝑚
❖ TIE-BEAM 3
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(3.75𝑚) = 7.125
𝑚
SECOND FLOOR
❖ FLOOR BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(3.75𝑚) = 7.125
𝑚
❖ FLOOR BEAM 2
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(3.75𝑚) = 7.125
𝑚
❖ FLOOR BEAM 3
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
𝐵𝐴𝑆𝐼𝐶 𝐹𝐿𝑂𝑂𝑅 𝐴𝑅𝐸𝐴 = 1.9 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (1.9𝑘𝑃𝑎)(3.75𝑚) = 7.125
𝑚
ROOF BEAM
❖ ROOF BEAM 1
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
33.3% 𝑡𝑜 100% 𝑠𝑙𝑜𝑝𝑒 𝑤𝑖𝑡ℎ 20 𝑡𝑜 60 𝑚2 𝑇𝑅𝐼𝐵𝑈𝑇𝐴𝑅𝑌 𝐴𝑅𝐸𝐴 = 0.70 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (0.70 𝑘𝑃𝑎)(3.75𝑚) = 2.625
𝑚
❖ ROOF BEAM 2
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
33.3% 𝑡𝑜 100% 𝑠𝑙𝑜𝑝𝑒 𝑤𝑖𝑡ℎ 20 𝑡𝑜 60 𝑚2 𝑇𝑅𝐼𝐵𝑈𝑇𝐴𝑅𝑌 𝐴𝑅𝐸𝐴 = 0.70 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (0.70 𝑘𝑃𝑎)(3.75𝑚) = 2.625
𝑚
❖ ROOF BEAM 3
𝑇𝑟𝑖𝑏𝑢𝑡𝑎𝑟𝑦 𝑤𝑖𝑑𝑡ℎ = 3.75𝑚
33.3% 𝑡𝑜 100% 𝑠𝑙𝑜𝑝𝑒 𝑤𝑖𝑡ℎ 20 𝑡𝑜 60 𝑚2 𝑇𝑅𝐼𝐵𝑈𝑇𝐴𝑅𝑌 𝐴𝑅𝐸𝐴 = 0.70 𝑘𝑃𝑎
𝑘𝑁
𝑊 = (0.70 𝑘𝑃𝑎)(3.75𝑚) = 2.625
𝑚
LONGITUDINAL CRITICAL FRAME SEISMIC LOAD
DESIGN BASE SHEAR
BASE SHEAR, V
𝐶𝑣 𝐼
𝑉= (𝑊)
𝑅𝑇
-----------------------------------
𝑇 =Ct (hn3/4 )
Total Height, hn
ℎ𝑛 = h1F + h2F
ℎ𝑛 = 3.75 𝑚 + 3.15 𝑚
ℎ𝑛 = 6.9 𝑚
Total Weight, W
𝑊 = W2F + WROOFING
𝑊 = 1142.0169 𝑘𝑁 + 168.4866 𝑘𝑁
𝑾 = 𝟏𝟑𝟏𝟎. 𝟓𝟎𝟑𝟓 𝒌𝑵
(0.672)(1.0)
𝑉= (1310.5035 𝑘𝑁)
(8.5)(0.3112𝑠)
𝑽 = 𝟑𝟑𝟐. 𝟗𝟐𝟔𝟗 𝒌𝑵
• MINIMUM BASE SHEAR, Vmin
𝑉𝑚𝑖𝑛 = 0.11𝐶𝑎𝐼𝑊
𝑉𝑚𝑖𝑛 = 0.11(0.4)(1.0)(1310.5035 kN)
𝑽𝒎𝒊𝒏 = 𝟓𝟕. 𝟔𝟔𝟐𝟐 𝒌𝑵 (GOVERNS!)
0.8 𝑁𝑣 𝐼 𝑧
𝑉𝑚𝑖𝑛 = (𝑊)
𝑅
0.8 (1.2)(1.0)(0.4)
𝑉𝑚𝑖𝑛 = (1310.5035 kN)
8.5
𝑉𝑚𝑖𝑛 = 59.2039 𝑘𝑁
THEREFORE, V = 154.1769 kN
VERTICAL DISTRIBUTION
BASE SHEAR, V
V = 154.1769 kN
(𝑉−𝐹𝑡)𝑊𝑖ℎ𝑖
Fx= Σ𝑊𝑖ℎ𝑖
➢ Second Floor
(154.1769 𝑘𝑁)(4282.5634 𝑘𝑁−𝑚)
F1= (5545.1209 𝑘𝑁−𝑚)
F1= 𝟏𝟏𝟗. 𝟎𝟕𝟐𝟕 𝒌𝑵
➢ Roof Level
(154.1769 𝑘𝑁)(1162.5575 𝑘𝑁−𝑚)
F2= (5545.1209 𝑘𝑁−𝑚)
F2 = 𝟑𝟐. 𝟑𝟐𝟑𝟖 𝒌𝑵
VERTICAL DISTRIBUTION
LEVEL Wi, kN hi, m Wihi, kN-m Fx, kN
1 1142.0169 3.75 4282.5634 119.0727
2 168.4866 6.9 1162.5575 32.3238
TOTAL 1310.5035 5545.1209 151.3965
Fx
Seismic Load =
No. of frame
On 2nd Floor:
119.0727
Seismic Load = = 29.7682 kN
4
On Roof Level:
32.3238
Seismic Load = = 8.0810 kN
4
TRANSVERSE CRITICAL FRAME SEISMIC LOAD
DESIGN BASE SHEAR
BASE SHEAR, V
𝐶𝑣 𝐼
𝑉= (𝑊)
𝑅𝑇
-----------------------------------
𝑇 =Ct (hn3/4 )
Total Height, hn
ℎ𝑛 = h1F + h2F
ℎ𝑛 = 3.75 𝑚 + 3.15 𝑚
ℎ𝑛 = 6.9 𝑚
Total Weight, W
𝑊 = W2F + WROOFING
𝑊 = 1142.0169 𝑘𝑁 + 168.4866 𝑘𝑁
𝑾 = 𝟏𝟑𝟏𝟎. 𝟓𝟎𝟑𝟓 𝒌𝑵
(0.672)(1.0)
𝑉= (1310.5035 𝑘𝑁)
(8.5)(0.3112𝑠)
𝑽 = 𝟑𝟑𝟐. 𝟗𝟐𝟔𝟗 𝒌𝑵
• MINIMUM BASE SHEAR, Vmin
𝑉𝑚𝑖𝑛 = 0.11𝐶𝑎𝐼𝑊
𝑉𝑚𝑖𝑛 = 0.11(0.4)(1.0)(1310.5035 kN)
𝑽𝒎𝒊𝒏 = 𝟓𝟕. 𝟔𝟔𝟐𝟐 𝒌𝑵 (GOVERNS!)
0.8 𝑁𝑣 𝐼 𝑧
𝑉𝑚𝑖𝑛 = (𝑊)
𝑅
0.8 (1.2)(1.0)(0.4)
𝑉𝑚𝑖𝑛 = (1310.5035 kN)
8.5
𝑉𝑚𝑖𝑛 = 59.2039 𝑘𝑁
THEREFORE, V = 154.1769 kN
VERTICAL DISTRIBUTION
BASE SHEAR, V
V = 154.1769 kN
(𝑉−𝐹𝑡)𝑊𝑖ℎ𝑖
Fx= Σ𝑊𝑖ℎ𝑖
➢ Second Floor
(154.1769 𝑘𝑁)(4282.5634 𝑘𝑁−𝑚)
F1= (5545.1209 𝑘𝑁−𝑚)
F1= 𝟏𝟏𝟗. 𝟎𝟕𝟐𝟕 𝒌𝑵
➢ Roof Level
(154.1769 𝑘𝑁)(1162.5575 𝑘𝑁−𝑚)
F2= (5545.1209 𝑘𝑁−𝑚)
F2 = 𝟑𝟐. 𝟑𝟐𝟑𝟖 𝒌𝑵
VERTICAL DISTRIBUTION
LEVEL Wi, kN hi, m Wihi, kN-m Fx, kN
1 1142.0169 3.75 4282.5634 119.0727
2 168.4866 6.9 1162.5575 32.3238
TOTAL 1310.5035 5545.1209 151.3965
Fx
Seismic Load =
No. of frame
On 2nd Floor:
119.0727
Seismic Load = = 29.7682 kN
4
On Roof Level:
32.3238
Seismic Load = = 8.0810 kN
4