Robotic Arm OG

You might also like

You are on page 1of 2

7.

1 Mounting base
The mounting base consists of:
Base Plate
Chemical anchors (resin-bonded anchors) with Dynamic Set
Fastening elements
Mounting requires a level and smooth surface on a concrete foundation with adequate load
bearing capacity. The concrete foundation must be able to accommodate the forces occurring
during operation. The dimensions must be observed like in the following illustration:

Figure 30: Mounting base

1. Concrete foundation
2. Chemical anchor (resin-bonded anchor) (16x)
3. Base Plate

Grade of concrete for foundations:


When producing foundations from concrete, observe the load-bearing capacity of the ground
and the country-specific construction regulations. There must be no layers of insulation or
screed between the Base Plates and the concrete foundation. The quality of the concrete must
meet the requirements of the following standard
C20/25 according to DIN EN 206-1:2001/DIN 1045-2:2008

77 / 171
Dimensioned drawing:
The following illustration provides all the necessary information on the mounting base, together
with the required foundation data.

Figure 31: Mounting base with centering, dimensioned drawing

To ensure that the anchor forces are safely transmitted to the foundation, observe the dimen-
sions for concrete foundations specified in the following illustration.

Figure 32: Cross-section of foundations

1. Base Plate
2. Chemical anchors (resin-bonded anchors) with Dynamic Set
3. Concrete foundation

78 / 171