1 1-Apr-2019 crush shifting carriage ghalader to surpul 900 2 1-Apr-2019 karaya to site 100 3 2-Apr-2019 160 bags cement banori 40000 4 2-Apr-2019 ihsan for expenses 500 5 2-Apr-2019 farhad for easyload 500 6 2-Apr-2019 steel shifting carriage to surpul 500 7 2-Apr-2019 steel keel purchased 150 8 2-Apr-2019 labor lunch + karaya + refreshment + load 1700 9 2-Apr-2019 IMC refreshment 100 10 3-Apr-2019 karaya to site 100 11 4-Apr-2019 diesel + mobile oil 200 12 4-Apr-2019 karaya to site + refreshemtn 240 13 6-Apr-2019 karaya to site 100 14 7-Apr-2019 binding tap, binding wire and samad bond purchased 1200 15 8-Apr-2019 waheed for petrol 50 16 8-Apr-2019 karaya to site + load 130 17 9-Apr-2019 cotton tap and salotion tap purchased + baqaya 800 18 10-Apr-2019 IMC refreshment 400 19 10-Apr-2019 bike fuel, lunch, karaya and load 440 20 11-Apr-2019 binding wire, mobile load 450 21 12-Apr-2019 refreshment 360 22 12-Apr-2019 daily visit 1500 23 12-Apr-2019 2 pieces tap 200 24 13-Apr-2019 daily visit 1500 25 13-Apr-2019 lunch 500 26 14-Apr-2019 field visit with ihsan in local and lunch 800 27 14-Apr-2019 cement carriage for 200 bags cement paid by bashir sb surpul 118000 28 15-Apr-2019 project stamp 500 29 15-Apr-2019 daily visit 1500 30 16-Apr-2019 daily visit 1500 31 16-Apr-2019 lunch 300 32 16-Apr-2019 abid received on behalf of rehman gul 150000 33 17-Apr-2019 daily visit Gha, wah, gha, shel, gha and srupul 2500 34 17-Apr-2019 labor refreshment 320 35 17-Apr-2019 labor payment 1200 36 17-Apr-2019 foam, garmala 90 37 17-Apr-2019 mixer machine carriage from surpul 600 38 17-Apr-2019 shahab 39 18-Apr-2019 ISB office visit 3000 40 18-Apr-2019 labor for putting concrete toilet block 1200 41 18-Apr-2019 shahab for expenses 42 18-Apr-2019 shahab for expenses 43 19-Apr-2019 grinder blade purchased 250 44 19-Apr-2019 communication 1250 45 19-Apr-2019 daily visit for beam repair with mason 1500 46 19-Apr-2019 labor food 600 47 19-Apr-2019 mason payment 1000 48 20-Apr-2019 visit by sajjad sb. And farhad for purchasing of trial pannel stuffs 2000 49 20-Apr-2019 3 piece Tar 480 50 21-Apr-2019 visit by farhad & ihsan with lunch 1700 51 21-Apr-2019 daily visit 1500 52 21-Apr-2019 IMC refreshment 450 53 22-Apr-2019 arshad stock 8500 54 23-Apr-2019 daily visit 1500 55 23-Apr-2019 lunch 200 S.No Date Description Amount 56 23-Apr-2019 kayara to site + load 400 57 23-Apr-2019 raziq loader wala 1000 58 23-Apr-2019 cotton tape purchased daily visit 400 59 24-Apr-2019 daily visit 1500 60 24-Apr-2019 steel keel purchased 100 61 24-Apr-2019 teeman for shitring 180 62 24-Apr-2019 cement 160 bags cement from banori with carriage 94200 63 24-Apr-2019 3 pieces tiles for sample 200 64 24-Apr-2019 bending wire and keels for waheedullah slab 1759 65 24-Apr-2019 hand level 150 66 26-Apr-2019 binding wire for waheedullah slab 300 67 26-Apr-2019 parda for chamtar 1600 68 26-Apr-2019 daily visit 1500 69 27-Apr-2019 daily visit 1500 70 27-Apr-2019 lunch 200 71 27-Apr-2019 stuffs for repair 160 72 27-Apr-2019 garmala for repair 180 73 28-Apr-2019 hose pipe purchased 1000 74 28-Apr-2019 dialy visit 1500 75 28-Apr-2019 lunch 200 76 28-Apr-2019 mixer machine repair 6500 77 28-Apr-2019 binding wire + 1 KG keel for waheedullah 480 78 28-Apr-2019 colors for trial panel 3800 79 28-Apr-2019 ceramic tiles for trial panel 2910 80 29-Apr-2019 visit ghalader, whaeed ullah and ISB 4000 81 29-Apr-2019 IMC refreshment on slab concrete 410 82 29-Apr-2019 fule for vibrator waheed ullah concrete 500 83 29-Apr-2019 Morble 12*12 45 pieces pliched 2700 84 29-Apr-2019 color for trial pannel purchased 1400 85 29-Apr-2019 cotton tape purchased waheed ullah banda 200 86 30-Apr-2019 3 person fare 250 87 30-Apr-2019 daily visit 1500 88 30-Apr-2019 lunch 200 89 1-May-2019 wire mesh carriage from shaheedan bazar 1620 90 1-May-2019 lunch for 3 persons etc 800 91 1-May-2019 ihsan for easyload 100 92 1-May-2019 shahab for easyload 150 93 1-May-2019 farhad for easyload 250 94 1-May-2019 hose pipe for ghalader + waheedullah 2050 95 1-May-2019 steel keel 2 paket 280 96 1-May-2019 daily visity 1500 97 1-May-2019 60 feet jaal for plaster for ghalader 3000 98 1-May-2019 skartons 4*12 16 pieces poliched 400 99 1-May-2019 chalk and pemana 120 100 1-May-2019 wireshel making at shaheedan for wiremesh plaster 200 101 2-May-2019 160 bags cement banori remaing payment 51200 102 2-May-2019 refreshment 150 103 2-May-2019 colors for trial panel 1640 104 2-May-2019 stuffs for trial panel 2150 105 2-May-2019 to shokat engineer as his last salary 70000 106 2-May-2019 steel nadeem steel 50000 107 2-May-2019 wall patti scraper 582 108 2-May-2019 3.4" PBC pipe for waheedullah slab + saw 350 109 2-May-2019 daily visit 1500 110 3-May-2019 mingora for project cheque 2000 111 3-May-2019 ihsan for visity ghalader 300 S.No Date Description Amount 112 4-May-2019 ihsan visit and purchased of steel keel, lunch 700 113 4-May-2019 farhad for easyload 100 114 4-May-2019 chasadda chowk to ghalader fare 80 115 4-May-2019 daily visit 1500 116 5-May-2019 perafit wall labor waheed ullah 2000 117 5-May-2019 raziq loader wala for carriage 1000 118 5-May-2019 steel keel purchased 160 119 5-May-2019 ihsan 1000 120 5-May-2019 3 labor payment 1500 121 5-May-2019 daily visit 1500 122 5-May-2019 labor lunch + tea 550 123 5-May-2019 site expenses + load 500 124 6-May-2019 Spacer 100 125 6-May-2019 daiy visit 1500 126 6-May-2019 cement banori old payment 2750 127 6-May-2019 brush+rola 370 128 7-May-2019 color stuff 620 129 7-May-2019 daily visit 1500 130 7-May-2019 white cement 100 131 7-May-2019 plaster of paris 260 132 7-May-2019 marble karigar for 2 days work 3000 133 7-May-2019 cement 15 bags cement ghalader 8200 134 7-May-2019 coton taps for waheedullah shitring 500 135 7-May-2019 6*6 sunny white polish ghalader 360 136 7-May-2019 plaster of paris, craper, wati 260 137 8-May-2019 daily visit 1500 138 8-May-2019 refreshment 200 139 9-May-2019 daily vsist 1500 140 10-May-2019 ISB 3000 141 11-May-2019 stell keel 1 packet 300 142 11-May-2019 stock 100 cft crush and 100 sand 5600 143 11-May-2019 daily visit 1500 144 12-May-2019 cement 8 bags cement for sur pul 4200 145 12-May-2019 steel keel 1 packet 150 146 12-May-2019 daily visit 1500 147 12-May-2019 wire mesh, keel GGPS musa, cham&Feroz 2480 148 12-May-2019 cement 8 bags cement for sur pul 4000 149 12-May-2019 wire mesh, sessor, keel etc. 2210 150 13-May-2019 Imaad carriage 700 151 13-May-2019 raziq loader wala mixer machine carriage 1000 152 13-May-2019 daily visit 1500 153 13-May-2019 waheed labor payment 1800 154 14-May-2019 pint brush 150 155 14-May-2019 2 mm spacer 100 156 14-May-2019 daily visit 1500 157 15-May-2019 swat trip for project Amount+Iftari 4000 158 15-May-2019 100 cft crush and 100 sand ghalader 5600 159 16-May-2019 daily visit 1500 160 16-May-2019 cement 15 bags cement and materia for roof repair Ghalader 15300 161 16-May-2019 Labor Roof repair Ghalader 8200 162 16-May-2019 Marble 500 RFT Marble purchased with carriage Ghalader 20500 163 16-May-2019 Viper purchased 190 164 16-May-2019 Cement 25 Bags cement for surpul Banori payment 14050 165 16-May-2019 cement 3 Bags cement Ghalader roof repair 1500 166 16-May-2019 1 Saw 200 167 16-May-2019 Marble 12 * 12 Marble 500 cft for ghalader 20000 S.No Date Description Amount 168 16-May-2019 Cement 15 Bags Cement Ghalader roof repair 8250 169 17-May-2019 daily visit 1500 170 18-May-2019 daily visit waheed, sur, musa 1500 171 19-May-2019 daily visit 1500 172 19-May-2019 communication 1250 173 20-May-2019 Marble Labor 500 174 20-May-2019 1 Brush, 11 yard plastic Ghalader 750 175 20-May-2019 daily visit 1500 176 20-May-2019 1 wheel barrow 4500 177 20-May-2019 wheel barrow ccarriage to ghalader 500 178 20-May-2019 jambolaan ghalader marble work 600 179 20-May-2019 2 days labor 1200 180 20-May-2019 shahab for spacers, travel expenses 500 181 20-May-2019 30 feet wire mesh with carriage waheed Ullah 1575 182 20-May-2019 Marble Carriage jaba Mayar 1000 183 21-May-2019 Raziq loader wala 700 184 21-May-2019 labor 1 day ghalader 700 185 21-May-2019 petrol 100 186 21-May-2019 labor lunch 400 187 21-May-2019 daily visit 1500 188 22-May-2019 cement 75 bags cement banori 15000 189 22-May-2019 daily visit 1500 190 22-May-2019 Marble Carriage Jaba Mayar 1000 191 23-May-2019 Marble Carriage Ghalader 700 192 23-May-2019 Blade 1", 1 Brush Waheed Ullah 290 193 23-May-2019 Shifting of marble and shitring 500 194 23-May-2019 daily visit waheed, sur, musa 1500 195 23-May-2019 Cement 380 Bags Cement for Butserri 92000 196 23-May-2019 Grinder Blade, Brush for bitumen Waheedullah 300 197 23-May-2019 Stock 200 CFT Sand 4800 198 24-May-2019 Daily visit 1500 199 24-May-2019 Payment to Mudasir Marble Karigar 10000 200 24-May-2019 marble carriage to but serri 2200 201 24-May-2019 ghalader electicity bill 2000 202 25-May-2019 11 yard palstic, keel 800 203 25-May-2019 daily visit 1500 204 25-May-2019 marble carriage to musajaan 1490 205 26-May-2019 emad trip to musajaan for bitumen 500 206 26-May-2019 waheed for cleaning rooms ghalader 1200 207 26-May-2019 cement 1 bag white cement ghalader 1100 208 26-May-2019 stock sand with carriage waheedullah 2600 209 26-May-2019 stock sand with carriage ghalader 2300 210 26-May-2019 15 feet wire mesh 525 211 26-May-2019 stock 100 and 100 cft sand for ghala, waheed 4900 212 26-May-2019 daily visit 1500 213 27-May-2019 marble carriage to but serri 2200 214 27-May-2019 barble carriage to but serri 1800 215 27-May-2019 jambolaan ghalader marble work 300 216 27-May-2019 arshad peshawar 5000 217 27-May-2019 marble carriage to butserri 2200 218 27-May-2019 daily visit 1500 219 28-May-2019 marble puchased for ghalader 4000 220 28-May-2019 marble skiritng for mayar and surpul 14400 221 28-May-2019 ihsan 100 222 28-May-2019 daily visit 1500 223 28-May-2019 bill attached 900 S.No Date Description Amount 224 29-May-2019 marble carriage to ghalader 700 225 29-May-2019 stock said alam stock wala 50000 226 29-May-2019 raziq loader wala 3000 227 29-May-2019 daily visit 1500 228 30-May-2019 shaukat for tests 14000 229 30-May-2019 stock 1 bag white cement for ghalader marble 1100 230 30-May-2019 daily visity 1500 231 31-May-2019 marble shifted from musajaan to butserri 2500 232 31-May-2019 marble 6*24 razaers ghalder 2000 233 31-May-2019 daily visit 1500 234 31-May-2019 marble 4*24 skirting jaba and but serri 14400 235 1-Jun-2019 repair of beams in waheed ullah 2000 236 1-Jun-2019 daily visit 1500 237 2-Jun-2019 waheed for two days work 1000 238 2-Jun-2019 waheed for surpul 200 239 2-Jun-2019 msking tap for stem wall shitring 150 240 2-Jun-2019 daily visit 1500 241 2-Jun-2019 4 pieces brushes 600 242 2-Jun-2019 1 Masken tap 150 243 3-Jun-2019 daily visity 1500 244 3-Jun-2019 stock ghalader stock wala 6280 245 4-Jun-2019 daily visit 1500 246 4-Jun-2019 stock sand purchased 2400 247 5-Jun-2019 loader carriage from cement 700 248 5-Jun-2019 shitring mama for ghalader toilet stem shitring 6000 249 5-Jun-2019 5 labor payment for ghalader tiolet stem wall concrete 4000 250 5-Jun-2019 Mixer Fuel 1000 251 5-Jun-2019 refreshment 400 252 5-Jun-2019 light system for stem wall ghalader toilet 970 253 5-Jun-2019 two visits same day 2500 254 6-Jun-2019 purchase of batten as shitring 2500 255 6-Jun-2019 stem wall 2nd labor Eid day 3000 256 6-Jun-2019 daily visit 1500 257 6-Jun-2019 refreshment 500 258 8-Jun-2019 daily visit chamtar, ghalader, chamtar 1500 259 8-Jun-2019 labor refreshment 200 260 8-Jun-2019 cement 2 bags cement 1040 261 8-Jun-2019 6 pipes inch, band and saket 499 262 8-Jun-2019 1 belcha, dasta & keel 290 263 8-Jun-2019 jamboolan for chamtar marble 332 264 9-Jun-2019 daily visit 1500 265 9-Jun-2019 waheed 1 day labor work 600 266 9-Jun-2019 Mirror purchased for chamtar window madam office 150 267 10-Jun-2019 Hamer, Chnai, Steel keel 400 268 10-Jun-2019 cement 3 bags cement chamtar, 3 KG white cement, Brush 1800 269 10-Jun-2019 Amim plaster wala 1000 270 10-Jun-2019 daily visit 1500 271 10-Jun-2019 mingora for project payment 3000 272 10-Jun-2019 1 hamer, 2 chanai, keel 400 273 10-Jun-2019 lunch + bike fuel 400 274 12-Jun-2019 1 packet steel keel 160 275 12-Jun-2019 marble chamatar marble 500 cft 20000 276 12-Jun-2019 carriage for 25 bags cement 900 277 12-Jun-2019 marble carriage for chamtar 800 278 12-Jun-2019 cement banori cement payment 37500 279 12-Jun-2019 stock payment to chamtar cement+stock wala 9040 S.No Date Description Amount 280 12-Jun-2019 steel keel + load + labor lunch + karaya 800 281 12-Jun-2019 daily visit 1500 282 12-Jun-2019 marble payment 24000 283 12-Jun-2019 payment to istikhar for 9 days work 13000 284 13-Jun-2019 musajaan labor payment 3000 285 13-Jun-2019 musajaan labor payment for 3 days 4000 286 13-Jun-2019 cement 1 bags white cement with carriage 1500 287 13-Jun-2019 steel keel + wireshel+Lunch + petrol IMC Refreshment 1600 288 13-Jun-2019 1 Packet steel keel 160 289 13-Jun-2019 daily visit 1500 290 14-Jun-2019 stock said alam stock wala payment 100000 291 14-Jun-2019 chamtar plaster karigar payment 6000 292 14-Jun-2019 payment to imran karigar for marble fixing 5000 293 14-Jun-2019 dialy bisity 1500 294 14-Jun-2019 ghalader shop keeper payment for brushes 500 295 14-Jun-2019 payament to shitringi mama 3000 296 14-Jun-2019 chamtar skirting carriage 500 297 14-Jun-2019 Feroz pur marble carriage 700 298 14-Jun-2019 blad for grinding purchases + load 1060 299 15-Jun-2019 payment to mudasir for ghalader marble fixing 10000 300 15-Jun-2019 grinder kariger payment 3000 301 15-Jun-2019 payment to chamtar watchman for curing roof slab 3000 302 15-Jun-2019 2 blulb, 2 holder… ghalder 430 303 15-Jun-2019 cotton tap purchased 200 304 15-Jun-2019 imaad carriage 200 305 15-Jun-2019 labor lunch + karaya 650 306 15-Jun-2019 daily visit 1500 307 15-Jun-2019 10 pieces PO Foam purchased (10,000/- payment made to ar 7500 308 16-Jun-2019 labor lunch + steel keel + rasal 630 309 16-Jun-2019 feroz labor for plaster preparation 500 310 16-Jun-2019 daily visit 1500 311 17-Jun-2019 karaya 180 312 17-Jun-2019 labor lunch 400 313 17-Jun-2019 refreshment 120 314 17-Jun-2019 ihsan for expenses 1000 315 17-Jun-2019 3 labor payment 1800 316 17-Jun-2019 payment for 3 lights for color work 430 317 17-Jun-2019 raziq loader wala for surpul 1000 318 17-Jun-2019 marble payment for marble to akhbar site 2400 319 17-Jun-2019 marble payment for 500 cft marble, skirting and razar butserri 23700 320 17-Jun-2019 daily visity 1500 321 18-Jun-2019 musjaan labor 3000 322 18-Jun-2019 musjaan labor for repair 500 323 18-Jun-2019 musajan shop + labor payment 4000 324 18-Jun-2019 payment for jaal , keel feroz, musjaan 910 325 18-Jun-2019 labor lucnh 420 326 18-Jun-2019 daily visit 1500 327 19-Jun-2019 cement 2 bags cement musjaan 1100 328 19-Jun-2019 feroz pur plaster karigar payment 8400 329 19-Jun-2019 toilet block backfilling feroz pur 1200 330 19-Jun-2019 to bahsir sb 150000 331 19-Jun-2019 communication 1250 332 19-Jun-2019 daily visity 1500 333 20-Jun-2019 labor lunch 300 334 20-Jun-2019 keel + bike fule 250 335 20-Jun-2019 karaya 300 S.No Date Description Amount 336 23-Jun-2019 altaf hussain 1 bag cement 550 337 23-Jun-2019 engineer + labor lunch + karaya 650 338 23-Jun-2019 daily visity 1500 339 24-Jun-2019 marble payment waheed feroz pur 21500 340 24-Jun-2019 daily visity 1500 341 24-Jun-2019 labor lunch + petrol 500 342 24-Jun-2019 marble waheed ullah marble 500 rft 21500 343 25-Jun-2019 Shahab for expenses 344 25-Jun-2019 electric wire 470 345 25-Jun-2019 bike petrol 300 346 25-Jun-2019 labor linch 400 347 25-Jun-2019 chamtar to shelkhmaltoon rikshaw fare 170 348 25-Jun-2019 Ihsan for expenses 1000 349 25-Jun-2019 3 yard plastic Feroz Pur 390 350 25-Jun-2019 Feroz Pur Bijli Bill 2500 351 25-Jun-2019 Raziq loader wala for Waheed Ullah 1000 352 25-Jun-2019 Steel Nadem Steel 12000 353 25-Jun-2019 Zafar Marble Polish wala 2000 354 25-Jun-2019 Emaad chinchi wala for carriage 1500 355 25-Jun-2019 Waheed Ghalader Dehari 1000 356 25-Jun-2019 labor payment 2500 357 25-Jun-2019 daily visit 1500 358 26-Jun-2019 bike petrol 300 359 26-Jun-2019 mobile load 250 360 26-Jun-2019 rikshaw karaya 200 361 26-Jun-2019 lunch 300 362 26-Jun-2019 medical treatment ihsan 50 363 26-Jun-2019 daily visit 1500 364 27-Jun-2019 marble purchased 21500 365 27-Jun-2019 ihsan for expenses 1000 366 27-Jun-2019 daily visit 1500 367 28-Jun-2019 petrol 300 368 28-Jun-2019 lunch 300 369 28-Jun-2019 bike wash 100 370 28-Jun-2019 daily visit 1500 371 29-Jun-2019 scaper+viper for feroz pur 200 372 29-Jun-2019 cement 1 bag white cement feroz pur 1150 373 29-Jun-2019 marble 1000 RFT Musajaan 44000 374 29-Jun-2019 Marble Imran Marble wala payment 16000 375 29-Jun-2019 Sanitory purchased for two bathrooms Fero. Chamt 10800 376 29-Jun-2019 Marble purchased + skirting and razer for surpul 23600 377 29-Jun-2019 daily visit 1500 378 29-Jun-2019 Ghori rent 500 379 30-Jun-2019 Marble Musajan marble 7140 380 30-Jun-2019 Marble Butserri Marble 3000 RFT + skirting 147280 381 30-Jun-2019 marble 1000 RFT But serri 46100 382 30-Jun-2019 daily visit 1500 383 1-Jul-2019 water pump repair at ghalader 2500 384 1-Jul-2019 daily visit 1500 385 2-Jul-2019 petrol 200 386 2-Jul-2019 Binding wire Chamtar 400 387 2-Jul-2019 Mobile Load + Lunch 400 388 2-Jul-2019 Shahab for Eexp. 389 2-Jul-2019 to ibrahim loader 3000 390 2-Jul-2019 sanitory stuffs 2650 391 2-Jul-2019 daily visit 1500 S.No Date Description Amount 392 3-Jul-2019 Stell To Nadeem Steel wala for musajan steel 300 kg 20000 393 3-Jul-2019 steel keel + sada keel 260 394 3-Jul-2019 Dor + Lunch + Ice etc 620 395 3-Jul-2019 Bike petrol 250 396 3-Jul-2019 plastic purchased 230 397 3-Jul-2019 daily visit 1500 398 4-Jul-2019 zaman PT 10000 399 4-Jul-2019 to imran mrble 10000 400 4-Jul-2019 daily visit 1500 401 4-Jul-2019 shahab for exp. 402 4-Jul-2019 PVC pipe 5" + 3" + Blade 480 403 4-Jul-2019 petrol 200 404 4-Jul-2019 lunch + ice + Mobile load 410 405 4-Jul-2019 Ihsan for exp. 500 406 5-Jul-2019 10 yard pipe level 150 407 5-Jul-2019 marble alnoor marble 423 RFT 26000 408 5-Jul-2019 daily visit 1500 409 6-Jul-2019 sanitory bill 3000 410 6-Jul-2019 ihsan for exp. 1500 411 6-Jul-2019 daily visit 1500 412 6-Jul-2019 stock ghalader stock wala for 100 cft crush waheed ullah, 100 11500 413 7-Jul-2019 petrol 200 414 7-Jul-2019 salotion + salotion tap 250 415 7-Jul-2019 lunch + Expenses 700 416 7-Jul-2019 ibrahim loader wala 100 417 8-Jul-2019 petrol 200 418 8-Jul-2019 salotion + salotion tap 160 419 8-Jul-2019 load + expenses 270 420 8-Jul-2019 raziq loader wala 2200 421 8-Jul-2019 Emaaad chinchi 1300 422 8-Jul-2019 shahab for exp. 423 8-Jul-2019 Marble Khalil marble trip to musajan 100 RFT 1700 424 8-Jul-2019 to zafar marble ragrai wala 10000 425 8-Jul-2019 daily visit 1500 426 9-Jul-2019 bike petrol 200 427 9-Jul-2019 PVC pipe + blade + nut bolt + petrol and diesel 600 428 9-Jul-2019 ibrahim loader wala 1800 429 9-Jul-2019 to shahab for exp. 430 9-Jul-2019 cement to banori cement wala 30000 431 9-Jul-2019 akbar ali eng. 20000 432 9-Jul-2019 zaman PT 10000 433 9-Jul-2019 IMC refreshment 320 434 9-Jul-2019 daily visit 1500 435 10-Jul-2019 DailyVisit 1500 436 10-Jul-2019 cement 50 bags sur pul & ghalader 25 each to Banbori cement v 32400 437 10-Jul-2019 to shahab for exp. 438 10-Jul-2019 bike petrol 300 439 10-Jul-2019 lunch 300 440 10-Jul-2019 PVC pipe + socket and hand level 560 441 10-Jul-2019 labor refreshment 270 442 10-Jul-2019 jamolaan 176 443 10-Jul-2019 steel keel 180 444 10-Jul-2019 1 selicon 250 445 11-Jul-2019 bike petrol 400 446 11-Jul-2019 IMC refreshment 300 447 11-Jul-2019 bike petrol 200 S.No Date Description Amount 448 11-Jul-2019 labor lunch 250 449 11-Jul-2019 IMC refreshment 400 450 11-Jul-2019 Zaman PT for Usman at waheed Ullah Banda 13000 451 11-Jul-2019 Zaman PT 15000 452 11-Jul-2019 Zaman PT 30000 453 11-Jul-2019 Arshad for Sarhad paints 20000 454 11-Jul-2019 Arshad for Butserri paints 25000 455 11-Jul-2019 ghalader sanitory work 1570 456 11-Jul-2019 daily visity 1500 457 12-Jul-2019 labor refreshment grad slab toilet ghalader 250 458 12-Jul-2019 IMC refreshment 330 459 12-Jul-2019 steel keel 50 460 12-Jul-2019 labor payment at ghalader (grad slab day) 2000 461 12-Jul-2019 IMC refreshment iqbal shah at chamtar 300 462 13-Jul-2019 to Ihsan for exp. 100 463 13-Jul-2019 daily visit 1500 464 14-Jul-2019 bike petrol 200 465 14-Jul-2019 pipe socket 30 466 14-Jul-2019 labor refreshment grad slab toilet ghalader 70 467 14-Jul-2019 shitring carriage to feroz pur 200 468 14-Jul-2019 To Zafar Marble Ragrai wala 6000 469 14-Jul-2019 labor lunch 200 470 14-Jul-2019 Marble purchased 26000 471 14-Jul-2019 Akbar Ali Eng. 20000 472 14-Jul-2019 daily visit 2000 473 15-Jul-2019 to emaad chinchi wala 1100 474 15-Jul-2019 shahab for exp. 475 15-Jul-2019 Bike petrol 150 476 15-Jul-2019 labor lunch 300 477 15-Jul-2019 daily visit 1500 478 17-Jul-2019 bike petrol 200 479 17-Jul-2019 mobile load 160 480 17-Jul-2019 Inaam printing press for 5 pads. 2900 481 17-Jul-2019 to ISB for Cheque collection 1860 482 18-Jul-2019 Steel keel purchased 180 483 18-Jul-2019 Bike Petrol 200 484 18-Jul-2019 Steel keel 200 485 18-Jul-2019 labor lunch 350 486 19-Jul-2019 bike petrol 200 487 19-Jul-2019 Diesel 150 488 19-Jul-2019 IMC Refreshment 150 489 19-Jul-2019 Communication 1250 490 20-Jul-2019 Cement to banori cement wala 20000 491 20-Jul-2019 steel to Nadeem steel wala 14-07-2019 Bill date 30000 492 20-Jul-2019 Zaman PT 5000 493 10-Aug-2019 Bashir sb for expenses in hotel beside namat kada 250000 494 10-Aug-2019 daily visity 1500 495 11-Aug-2019 shahab for Eid 20000 496 11-Aug-2019 ihsan for Eid 20000 497 11-Aug-2019 zaman pt through easypaisa 498 20-Aug-2019 Islamabad + peshawar visit 5000 499 21-Aug-2019 IMC refreshment 150 500 21-Aug-2019 daily visit 1500 501 21-Aug-2019 labor lunch 370 502 21-Aug-2019 loader carriage from cham to gh 700 503 22-Aug-2019 ISB visit for training 4000 S.No Date Description Amount 504 22-Aug-2019 bread fast 120 505 22-Aug-2019 akbar ali on way back on motorway 5000 506 22-Aug-2019 zaman for site work 10000 507 22-Aug-2019 refreshment 220 508 23-Aug-2019 mingora visit for money 2500 509 23-Aug-2019 to Bashir sb. / by naeem at jalala by sajjad sb. 300000 510 24-Aug-2019 ihsan for expense 1000 511 24-Aug-2019 daily visit 1500 512 25-Aug-2019 daily visit by sajjad sb. 1500 513 26-Aug-2019 Marble staircase and 12*12 for but 16380 514 26-Aug-2019 caement payment for 26 bags cement for feroz pur and musajan 14520 515 26-Aug-2019 daily visit 1500 516 27-Aug-2019 bike petrol 250 517 27-Aug-2019 lunch + IMC refreshment 470 518 27-Aug-2019 Jaro purchased ghalader 100 519 27-Aug-2019 shahab for expense 520 27-Aug-2019 lunch 250 521 27-Aug-2019 daily visit 1500 522 28-Aug-2019 shahab for expense 523 28-Aug-2019 cement for chamtar and musa 14720 524 28-Aug-2019 To Zaman for Usman and shitringi 22700 525 28-Aug-2019 Generator rent for musajan , chamtar bath slab 500 526 28-Aug-2019 petrol for generator 360 527 28-Aug-2019 IMC refreshment 300 528 28-Aug-2019 daily bisit 1500 529 29-Aug-2019 surpul- chamtar ghalader -Mjan chinchi 1700 530 29-Aug-2019 shahab Refreshment 531 29-Aug-2019 daily visit 160 532 29-Aug-2019 to zaman PT 1500 533 29-Aug-2019 To Usman for mixer rent in musajan and chamtar roof slab 26000 534 29-Aug-2019 to akbar ali in front of IRSP Office 4000 535 29-Aug-2019 generator repair 10000 536 29-Aug-2019 shahabar for expeses 500 537 30-Aug-2019 Ghalader electricity bill 4000 538 30-Aug-2019 diaily visit 1500 539 30-Aug-2019 Ihsan 1000 540 30-Aug-2019 Atif labor remaining for 10 days 1000 541 30-Aug-2019 bike petrol 542 30-Aug-2019 diesel for mixer machine 300 543 30-Aug-2019 refreshment 200 544 30-Aug-2019 to usman in haji kata for 3 bathrooms G, Sand S 370 545 31-Aug-2019 to ihsan for expenses 1000 546 31-Aug-2019 diaily visit 1500 547 31-Aug-2019 daily visit 1500 548 31-Aug-2019 bill attached 130 549 1-Sep-2019 to akbar ali through easypaisa 550 1-Sep-2019 cement/stock payament to ghalader stock for 5 bags cement and 5400 551 1-Sep-2019 daily visit chamtar, ghalader, chamtar 1500 552 1-Sep-2019 ihsan 1000 553 1-Sep-2019 stock 100 cft sand + 100 cft crush chamtar 7900 554 1-Sep-2019 cement banori cement 25 bags + remaining payment 37500 555 2-Sep-2019 shahab for expenses 556 2-Sep-2019 IMC refreshment 400 557 2-Sep-2019 bike petrol 300 558 2-Sep-2019 daily visit 1500 559 2-Sep-2019 soket 50 S.No Date Description Amount 560 2-Sep-2019 daily visit 1500 561 2-Sep-2019 arshad 50000 562 2-Sep-2019 imran PT 5000 563 3-Sep-2019 ISB visit 4000 564 3-Sep-2019 keel 2" 50 565 3-Sep-2019 bike petrol 250 566 3-Sep-2019 labor lunch 320 567 3-Sep-2019 service cable ghalader 700 568 3-Sep-2019 bulbs for ghalader 300 569 3-Sep-2019 marble stair steps for sur + but 20700 570 3-Sep-2019 zafar 3000 571 4-Sep-2019 steel keel 2" 25 pieces 50 572 4-Sep-2019 daily visit, ImC ghalader pakC, Ghala, Pak ch 2000 573 4-Sep-2019 lunch + bike fuel 250 574 4-Sep-2019 loader wlaa for carriage to feroz pur 1100 575 4-Sep-2019 daily visit 1500 576 4-Sep-2019 shahab 577 5-Sep-2019 IMC refreshment 350 578 5-Sep-2019 steel rings and 8 bars 4 sutar waheed ullah column 2260 579 5-Sep-2019 loader carriage from cement 600 580 5-Sep-2019 sanitory wala for checking water pump ghala 100 581 5-Sep-2019 ihsan 200 582 5-Sep-2019 waheed ullah chowkidar old payment 1000 583 5-Sep-2019 usman labor party in bathrooms work 4000 584 5-Sep-2019 daily visit 1500 585 5-Sep-2019 payment to akbar ali by sajjad sb. 586 5-Sep-2019 payment to zaman PT in but serri khata by sajjad sb. 587 5-Sep-2019 bike petrol 300 588 5-Sep-2019 steel keel 200 589 5-Sep-2019 diesel for mixer machine 250 590 5-Sep-2019 mobile load 200 591 5-Sep-2019 bike petrol 200 592 5-Sep-2019 QAQC Engineer refreshment 230 593 5-Sep-2019 Plas purchased 200 594 5-Sep-2019 Mobile load 200 595 5-Sep-2019 payment to bashir sb. At Toru CNG Mardan for Zaman PT 100000 596 5-Sep-2019 IMC 200 597 5-Sep-2019 daily visit 1500 598 5-Sep-2019 ISB visit for training 3000 599 5-Sep-2019 Stock sand for sur 100 600 5-Sep-2019 labor food ghalader 220 601 5-Sep-2019 ISB with bashir sb 3000 602 5-Sep-2019 Atif + labor for 7 days 13100 603 5-Sep-2019 Zaman PT till date 604 5-Sep-2019 Bashir Sb. Car petrol 500 605 6-Sep-2019 IMC Refreshment 350 606 6-Sep-2019 Mixer Diesel for Column concrete Surpul 250 607 6-Sep-2019 Usman for labor labor 11000 608 6-Sep-2019 daily visit 1500 609 6-Sep-2019 daily visit 1500 610 6-Sep-2019 bike petrol 200 611 6-Sep-2019 diesel for mixer machine 400 612 6-Sep-2019 IMC lunch 700 613 8-Sep-2019 Bill Attached 650 614 8-Sep-2019 Payment to Zafar marble wala by Sajjad sb. 615 8-Sep-2019 Payment to Akbar Ali for welding actiivty but S. by S S.No Date Description Amount 616 8-Sep-2019 Payment to Akbar Ali for Concrete Ring But S. By S 617 8-Sep-2019 Payment to Akbar Ali for shitring for ghalader roof by sajjad sb. 618 8-Sep-2019 bike petrol 300 619 8-Sep-2019 IMC refreshemnt 240 620 8-Sep-2019 Mobile load 150 621 8-Sep-2019 daily visit 1500 622 8-Sep-2019 PVC pipe 170 623 8-Sep-2019 bike petrol 400 624 8-Sep-2019 Atif + labor for 2 days 5000 625 8-Sep-2019 painting of retro steel patai 1430 626 8-Sep-2019 daily visit 1500 627 8-Sep-2019 communication 1250 628 8-Sep-2019 To bashir sb for payment in chamtar 25000 629 8-Sep-2019 To Bashir sb for payment in chamtar 15000 630 8-Sep-2019 To zaman for usman labor 5000 631 9-Sep-2019 water pump purchased for GGPS Ghalader (Used) 3500 632 9-Sep-2019 Stuffs purchased for Ghalader Water Pump 1775 633 9-Sep-2019 Stuffs purchased for Ghalader Water Pump 2000 634 9-Sep-2019 Stuffs purchased for Ghalader Water Pump 810 635 9-Sep-2019 Bike Petrol 300 636 9-Sep-2019 cutter palas purchased 180 637 9-Sep-2019 Bike petrol + bike chain change 450 638 9-Sep-2019 payment to rehman gul PT 639 9-Sep-2019 Zafar marble near amarat hotel 5000 640 9-Sep-2019 daily visit 1500 641 9-Sep-2019 Generator Petrol 200 642 9-Sep-2019 daily visit 1500 643 10-Sep-2019 wire mesh for feroz pur and musajan toilet block plaster 1310 644 10-Sep-2019 daily visit 500 645 11-Sep-2019 glous + cotton tap 150 646 11-Sep-2019 bike petrol 300 647 11-Sep-2019 labor lunch 200 648 11-Sep-2019 ihsan 1000 649 11-Sep-2019 daily visity 1200 650 12-Sep-2019 bike petrol 300 651 12-Sep-2019 labor lunch 200 652 12-Sep-2019 payment by sajjad sb. To usman labor party by sajjad sb. 653 12-Sep-2019 payment to akbar ali for electrification by sajjad sb. 654 12-Sep-2019 payment to usman for labor, rent, food and shitring 655 12-Sep-2019 daily visit 1500 656 13-Sep-2019 mobile load 150 657 15-Sep-2019 daily visit 1500 658 15-Sep-2019 lunch 250 659 15-Sep-2019 keel steel for feroz pur bathroom wire mesh 170 660 15-Sep-2019 payment to usman for labor , rent, food and shitring remaing of 1700 661 16-Sep-2019 daily visit 1500 662 16-Sep-2019 IMC refreshment 250 663 16-Sep-2019 shahab for exp. 664 16-Sep-2019 bike petrol 300 665 17-Sep-2019 hose pipe for musjaan 650 666 17-Sep-2019 Diesel for mixer machine surpul 400 667 17-Sep-2019 bike petrol 300 668 17-Sep-2019 Foam + Electic 130 669 17-Sep-2019 daily visit 1500 670 17-Sep-2019 IMC Refreshment 290 671 17-Sep-2019 Cement 3 bags cement for surpul toilet roof slab concrete 1530 S.No Date Description Amount 672 18-Sep-2019 steel wire and tap purchased 190 673 18-Sep-2019 meeting at namat kada refreshment 650 674 18-Sep-2019 payment to asghar shah railing wala for surpul railing by sajjad 675 18-Sep-2019 payment to zahid bijlai wala in feroz pur, musjan and chamtar 5000 676 18-Sep-2019 bike petrol 280 677 18-Sep-2019 diesel for mixer machine 300 678 18-Sep-2019 electric + joint box and elbow 250 679 18-Sep-2019 daily visit 1500 680 19-Sep-2019 purchased fast cable 4 bundles 7/29 for surpul 18000 681 19-Sep-2019 tile ceramic tiles purchases for feroz pur toilet + carriage (50 22930 682 19-Sep-2019 Biek Petrol 200 683 19-Sep-2019 Feroz Pur to musajaan cement carriage 230 684 19-Sep-2019 daily visit 1500 685 19-Sep-2019 online payment to sameer electric vendor for akbar ali's school 686 19-Sep-2019 labor food + refreshment 400 687 19-Sep-2019 shahab for exp. 688 19-Sep-2019 to usman for labor payment (& 7500 which he paid to shtring) 689 19-Sep-2019 labor payment for Ghalader marble skirting 2200 690 19-Sep-2019 communication 1250 691 20-Sep-2019 islamabad office visit for cheque collection 3000 692 20-Sep-2019 Refreshment 610 693 20-Sep-2019 Ihsan for Exp. 1000 694 21-Sep-2019 labor payment for feroz tile fixing 2 days 6000 695 21-Sep-2019 diaily visit 1500 696 21-Sep-2019 lunch 200 697 22-Sep-2019 To Akbar Ali through easypaisa from shahnoor pul 698 22-Sep-2019 Masking tap for Feroz pur 220 699 22-Sep-2019 Briks carriage from Feroz pur to Musajan (Toilet separation wa 300 700 22-Sep-2019 Ghori (Tato) from Feroz pur to Musajan for Electric work 200 701 22-Sep-2019 Emaad for Carriage of Steel from waheed ullah to but se 1 1100 702 22-Sep-2019 To saleem supervisor for exp. 2000 703 22-Sep-2019 daialy visity with ijaz 1500 704 22-Sep-2019 Manzoor shitrining for Ghala, waheed and surpul Toilet block shit. 705 22-Sep-2019 Refreshment 90 706 22-Sep-2019 Steel keel 1" and saw for wood (perapet wall) feroz pur 360 707 22-Sep-2019 soket, pipe and band for electric work at feroz pur 150 708 22-Sep-2019 wafer, 70 yard plastic (ghalader parda) and cable (simple tar) 500 709 22-Sep-2019 plastic purchased as parda 500 710 23-Sep-2019 Musa jann plaster labor for 2 days 3500 711 23-Sep-2019 Usman labor party remaining payment in 3 toilets ie Gh, Wah and S 12000 712 23-Sep-2019 To saleem supervisor for exp. 5000 713 23-Sep-2019 sessor for jambolan 160 714 23-Sep-2019 plastic for feroz pur parda 1000 715 23-Sep-2019 Jambolan for window feroz pur and ghalader 150 716 23-Sep-2019 3 sutar steel rods for musajan toilet block (small internal bear 600 717 23-Sep-2019 1 Tatkey and 1 Belcha for Feroz pur 750 718 23-Sep-2019 Ceramic Tiles purchased for Musajaan toilet + carriage 56400 719 23-Sep-2019 daily visit waheed, sur, musa 1500 720 23-Sep-2019 cement 11 bags cement and sand 10300 721 24-Sep-2019 1 chakwal and 1 pipe 250 722 24-Sep-2019 Tile fixer Dehari for feroz pur toilet block 3500 723 24-Sep-2019 shahab for expenses 724 24-Sep-2019 bike petrol 250 725 24-Sep-2019 labor lunch + IMC refreshment 700 726 24-Sep-2019 mobile load 150 727 24-Sep-2019 cermic tile purshased 19978 S.No Date Description Amount 728 24-Sep-2019 daily viist 1500 729 24-Sep-2019 lunch 300 730 25-Sep-2019 1 tap purchased 120 731 25-Sep-2019 shahab for expenses 732 25-Sep-2019 cotton tap purchased 200 733 25-Sep-2019 bike petrol 200 734 25-Sep-2019 rikshaw far musajaan to chamtar 200 735 25-Sep-2019 lunch 470 736 25-Sep-2019 marble extra marble purschased for butserri 3000 737 25-Sep-2019 3 bundle fast wire 3/29 for chamtar 6900 738 25-Sep-2019 daily visit waheed, sur, musa 1500 739 25-Sep-2019 refreshment 50 740 25-Sep-2019 wibrator repair 200 741 26-Sep-2019 1 Paket spacer 150 742 26-Sep-2019 Ghalader 3 sites labor payment 13500 743 26-Sep-2019 Musajaan 2 sites labor payment 11700 744 26-Sep-2019 Spacer purchased for ghalader toilet block tiles 150 745 26-Sep-2019 labor lunch 230 746 26-Sep-2019 daily visit 1500 747 28-Sep-2019 pipes for railing purchased 20750 748 28-Sep-2019 4*4 Plats for railing as base plats purchased 3000 749 28-Sep-2019 daily visit 1500 750 29-Sep-2019 to ihsan for expenses 1000 751 29-Sep-2019 photostate 100 752 29-Sep-2019 politeen sheet purchased 460 753 29-Sep-2019 1 labor dehari surpul 600 754 29-Sep-2019 labor food ghalader 100 755 29-Sep-2019 marble sunny white marble 19400 756 29-Sep-2019 1 Paket spacer 150 757 29-Sep-2019 Payment to Bitument wala for Butserri Bitumert work 50000 758 29-Sep-2019 daily visit 1500 759 30-Sep-2019 shahab for expenses 760 30-Sep-2019 zahid electrician for petrol bike 100 761 30-Sep-2019 plastic for chamtar and blade purchased 200 762 30-Sep-2019 steel keel 200 763 30-Sep-2019 bike petrol + lunch 550 764 30-Sep-2019 hussain sanitroy master pipes for downwater and elbows for G 23800 765 30-Sep-2019 daily visit 1500 766 30-Sep-2019 PGI Sheet carriage from peshawar to ghalader 2800 767 1-Oct-2019 shahab for expenses by sajjad sb. 768 1-Oct-2019 bike petrol 200 769 1-Oct-2019 loader carriage 100 770 1-Oct-2019 steel keel 170 771 1-Oct-2019 labor lunch 200 772 1-Oct-2019 refreshment 220 773 1-Oct-2019 2 labor payment by sajjad sb. At chamtar throguh shahab 1000 774 1-Oct-2019 To saleem supervisor for exp. 1000 775 1-Oct-2019 Ghalader tile labor 2000 776 1-Oct-2019 daily visit 1500 777 1-Oct-2019 car cluth system repair which failed during work 5000 778 1-Oct-2019 holes in 4*4 plates for railing 2880 779 1-Oct-2019 steel keel. Simple keel and binding wire 1090 780 1-Oct-2019 2 inch pipe for railing 1220 781 1-Oct-2019 Fuel for generator 200 782 1-Oct-2019 13 yard plastic 260 783 1-Oct-2019 1 trip dangpang fine crush for chamtar remaining retrofitting v 3000 S.No Date Description Amount 784 2-Oct-2019 shahab for expenses 1000 785 2-Oct-2019 inayat shitringi mama for shitring work at chamtar retrofitting 2000 786 2-Oct-2019 pipes for railing purchased 31350 787 2-Oct-2019 1 balti cold bitumen 900 788 2-Oct-2019 to emad chinchi wala for carriage surpul generator ghala. Bono 1700 789 2-Oct-2019 to emad as he gave to arshad in PGI sheet payemnt 790 3-Oct-2019 daily visit 1500 791 3-Oct-2019 labor lunch 350 792 3-Oct-2019 daily visit 1500 793 3-Oct-2019 remaining payment for chamtar labor 600 794 3-Oct-2019 1 cotton white tile 12 * 12 for ghalader toilet block 1700 795 3-Oct-2019 cement 7 Bags Cement for chamtar retrofitting work 3600 796 3-Oct-2019 Steel payment to Nadeem Stell 10000 797 3-Oct-2019 To Saleem supervisor for labor payment 25000 798 3-Oct-2019 To Saleem for expenses 5000 799 3-Oct-2019 To Saleem for expenses 2000 800 3-Oct-2019 To Saleem in his salary 2000 801 3-Oct-2019 Maqsood on behalf on Akbar Ali Eng. 3000 802 3-Oct-2019 Muhammad Ali for concrete rings 10000 803 3-Oct-2019 Dawa Khan Tile Fixer for Musajan toilet block work 7500 804 3-Oct-2019 Jalil labor for digging for Musajaan septic tank 2500 805 3-Oct-2019 jahan Bhadar for Feroz Pur color work 5000 806 3-Oct-2019 1 Cotton white Tile 1692 807 3-Oct-2019 Akbar Ali for labor payment 808 3-Oct-2019 2 labor for musajaan perapet wall shitring 1800 809 5-Oct-2019 4" * 4" inch plates 1509 810 5-Oct-2019 Cement white cement, 16 Bags cement, 40 bags bond Ghalada 10000 811 5-Oct-2019 Generator repaired at Ghalader 5000 812 5-Oct-2019 Bill Attaced 360 813 5-Oct-2019 4 Balti cold Bitumen Purchased 3600 814 5-Oct-2019 3 trip mud for ghalader lawn leveling 2300 815 5-Oct-2019 labor for mud leveling 500 816 5-Oct-2019 Generator repair work 5000 817 5-Oct-2019 daily visit 1500 818 5-Oct-2019 Ghalader Electricty bill paid for the month of september 3673 819 5-Oct-2019 1 SJL Cutter 7" 300 820 6-Oct-2019 Shahab for expenses 1000 821 6-Oct-2019 Bitumen purchased (Cold) 400 822 6-Oct-2019 daily visit 1500 823 6-Oct-2019 Nemat kada refreshemnt (Naeem, Arshad & Shehzad for Car) 824 6-Oct-2019 Saleem Supervisor for expences 1000 825 6-Oct-2019 Zahid Electrician as worked in surpul 2000 826 6-Oct-2019 XLI Car to Bashir Sb. 1100000 827 7-Oct-2019 To Shahab for expenses by Sajjad Sb. 828 7-Oct-2019 Bike oil change 340 829 7-Oct-2019 Akbar Ali for expenses 830 7-Oct-2019 Faisal Bitument wala for Bitumen work 40000 831 7-Oct-2019 Laiq color wala in Feroz Pur color work 10000 832 7-Oct-2019 Inayat for Shitring in Chamtar retrofitting R work 8000 833 7-Oct-2019 Daily visit 1500 834 7-Oct-2019 labor lunch 200 835 7-Oct-2019 retrofitting sturs purchaed GGPS Mayar 11800 836 7-Oct-2019 retrofitting sturs purchaed GGPS Mayar 2750 837 8-Oct-2019 scafolding carriage 4000 838 8-Oct-2019 batten for scafolding carriage 1100 839 8-Oct-2019 refreshment 300 S.No Date Description Amount 840 8-Oct-2019 dinner scafolding labor 300 841 8-Oct-2019 rental machine and shitring carriage to mayar 1000 842 8-Oct-2019 daily visit 2000 843 8-Oct-2019 3 Screw drivers 10500 844 8-Oct-2019 Shahab for Expenses 500 845 8-Oct-2019 Machines for retrofitting on rent 4400 846 8-Oct-2019 Shifting of Trial pannel stuff from home to Mayar 1500 847 8-Oct-2019 Scafolding joints carriage 250 848 9-Oct-2019 retrofitting labor lunch 3100 849 9-Oct-2019 labor refreshemnt 450 850 9-Oct-2019 daily visit 1500 851 9-Oct-2019 light holder, led lights and 30 yard tar 1000 852 9-Oct-2019 bill attached 3050 853 9-Oct-2019 1 cooler and 3 glasses 1050 854 9-Oct-2019 2 rassi 200 855 9-Oct-2019 20 litre diasel 2500 856 9-Oct-2019 mask purchased 200 857 9-Oct-2019 bill attached 160 858 9-Oct-2019 regmaal etc 260 859 9-Oct-2019 kashif for scafolding fixing at mayar 10000 860 10-Oct-2019 labor tea retrofitting 300 861 10-Oct-2019 labor lunch retrofitting 3550 862 10-Oct-2019 shakeel labor 3200 863 10-Oct-2019 daily visity 1500 864 10-Oct-2019 paint bill 720 865 10-Oct-2019 paint bill 350 866 10-Oct-2019 bill attached 6180 867 10-Oct-2019 dawa khan tile fixer for musajan toilet block work 7500 868 10-Oct-2019 Haji sb. PGI wala maqsood 15000 869 10-Oct-2019 welder nauman and hamza 2 days 5000 870 10-Oct-2019 akbar all for ikram electrician / plumber all sites electric work 10000 871 10-Oct-2019 rahat ullah generator operator + rent 9000 872 10-Oct-2019 zahid elelctrician + 1 labor 2 days work at mayar 5000 873 10-Oct-2019 habib ullah mayar retrofitting 2000 874 10-Oct-2019 imran + helper 2500 875 10-Oct-2019 sana ullah 3000 876 10-Oct-2019 usman 3500 877 10-Oct-2019 shoib 3000 878 10-Oct-2019 ali rehman 3000 879 10-Oct-2019 irfan 2000 880 10-Oct-2019 ijaz 1500 881 10-Oct-2019 ikram 1500 882 10-Oct-2019 shafiiullah 800 883 10-Oct-2019 adnan carpenter 1500 884 10-Oct-2019 shakeel plaster wala for ghal, waheed and surpul 7600 885 10-Oct-2019 imran mason for feroz, musa and chamtar 11300 886 12-Oct-2019 petrol for generator 2000 887 12-Oct-2019 shahab 1000 888 12-Oct-2019 carriage fonrental machine and shitring 750 889 12-Oct-2019 daily visit 1500 890 13-Oct-2019 labor refreshment 140 891 13-Oct-2019 daily visity 1500 892 13-Oct-2019 saleem for site expenses 3000 893 14-Oct-2019 payment to zaman for 3 days 7000 894 14-Oct-2019 payment to sanaullah labor and his brother in low 3000 895 14-Oct-2019 shahab for expenses 1000 S.No Date Description Amount 896 14-Oct-2019 tile purchases for waheed ullah and sur pul toilet blocks 40500 897 14-Oct-2019 retrofitting payment to zaman and sanaullah 10000 898 14-Oct-2019 1 bar for 4 sutar and 1 for 2 sutar steel purchased 180 899 14-Oct-2019 sardar for scafolding rent at mayar 23000 900 14-Oct-2019 bilal for digging septic tank at chamtar 2500 901 14-Oct-2019 daily visit 1500 902 15-Oct-2019 daily visit 1500 903 15-Oct-2019 steel grinder plate purchased 600 904 15-Oct-2019 shahab for expenses 905 15-Oct-2019 lunch + bike fuel 240 906 15-Oct-2019 labor payment at musajaan 1000 907 15-Oct-2019 bitumen work payment 27110 908 17-Oct-2019 shahab for expenses 1000 909 17-Oct-2019 carriage for pipes shiting to chamtar and musajaan 600 910 17-Oct-2019 one day labor payment at musajaan (Altaf) 600 911 17-Oct-2019 Hussain sanitroy bill payment siyyad 31460 912 17-Oct-2019 daily visit 1500 913 19-Oct-2019 kabley and rawal plug for railing purchased 2250 914 19-Oct-2019 cement 12 bags cement GGPS chamtar 6720 915 19-Oct-2019 dailyvisit 1500 916 19-Oct-2019 communication 1250 917 20-Oct-2019 shahab for expenses 1000 918 20-Oct-2019 malmal cloth for chamtar tile purchased 110 919 20-Oct-2019 cement 2bags cement, 6 bags bond etc 2650 920 20-Oct-2019 tile purchased 18900 921 20-Oct-2019 saleem for site expenses 1000 922 20-Oct-2019 saleem for labor payament 16600 923 20-Oct-2019 imran+ 1 labor for 3 schools 12000 924 20-Oct-2019 imad for carriage etc daily visit 2000 925 20-Oct-2019 daily visit 1500 926 21-Oct-2019 15 yard plastic purchased 600 927 21-Oct-2019 IMC refreshment 250 928 21-Oct-2019 daily visit 1500 929 22-Oct-2019 shahab for expenses 1000 930 22-Oct-2019 payment to shitring stuff for its misplace…. 4000 931 22-Oct-2019 payment to Akbar Ali 1000 932 22-Oct-2019 Payment to saleem 500 933 22-Oct-2019 90 Pieces tile border and 5 white grout 3960 934 22-Oct-2019 daily visit 1500 935 23-Oct-2019 2" pipe for electric cable under ground 200 936 23-Oct-2019 8 pieces boder and two grout ghalader side 632 937 23-Oct-2019 steel wireshal and rubber wireshal for PGI work 1200 938 23-Oct-2019 steel wireshal and rubber wireshal for PGI work 690 939 23-Oct-2019 7 plates and whole for railing 1720 940 23-Oct-2019 kabley and rawal plug for railing purchased 900 941 23-Oct-2019 daily visit 1500 942 24-Oct-2019 payment to bilal loader wala for 1 trip 1000 943 24-Oct-2019 Screws and fuel for generator for PGI at waheed ullah 180 944 24-Oct-2019 tile purchased 1365 945 24-Oct-2019 2 drum bitumen cold 2400 946 24-Oct-2019 saleem for site expenses 4000 947 24-Oct-2019 saleem for labor payment 16000 948 24-Oct-2019 maqsood PGI karigar for waheed ullah 3000 949 24-Oct-2019 javed labor for leech pit digging and 2 days labor work 4300 950 24-Oct-2019 imran + 1 labor for three school work 1000 951 24-Oct-2019 daily visit 1500 S.No Date Description Amount 952 25-Oct-2019 ISB visit 3000 953 25-Oct-2019 shahab for expenses 500 954 26-Oct-2019 bill attached 900 955 26-Oct-2019 payment to ghalder color wala as kharcha 2000 956 26-Oct-2019 payment to steel fixer for fuel from ghalder to musajaan 200 957 26-Oct-2019 daily visit 1500 958 26-Oct-2019 labor lunch 300 959 26-Oct-2019 labor payment 21/10/19 to 26/10 ghalder side 7600 960 27-Oct-2019 daily visit 1500 961 27-Oct-2019 hussain sanitory bill 3870 962 28-Oct-2019 daily visit 1500 963 28-Oct-2019 shahab for expenses 2000 964 29-Oct-2019 2 inch pipe for railing 3300 965 29-Oct-2019 1 blad purchased 300 966 29-Oct-2019 mingora trip for cash 3000 967 29-Oct-2019 saleem for site expenses 5000 968 30-Oct-2019 daily visity 1500 969 30-Oct-2019 saleem received in his salary 3200 970 30-Oct-2019 daily visit 1500 971 30-Oct-2019 ghalder electricity bill paid for the month of october 800 972 30-Oct-2019 cement 9 bags cement & 5 bags tile bond GGPS chamtar 5870 973 30-Oct-2019 stock meterial ie sand, crush for chamtar septic tank and toilet p 3800 974 30-Oct-2019 steel nadeem payment in steel out of 24410/- 15900 975 30-Oct-2019 mr. Faisal bitumin wala (total 1,28,000) 30000 976 31-Oct-2019 Mr. Hazrat Hussain has received for tile fixing at chamtar and sur 13400 977 31-Oct-2019 Hussain sanitory bill pipes for leach pit and elbow 3800 978 31-Oct-2019 tile boarder for musajan toilet block 670 979 31-Oct-2019 Hussain 6 tankies (Master Fit) and salotion for musajan, and 2 c 48900 980 31-Oct-2019 Marble 12*12, 6*24 and 4*24 for waheed, sur, cham and feroz 26700 981 31-Oct-2019 saleem payment for labor till date (one week) 26800 982 31-Oct-2019 zahid electrican by the hand of saleem for 2 days work at musajaan 2500 983 31-Oct-2019 maqsood PGI karigar 2000 984 31-Oct-2019 loader carriage from cham to musajan 300 985 31-Oct-2019 ghalader stock wala 1500 986 31-Oct-2019 to javed for electricity stuffs 445620 987 31-Oct-2019 daily visit 1500 988 31-Oct-2019 refreshment 150 989 1-Nov-2019 Musajaan leach pit exevation (Rs: 4000) 2600 990 1-Nov-2019 Mr. Laiq received payment by hand of Ijaz eng. At feroz pur 15000 991 1-Nov-2019 daily visit 1200 992 1-Nov-2019 maqsood PGI karigar 7000 993 1-Nov-2019 10 yard cable 3-29, rawal plug and scres for feroz pur electric w 300 994 1-Nov-2019 labor food at musajan 250 995 1-Nov-2019 mr. imran + labor work for 8 days 1700 996 2-Nov-2019 Tile bond purchased 300 997 2-Nov-2019 Tile Bond carriage 200 998 2-Nov-2019 To aAltaf in Musajaan Electricity Bill 500 999 2-Nov-2019 Hussain Sanitory Bill payment Siyyad 13300 1000 2-Nov-2019 dialy visit 1200 1001 3-Nov-2019 daily visit 1500 1002 3-Nov-2019 labor lunch 200 1003 3-Nov-2019 1 & half inch 3 pipes for railing 4050 1004 3-Nov-2019 7 wash basin, 6 English Kamod etc 52550 1005 4-Nov-2019 Emaad chinchi wala for his trips 5000 1006 4-Nov-2019 Rawal plug purchased 70 1007 4-Nov-2019 labor lunch 250 S.No Date Description Amount 1008 4-Nov-2019 daily visit 1500 1009 4-Nov-2019 Hussain Sanitory Bill payment Siyyad 6940 1010 5-Nov-2019 Haji Sb. PGI wala Maqsood 5000 1011 5-Nov-2019 Zahid Electrician as worked in surpul 1500 1012 5-Nov-2019 Arshad For PGI 1013 5-Nov-2019 daily visit 1500 1014 5-Nov-2019 Shahab for expenses 1500 1015 5-Nov-2019 PGI Carriage to Musajaan 300 1016 5-Nov-2019 Labor for grinder work at Musajaan, Feroz pur & Chamtar 3000 1017 5-Nov-2019 Hussain Sanitory Bill payment Siyyad 1250 1018 5-Nov-2019 Oclums purchased 4305 1019 5-Nov-2019 Bitument and Screws etc 5510 1020 5-Nov-2019 Plugs and rubbers for PGI fixing 300 1021 5-Nov-2019 Saleem for labor payment 15000 1022 5-Nov-2019 Faisal Bitument wala for Bitumen work 25000 1023 5-Nov-2019 Imran+1 labor for 3 schools 15000 1024 6-Nov-2019 6 feet long and 2 feet wide 3 pipes 5500 1025 6-Nov-2019 1 piece wash basin 1 English kamod and 1 seat cover 6850 1026 6-Nov-2019 daily visit 1500 1027 9-Nov-2019 saleem for expenses 2500 1028 9-Nov-2019 daily visit 1500 1029 9-Nov-2019 sanitroy stuffs 350 1030 9-Nov-2019 Iftikhar sanitory wala for feroz pur toilet block work 5350 1031 9-Nov-2019 Hussain Sanitory Bill payment Siyyad 11280 1032 10-Nov-2019 Shahab for expenses 1000 1033 10-Nov-2019 daily visit 1500 1034 10-Nov-2019 Imran + 1 labor for 3 schools 13000 1035 11-Nov-2019 carriage for rings from said alam stock wala 600 1036 11-Nov-2019 To Emaad chinchi wala 3000 1037 11-Nov-2019 daily visit 1500 1038 11-Nov-2019 wash basin jali, elbows, union etc 896 1039 12-Nov-2019 fan danda purchased s 100 1040 12-Nov-2019 saleem for labor payment 10000 1041 12-Nov-2019 daily visit 1500 1042 13-Nov-2019 carriage of rings from chamtar to feroz pur 300 1043 13-Nov-2019 2 trip carriage of gravel to musajaan 1600 1044 13-Nov-2019 labor food 300 1045 13-Nov-2019 gererator fuel 100 1046 13-Nov-2019 shahab for expenses 1000 1047 13-Nov-2019 pipe, band, sakit and steel wire 310 1048 13-Nov-2019 pipes, wireshel etc 3210 1049 13-Nov-2019 daily visit 1500 1050 14-Nov-2019 shahab for expenses 500 1051 14-Nov-2019 daily visit 1500 1052 18-Nov-2019 2 sutar lasani for septec tank concrete edges 600 1053 18-Nov-2019 hussain sanitory bill payment siyyad 10000 1054 18-Nov-2019 daily visit 1500 1055 19-Nov-2019 shahab for expenses 700 1056 19-Nov-2019 labor for fuel 200 1057 19-Nov-2019 chabi 140 1058 19-Nov-2019 daily visit 1500 1059 19-Nov-2019 communication 1250 1060 20-Nov-2019 saleem 2000 1061 20-Nov-2019 daud electrician 1000 1062 20-Nov-2019 3/4 pipe etc. 330 1063 20-Nov-2019 daily visit 1500 S.No Date Description Amount 1064 21-Nov-2019 shahab for expenses 1000 1065 21-Nov-2019 daily visit 1500 1066 23-Nov-2019 faisal bitument wala for bitumen work last payment 1067 23-Nov-2019 daily visit 1500 1068 24-Nov-2019 saleem for expenses 2000 1069 24-Nov-2019 labor food daily visit 400 1070 24-Nov-2019 daily visit 1500 1071 25-Nov-2019 gravel carriage for feroz pur and chamatar from chamtar stock 1700 1072 25-Nov-2019 Altaf shopkeeper khata 560 1073 25-Nov-2019 Bit Etc. 1030 1074 25-Nov-2019 daily visit 1500 1075 26-Nov-2019 Gul Bhahadur sanitory wala 2000 1076 26-Nov-2019 daily visit 1500 1077 26-Nov-2019 daud electrician 1000 1078 27-Nov-2019 Hussain sanitroy bill payment Siyyad 15000 1079 27-Nov-2019 Shahab for expenses 1000 1080 27-Nov-2019 Bilal labor for 5 days 3000 1081 27-Nov-2019 2 days labor work on roof gravel musajaan 1200 1082 27-Nov-2019 daud electrican 3000 1083 27-Nov-2019 1 Balti cold bitumen 1000 1084 27-Nov-2019 11" kabley and bolt for chamtar Rem. Regrofitting work 6740 1085 27-Nov-2019 1 Chatkey 150 1086 27-Nov-2019 Bill Attached 220 1087 27-Nov-2019 Daily visit 1500 1088 28-Nov-2019 8 pieces matwhite tiles 800 1089 28-Nov-2019 daily visit 2000 1090 28-Nov-2019 labor lunch 300 1091 28-Nov-2019 labor work 500 1092 28-Nov-2019 paint bill 1170 1093 2-Dec-2019 peech kas wireshel purchased 500 1094 2-Dec-2019 daily visit 1500 1095 2-Dec-2019 ghalader labor payment 4200 1096 2-Dec-2019 40 yard cable 3/29 and 150 screws 770 1097 2-Dec-2019 bill attched 340 1098 4-Dec-2019 drill machine rent 2000 1099 4-Dec-2019 daud electrician 1000 1100 4-Dec-2019 3/8 warshal 140 1101 4-Dec-2019 grinder rent advance shitring saif ul islam 4600 1102 4-Dec-2019 Door stopper 1590 1103 4-Dec-2019 bill attached imran + 1 labor for 3 schools 13 days 1200 1104 4-Dec-2019 imran + 1 labor for 3 schools 13 days 24000 1105 5-Dec-2019 Arshad in Musajaan by imran mason 1106 5-Dec-2019 javed labor for feroz pur work 1000 1107 5-Dec-2019 ajmal lohar payment for railing making with redoxide 27800 1108 5-Dec-2019 ImC refreshment 100 1109 5-Dec-2019 astar and petrol for color 2830 1110 5-Dec-2019 bill attached 580 1111 5-Dec-2019 daily visit 1500 1112 6-Dec-2019 daud electrian 2000 1113 6-Dec-2019 labor food 300 1114 6-Dec-2019 tractor work at musajaan for soil smoothness 500 1115 6-Dec-2019 refreshment 90 1116 6-Dec-2019 daily visit 1500 1117 6-Dec-2019 gul bhahadur sanitory wala 1500 1118 7-Dec-2019 ibrahim labor and his brother worked at musajaan 3000 1119 7-Dec-2019 yasir PGI wala for making PGI 5000 S.No Date Description Amount 1120 7-Dec-2019 PGI transporation 1500 1121 7-Dec-2019 5 labor food 400 1122 7-Dec-2019 daily visit 1500 1123 8-Dec-2019 shahab for expenses by sajjad sb 1124 8-Dec-2019 shahab for expenses by Farhad 500 1125 8-Dec-2019 To Saleem as in his salary by easypaisa by arif 8000 1126 8-Dec-2019 ibrahim labor and his brother worked at musajaan 1600 1127 8-Dec-2019 labor food 110 1128 8-Dec-2019 pipe, socket, band, pipe 740 1129 8-Dec-2019 kabley, garmala, rawal plug etc 250 1130 8-Dec-2019 daily visity 1500 1131 9-Dec-2019 shahab for expenses 200 1132 9-Dec-2019 labor food 300 1133 9-Dec-2019 daud electrian 2000 1134 9-Dec-2019 imran mason 500 1135 9-Dec-2019 10 yard 7/29 wire 300 1136 9-Dec-2019 daily visit 1500 1137 11-Dec-2019 ISB visity for cheque 3000 1138 12-Dec-2019 imran + 1 labor 8 days 14400 1139 12-Dec-2019 Gravel of chamtar to roof 1000 1140 12-Dec-2019 labor payment gul 2500 1141 12-Dec-2019 daud electrian 2000 1142 12-Dec-2019 daily visit 1500 1143 12-Dec-2019 labor lunch 250 1144 12-Dec-2019 color purchased 700 1145 13-Dec-2019 emaad chinchi wala for his trips 5000 1146 13-Dec-2019 daily visit 1500 1147 14-Dec-2019 daily visit 1500 1148 14-Dec-2019 lunch 250 1149 14-Dec-2019 screw and repat for PGI work 850 1150 14-Dec-2019 3 pairs toilet block hand Grips, 29 rawal Bolts 8725 1151 14-Dec-2019 steel patal purchased for GGPS chamtar ra. Retrofitting work 11300 1152 15-Dec-2019 Gori rent feroz pur 3300 1153 15-Dec-2019 To Saleem as in his salary by easypaisa 10000 1154 15-Dec-2019 shahab for expenses 1000 1155 15-Dec-2019 daily visit 1500 1156 15-Dec-2019 bill attached 80 1157 16-Dec-2019 imran marble wala last payment through sanaullah labor 3200 1158 16-Dec-2019 labor lunch 200 1159 16-Dec-2019 laiq color wala for feroz pur 5000 1160 16-Dec-2019 daily visit 1500 1161 16-Dec-2019 3 piece Matwhite tiles 300 1162 16-Dec-2019 maqsood PGI karigar 10000 1163 17-Dec-2019 brush for silicon purchased 100 1164 17-Dec-2019 bit purchased for drill machine 50 1165 17-Dec-2019 silicon purchased 120 1166 17-Dec-2019 daily visit 1500 1167 17-Dec-2019 drillmachine extension rent 3400 1168 17-Dec-2019 drill armecher repaired 800 1169 17-Dec-2019 selicon Gun and selicon 450 1170 17-Dec-2019 open SMD selling light purchased 450 1171 18-Dec-2019 khan babu 1172 18-Dec-2019 emaad chinchi walal for his trips 10000 1173 18-Dec-2019 maqsood PGI karigar 1174 18-Dec-2019 daily visit 1500 1175 18-Dec-2019 labor lunch 300 S.No Date Description Amount 1176 18-Dec-2019 iftikhar sanitory walafor 4 bal wall 2500 1177 19-Dec-2019 50 rawal bolt, 54 rawal bolt 1547 1178 19-Dec-2019 bill attached 1350 1179 19-Dec-2019 communication 1250 1180 20-Dec-2019 bill attached 2500 1181 20-Dec-2019 1 gallon paint + brush 500 1182 21-Dec-2019 daily visit 1500 1183 21-Dec-2019 shahab for expenses 500 1184 21-Dec-2019 saleem for expenses 3000 1185 21-Dec-2019 maqsood pPGI karigar 5000 1186 21-Dec-2019 Frame for bathroom 1100 1187 21-Dec-2019 steel patai purchased for GGPS chamtar rem. Regrofitting work 1900 1188 21-Dec-2019 13 clips 25 MM and 6 clips 32MM purchased 240 1189 21-Dec-2019 binding wire and jaal 290 1190 22-Dec-2019 color karigar feroz pur 1000 1191 22-Dec-2019 labor fuel 200 1192 22-Dec-2019 labor lunch 280 1193 22-Dec-2019 Daily visit 1500 1194 22-Dec-2019 petrol for windows cleaning 100 1195 22-Dec-2019 cement 5 bags cement for chamtar 2500 1196 22-Dec-2019 1 Piece Plaster of paris, 1 KG white cement, regmal etc 222 1197 23-Dec-2019 generator fuel 300 1198 23-Dec-2019 labor lunch 300 1199 23-Dec-2019 generator carriage from chamtar to feroz pur 200 1200 23-Dec-2019 sanitory work at feroz pur 1000 1201 23-Dec-2019 daud electrician 5000 1202 23-Dec-2019 gul said labor weekly payment 6000 1203 23-Dec-2019 imran mason till 19/12/19 11000 1204 23-Dec-2019 Daily visit 1500 1205 24-Dec-2019 shoaib tile karigar 500 1206 24-Dec-2019 Musajaan beam setting labor 1000 1207 24-Dec-2019 generator fuel 200 1208 24-Dec-2019 2 Hilti rent for Musajaan and chamtar 800 1209 24-Dec-2019 Bill Attaced 470 1210 24-Dec-2019 Daily visit 1500 1211 25-Dec-2019 ibrahim labor 1500 1212 25-Dec-2019 Gori rent musajaan 1200 1213 25-Dec-2019 sanitory wala 400 1214 25-Dec-2019 Grout, Socket 4 inch and clean out 4 inch Chamtar 510 1215 25-Dec-2019 Binding wire Chamtar 420 1216 25-Dec-2019 6 Pieces of Bathroom Ceiling light for 6 Schools 2580 1217 25-Dec-2019 16 P Kalbley 320 1218 25-Dec-2019 7 Pieces Socket 1050 1219 25-Dec-2019 Daily visit 1500 1220 25-Dec-2019 Generator Petrol 200 1221 25-Dec-2019 Rawal plug etc 220 1222 26-Dec-2019 Shahab for expenses 500 1223 26-Dec-2019 to Aluminium worker as fare 100 1224 26-Dec-2019 labor lunch 200 1225 26-Dec-2019 Gori carriage 200 1226 26-Dec-2019 Daily visit 1500 1227 26-Dec-2019 16 pieces rawal bolt 580 1228 26-Dec-2019 9" steel patai 252 1229 26-Dec-2019 Steel 4 sutar 4KG 550 1230 26-Dec-2019 Steel Handels 6000 1231 26-Dec-2019 Bill Attaced 1930 S.No Date Description Amount 1232 26-Dec-2019 30 yard 7/36 cable 1650 1233 26-Dec-2019 Bill Attaced 960 1234 26-Dec-2019 2 steel patai 350 1235 27-Dec-2019 Daily visit 1500 1236 28-Dec-2019 Daily visit 1500 1237 28-Dec-2019 Jambolaan 112 1238 28-Dec-2019 4 pieces of floor tiles 400 1239 28-Dec-2019 48 feet wood lar ,32 feet lar ,1 gilu and carriage. Retrofitting re 12,296 1240 28-Dec-2019 20 & 20 pieces rawal bold purchasedchamter 800 1241 28-Dec-2019 7 stooper purchased for door 1,080 1242 28-Dec-2019 advance shitring Saif Ul Islam for chamtar retrofitting work 13000 1243 28-Dec-2019 Bill Attaced 4,300 1244 28-Dec-2019 Bill Attaced 475 1245 28-Dec-2019 150 yard 3/29 cable 2,500 1246 28-Dec-2019 Drill bit 60 1247 28-Dec-2019 Bill Attaced 400 1248 28-Dec-2019 labor payment 2000 1249 28-Dec-2019 labor ibrahim for one day 550 1250 28-Dec-2019 Shoib tile karigar 2000 1251 28-Dec-2019 Mason one day 1000 1252 28-Dec-2019 Shahab for expenses 600 1253 28-Dec-2019 lunch 250 1254 29-Dec-2019 Daily visit 1500 1255 29-Dec-2019 Shahab for expenses 400 1256 29-Dec-2019 Labor food 150 1257 29-Dec-2019 Najeeb carpenter for making frames 500 1258 29-Dec-2019 screws and steel wire 120 1259 29-Dec-2019 2 LT Rent siaf Ul Islam 800 1260 30-Dec-2019 Daily visit 1500 1261 30-Dec-2019 Gul Bahahadur Sanitory wala 1,000 1262 30-Dec-2019 Gas cylender filling LPG 170 1263 30-Dec-2019 labor food 150 1264 30-Dec-2019 keel for retrofitting wood fixing 160 1265 30-Dec-2019 Bill Attaced 1,100 1266 30-Dec-2019 Bill Attaced 320 1267 31-Dec-2019 Daily visit 1,500 1268 31-Dec-2019 Labor food 150 1269 1-Jan-2020 Daily visit 1,500 1270 1-Jan-2020 Bill Attaced 150 1271 2-Jan-2020 Daily visit 1,500 1272 2-Jan-2020 Sahibzada color wala 1273 3-Jan-2020 iftikhar sanitory wala for chamtar and sanitory bill 9930 1274 3-Jan-2020 labor for chamtar room washing cleaning and outside 1,000 1275 3-Jan-2020 Daily visit 2000 1276 3-Jan-2020 labor lunch 300 1277 4-Jan-2020 Daily visit 2000 1278 4-Jan-2020 zia electrician till date 8,000 1279 6-Jan-2020 imran mason 6000 1280 6-Jan-2020 Daily visit 2,000 1281 11-Jan-2020 Najeeb carpenter feroz pur retrifitting work 2000 1282 11-Jan-2020 shoaib tile karigar 250 1283 11-Jan-2020 Daily visit 2000 1284 11-Jan-2020 3 Pieces Clums and 2 pieces kawal 70 1285 15-Jan-2020 Daily visit 2000 1286 15-Jan-2020 IMC Refreshment 300 1287 16-Jan-2020 Daily visit 2000 S.No Date Description Amount 1288 16-Jan-2020 labor lunch 300 1289 16-Jan-2020 Saleem for site expenses 4000 1290 17-Jan-2020 sameer for Electric stuffs on behalf of Akbar Ali 1291 17-Jan-2020 Taimur color wala by sahibzada 1292 17-Jan-2020 Akbar Ali Eng. 1293 17-Jan-2020 lunch 280 1294 17-Jan-2020 Daily visit 2000 1295 17-Jan-2020 Shahab for expenses 500 1296 18-Jan-2020 Major sb. Chamtar stock wala 2150 1297 18-Jan-2020 Shahab for expenses 100 1298 18-Jan-2020 Gul Mason 1400 1299 18-Jan-2020 Muhammad Ali Concrete Rings wala 1300 18-Jan-2020 Ghalader stock wala 30000 1301 18-Jan-2020 Hussain Sanitory wala Siyyad 50000 1302 18-Jan-2020 Emaad Chinchi wala for his trips 5000 1303 18-Jan-2020 Mushtaq Haji through Sajjad sb. 1304 18-Jan-2020 Daily visit 2000 1305 19-Jan-2020 Photostate 150 1306 19-Jan-2020 Laiq color wala for feroz pur 10000 1307 19-Jan-2020 Daily visit 2000 1308 19-Jan-2020 lohar for stoper setting 150 1309 19-Jan-2020 LPG gass filling 170 1310 19-Jan-2020 Communication 1250 1311 20-Jan-2020 Sand & Cement musajaan 900 1312 20-Jan-2020 Master pipes Head 500 1313 20-Jan-2020 Shahab for expenses 250 1314 20-Jan-2020 20 Pieces Matwhite Tiles GGPS Musajaan toilet floor level repa 2000 1315 20-Jan-2020 6 pieces clums 2 kawal 100 1316 20-Jan-2020 Daily visit 2000 1317 21-Jan-2020 Daily visit 2000 1318 21-Jan-2020 lunch 200 1319 22-Jan-2020 labor food & Refreshment 650 1320 22-Jan-2020 Disposible stuff for IMC 30 1321 22-Jan-2020 Color Karigar for chamtar 2000 1322 22-Jan-2020 Emaad and Aman Ullah for chamtar windows cleaning 2000 1323 22-Jan-2020 Gul Mason 650 1324 22-Jan-2020 Daily visit by rickshaw (Akhtar Hussain) 1500 1325 22-Jan-2020 Electrician work Chamtar Handover time 1500 1326 22-Jan-2020 lader Carriage 200 1327 22-Jan-2020 Petrol for Paint emulsion chamtar 50 1328 22-Jan-2020 2 Quarter Distumber GGPS chamtar 640 1329 22-Jan-2020 1 Piece Selicon, 1 P Gleue, Chalk, 4 P Maks and theshai Chamtar 590 1330 23-Jan-2020 Lader Carriage 100 1331 23-Jan-2020 Gul Mason for ghalader beam setting 1000 1332 23-Jan-2020 color wala for chamtar musajaan havdover setting 1100 1333 23-Jan-2020 Emad and Amanullah for window cleaning musajaan 2000 1334 23-Jan-2020 Labor for general cleaning musajaan 600 1335 23-Jan-2020 labor lunch 220 1336 23-Jan-2020 lader Rent 70 1337 23-Jan-2020 daily visit 2000 1338 23-Jan-2020 3/4" wall, 3/4" Nozel and mazdori chamtar handover day work 760 1339 23-Jan-2020 2 Wifer, 1 bruch for cleaning, 3 balti and selicon on chamtar ha 1470 1340 23-Jan-2020 2 ceiling fans, 3/29 wire mazdori chamtar handover day 4770 1341 23-Jan-2020 Shahab by sajjad sb. 1000 1342 24-Jan-2020 Paint, brush, regmal, mazdori 2180 1343 24-Jan-2020 daily visit 2000 S.No Date Description Amount 1344 24-Jan-2020 Gul Bahahadur Sanitory wala waheed ullah payment (arshad) 1345 24-Jan-2020 Daily visit 2000 1346 24-Jan-2020 Bill Attaced 1700 1347 24-Jan-2020 zia electrician 1000 1348 24-Jan-2020 color wala for waheed Ullah 200 1349 24-Jan-2020 labor lunch 200 1350 24-Jan-2020 Daily Visit 2000 1351 24-Jan-2020 Emaad & Amaan Ullah Cleaning of window Ghalader 1200 1352 24-Jan-2020 Ghalader Electricity bill for Jan-20 400 1353 24-Jan-2020 labor lunch 250 1354 24-Jan-2020 wajid color wala for ghalader setting 1000 1355 24-Jan-2020 daily visit 2000 1356 24-Jan-2020 plaster of paris 100 1357 24-Jan-2020 Emad, waheed for collecting and carriage to hathian project st 2600 1358 24-Jan-2020 saleem for labor payment 6000 1359 24-Jan-2020 saleem in previous salary 2000 1360 24-Jan-2020 labor lunch 300 1361 24-Jan-2020 daily visit 2000 1362 24-Jan-2020 daily visit 2000 1363 4-Feb-2020 1 wheel barrow tyre & 1 Belcha purchased 1550 1364 4-Feb-2020 Purchased for concrete pipes for extra work surpul 2000 1365 4-Feb-2020 daily visit 2000 1366 9-Feb-2020 Emaad chinchi wala for Ghori rent and trips 1200 1367 9-Feb-2020 Daily visit 2000 1368 9-Feb-2020 1 Quarter white color, brush and petrol 320 1369 9-Feb-2020 labor lunch 250 1370 14-Feb-2020 Tile karigar for extra work for level 1000 1371 14-Feb-2020 labor food 400 1372 14-Feb-2020 Shoib tile karigar for 2 days fuel 500 1373 14-Feb-2020 daily visit 2000 1374 15-Feb-2020 daily visit surpul, ajmal lohar and surpul 2000 1375 15-Feb-2020 Emaad 1000 1376 15-Feb-2020 Bilal for mixer carriage to Gujjar Ghari 1500 1377 15-Feb-2020 Saleem supervisor for expences 3000 1378 15-Feb-2020 IMC Lunch 1350 1379 16-Feb-2020 Labor Payment for extra work planth protechtion surpul 12200 1380 16-Feb-2020 saleem in his salary through easy paisa 2800 1381 16-Feb-2020 ISB visit for sample approval Blue, raja bazar 4000 1382 16-Feb-2020 Taxi for sample carriage from raja to Blue Area 800 1383 18-Feb-2020 Emaad Chinchi wala for his trips 1000 1384 18-Feb-2020 saleem in his salary 5000 1385 18-Feb-2020 daily visit 2000 1386 19-Feb-2020 zafar marble polish wala 5000 1387 19-Feb-2020 IMC refreshment 1400 1388 19-Feb-2020 sameer for electric struffs on behalf of Akbar Ali through easypaisa 1389 19-Feb-2020 daily visit 2000 1390 19-Feb-2020 communication 1250 1391 20-Feb-2020 saleem in his salary through easy paisa 5000 1392 21-Feb-2020 ISB visit for retrofitting cheque collection 3000 1393 21-Feb-2020 Lunch 700 1394 23-Feb-2020 2 Balti for Ghalader school 300 1395 23-Feb-2020 louver advance payment to Ajmal lohar 10000 1396 23-Feb-2020 Zarif as his color for waheed Ullah payment 1397 23-Feb-2020 Daily visit waheed to surpul 2000 1398 23-Feb-2020 saleem for expencses 2000 1399 24-Feb-2020 IMC Refreshment 580 S.No Date Description Amount 1400 24-Feb-2020 Daily visit IMC Office, Waheed, Surpul 2000 1401 24-Feb-2020 Nemat kada meeting 140 1402 24-Feb-2020 daily visit IMC office visit 1500 1403 24-Feb-2020 1 Regmal etc. 160 1404 24-Feb-2020 Daily visit 2000 1405 24-Feb-2020 Daily Visit 2000 1406 24-Feb-2020 IMC Refreshment 1750 1407 24-Feb-2020 Gul Mason Ffor waheed ullah beam & roof setting 1100 1408 24-Feb-2020 Ghalader Main gat setting by lohar 1400 1409 24-Feb-2020 Gori rent 200 1410 24-Feb-2020 Ghalader bathroom railing welding 400 1411 24-Feb-2020 saleem for expencses through easypaisa 500 1412 24-Feb-2020 Ash white color for waheed ullah purchased 1050 1413 24-Feb-2020 Floor tile for waheed ullah toilet block purchased 400 1414 24-Feb-2020 O Clums for ghalader bathroom purchased 220 1415 24-Feb-2020 Daily Visit 2000 1416 24-Feb-2020 Shoib tile karigar 2000 1417 24-Feb-2020 Waheed Ullah color work labor payment 3000 1418 24-Feb-2020 Hussain Sanitory Siyyad 320 1419 24-Feb-2020 Shahab for expenses 1000 1420 24-Feb-2020 ISB Visit 3000 1421 24-Feb-2020 Gul Mason 1000 1422 24-Feb-2020 Labor lunch 500 1423 24-Feb-2020 Emaaad chinchi wala for his trips 200 1424 24-Feb-2020 20 Bags Cement, Crush and sand GGPS Sur Pul Additional Work 20900 1425 24-Feb-2020 Steel Nadeem steel last payment 9000 1426 24-Feb-2020 Surpul extra work exevation by Emaad 2000 1427 24-Feb-2020 daily visit 2000 1428 24-Feb-2020 daily visit 2000 1429 24-Feb-2020 Hussain sanitory wala siyyad last payment 56280 1430 24-Feb-2020 Surpul extra work exevation by Emaad 6000 1431 25-Feb-2020 Mingora Trip for cash 2500 1432 26-Feb-2020 Saif Ul Islam bill 3500 1433 27-Feb-2020 daily visit 2000 1434 27-Feb-2020 labor payment by saleem for surpul extra work 6200 1435 27-Feb-2020 Ghalader stock wala for surpul Extra work material 20900 1436 27-Feb-2020 Zarif labor for 3 days dehari at ghalader and waheed Ullah 3000 1437 27-Feb-2020 Mansoor sanitory wala for ghalader tollet floor and surpul pipe 1500 1438 27-Feb-2020 25 sokets, 25 Elbow etc 130 1439 27-Feb-2020 labor lunch 200 1440 3-Mar-2020 daily visit 2000 1441 3-Mar-2020 payment to Said Alam Stock wala 100000 1442 16-Mar-2020 stamps as NCC for three schools musa, cham and waheed 200 1443 16-Mar-2020 lunch 500 1444 17-Mar-2020 saleem in his salary through easy paisa 3000 1445 17-Mar-2020 daily visit 2000 1446 19-Mar-2020 dialy visit butserri handover day 2000 1447 14-May-2020 sanitizer 780 1448 15-Jun-2020 11 stopers purchased GGPS sur pul 2200 1449 24-Jun-2020 mask and Glus GGPS but serri repir work 350 1450 24-Jun-2020 OFF white color + scraper purchased 1200 1451 24-Jun-2020 Color labor payment 2000 1452 24-Jun-2020 dialy visity 2000 1453 24-Jun-2020 Weather shield and plaster of paris purchased 890 1454 24-Jun-2020 Bill Attached 930 1455 24-Jun-2020 labor food and refreshment 660 S.No Date Description Amount 1456 24-Jun-2020 Aluminium karigar 1200 1457 24-Jun-2020 plane mirror for window GGPS but serri 750 1458 1-Jul-2020 ISB visit for bracket fans and Tube lights additional work surpu 5000 1459 1-Jul-2020 20 LED tube lights, 3 metre and 2 breaker purchased 31800 1460 1-Jul-2020 6 Mega bracket fans purchased 30900 1461 3-Jul-2020 labor food and refreshment additional work surpul 400 1462 3-Jul-2020 bill attached 330 1463 3-Jul-2020 bill attached 100 1464 3-Jul-2020 dialy visit 2000 1465 5-Jul-2020 daily visit 2000 1466 5-Jul-2020 3 Packet rawal plug 90 1467 5-Jul-2020 50 pieces screws and 2 salotion taps 100 1468 5-Jul-2020 electric stuffs with cable 5912 1469 6-Jul-2020 electric stuffs 1860 1470 6-Jul-2020 labor refreshment 170 1471 6-Jul-2020 labor refreshment 140 1472 6-Jul-2020 IMC and lbaor lunch 830 1473 6-Jul-2020 base plates for stoppers 300 1474 6-Jul-2020 daily visit 2000 1475 7-Jul-2020 expenses will be taken from shahab 1476 7-Jul-2020 daily visit 2000 1477 8-Jul-2020 laboer advance payment to ajmal lohar 20000 1478 8-Jul-2020 1 bit 14: and 1 chabi 15 size 240 1479 8-Jul-2020 base plates for lourvers with wholes 10850 1480 8-Jul-2020 rawal bolts for louvers fixing 1610 1481 8-Jul-2020 louvers carriage to school 1000 1482 8-Jul-2020 labor refreshement 100 1483 8-Jul-2020 labor lunch + IMC refreshment 420 1484 8-Jul-2020 generator carriage to surpul 1000 1485 8-Jul-2020 generator fuel 250 1486 8-Jul-2020 daily visit 2000 1487 9-Jul-2020 Electrician worker payment for 4 days 5200 1488 9-Jul-2020 daily visit 2000 1489 9-Jul-2020 payment to sur pul school headmistress for bore 2000 1490 9-Jul-2020 wall pati 1 gallon + acrolic 1 packet 700 1491 9-Jul-2020 1 gallon paint + 1 grinder blade 2200 1492 9-Jul-2020 1 piece half padestal wash basin + fixing stuffs 9710 1493 9-Jul-2020 labor lunch + IMC refreshment 450 1494 9-Jul-2020 sanitory worker payment 500 1495 11-Jul-2020 4" elbow 180 1496 11-Jul-2020 bill attched 280 1497 11-Jul-2020 plane mirror for window 100 1498 11-Jul-2020 labor refreshment 1000 1499 11-Jul-2020 sanitory worker payment 1000 1500 11-Jul-2020 aluminium karigar 1600 1501 11-Jul-2020 marble karigar payment 2000 1502 11-Jul-2020 daily visit 1300 1503 13-Jul-2020 2 cooler + 2 buckets for surpul on madam demand 200 1504 13-Jul-2020 2 Mat white tile for toilet block 90 1505 13-Jul-2020 1 color brush 450 1506 13-Jul-2020 1 open SMD for toilet block 400 1507 13-Jul-2020 2 tube light choke 260 1508 13-Jul-2020 2 KG hot bitumin 140 1509 13-Jul-2020 IMC Refreshment 1500 1510 13-Jul-2020 submersible rewind GGPS sur pul 1000 1511 13-Jul-2020 Emaad 1000 S.No Date Description Amount 1512 13-Jul-2020 Electrician worker payment for 4 days 2000 1513 13-Jul-2020 daily visit 2000 1514 14-Jul-2020 daily visit 3000 1515 15-Jul-2020 emaad 2000 1516 15-Jul-2020 daily visit 2000 1517 17-Jul-2020 daily visit with IMC, Education and ImC department two location 10000 1518 29-Jul-2020 daily visit 200 1519 29-Jul-2020 refreshment 2000 1520 29-Jul-2020 visit with IMC for DLP punch list ghalader 39000 1521 2-Sep-2020 ajmal lohar kata 2000 1522 2-Sep-2020 visit with iIMC for DLP punch list chmtar and Musajaan 2725 1523 3-Sep-2020 3 Pieces windows Mirror 70 1524 4-Sep-2020 2 KG paris and Majic pack 280 1525 5-Sep-2020 1 pond white paint and regmal 180 1526 5-Sep-2020 Ghalader paint labor lunch 1600 1527 5-Sep-2020 Aluminium karigar 700 1528 5-Sep-2020 3 person lunch 3000 1529 5-Sep-2020 daily visit shaheedan bazar, ghalader, chmtar, musajaan and 320 1530 5-Sep-2020 Door stipper 2716 1531 6-Sep-2020 36 pieces block, sand, 1 bag cement with carriage feroz pur m 50 1532 6-Sep-2020 toilet block hand railing holes lpening 50 1533 6-Sep-2020 plaster of paris 300 1534 6-Sep-2020 labor lunch 2050 1535 6-Sep-2020 2 paint labor payment ghalader and chmtar work 2500 1536 6-Sep-2020 daily visit 7000 1537 6-Sep-2020 distumber, weather shield, brushes and scraper 220 1538 7-Sep-2020 1 pquarter distumber and 460 1539 7-Sep-2020 1 quarter white paint and petrol 1100 1540 7-Sep-2020 1 gallon distumber and plaster of paris 110 1541 7-Sep-2020 labor refreshment 1542 7-Sep-2020 labor lunch 340 1543 7-Sep-2020 IMC, M&E, C&W and Education department refreshment 450 1544 7-Sep-2020 labor refreshment 90 1545 7-Sep-2020 1 labor payment for chamtar and musajaan work 1200 1546 7-Sep-2020 daily visit 2000 Total 8059175
bike petrol 350
Sajjad sb. Expenses 4213173 Retrofitting Chamtar 5 days Activity 459130 Farhad Services 700000 Ihsan 400000 Shahab 475000 Zohaib 300000 Before Grrad Slab Expenses 1835708 After Grad Slab 13/2/19 to 9/4/19 248652 Total 8632013 Approx Said Alam Kata 173507 Approx Concrete Rings wala Muhammad Ali 25000 Approx Zahid Electrician 20000 Approx Sameer ISB 22000 Approx But Serri Payable Amount (Akbar + Arshad) 80000 Approx Ghalader Stock wala Haji sSb. 60000 Approx Marble payment 40000 Approx Javed Bitument Bill 33300 Approx Asfandyar PT 20000 S.No Date Description Amount Total 473807 Grand Total 17164995